Search Documents

  • SME
    Construction Of The Pacheco Pumping Chamber And Shafts

    By Russell Clough

    The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re

    Jan 1, 1985

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • AUSIMM
    Rock fill consolidation for the extraction of sill pillar stopes at Toguraci gold mine

    By A Proudman, J Isles, R Lawolo, G Forster

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates two underground

    Oct 16, 2017

  • AUSIMM
    Presidential Address, 1968: The Standards We Inherit

    At last year's. annual meeting of The Institute, Sir George Fisher, as President, compared it somewhat nostalgically with a meeting of its kind in the 1920s when comment was expressed on the decl

    Jan 1, 1968

  • SAIMM
    Pyrometallurgy At Mintek

    By T. R. Curr, R. T. Jones

    Keywords: Pyrometallurgy, Mintek, DC arc furnace, plasma, smelting, chromite, ilmenite, cobalt, slag, zinc fuming, dust, magnesium, laterite, ferronickel, arc modelling, Pyrosim, thermodynamics Th

    Jan 1, 2006

  • TMS
    Carbon-thermal Reduction Process for making Al-Si Alloys from Al2O3-SiO2 Containing Industrial Wastes

    By Jilai Xue

    Industrial wastes containing 30-50 wt.% Al2O3 and 40-60 wt.% SiO2 may serve as an alternative resource for producing Al-Si alloys. Various raw materials such as used refractory materials from metallur

    Jan 1, 2010

  • CIM
    The Fundamental Relationship Between Sample Mass and Sampling Variance in Real Geological Samples and Corresponding Statistical Models

    "In mineral exploration and mining applications, it is sometimes necessary to reduce sampling error in order to improve representivity of individual sample assays. Historic efforts to reduce sampling

    Jan 1, 2007

  • SAIMM
    Slope Monitoring Strategy At PPRust Open Pit Operation

    By M. J. Little

    Potgietersrust Platinums Ltd (PPRust) is Anglo Platinum?s only open pit operation. The major slope stability concern at PPRust is rapid, small-scale brittle failure on the west wall of Sandsloot open

    Jan 1, 2006

  • NIOSH
    The Mineral Industry Of Other West African Countries - Benin (e8cbf5f1-567f-42dd-9853-7bc37da6ef95)

    By George A. Morgan

    There was little change in the mineral industry of Benin in 1986, as the economy remained in the grip of a regional recession exacerbated by failing oil prices, which nullified much of the income from

    Jan 1, 1988

  • DFI
    Soil-Cement Columns For Building Foundations

    By Osamu Taki

    The development of new auger bits for soil cement column drilling equipment has made it possible to create a homogeneous mixture of soil and cement-reagent slurry. As a result, soil-cement columns are

    Jan 1, 1992

  • SME
    Measurement of Overburden Failure Zones in Close Multiple-Seam Coal Mining

    Because of its small interburden thickness, concentrated stress distributions, high coal seam metamorphism, and complex geological conditions, mining the five coal seams (Nos. 5, 7, 8, 9 and 12) of Ka

    Jan 7, 2020

  • SME
    Another Disappointing Year for Industrial Minerals

    A glance at the following chart reveals that because of the continued poor economy, the slump in industrial mineral production continued into 1980. Gypsum was down 17% from 1979; cement down 9%, sand

    Jan 5, 1981

  • SAIMM
    Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold Mine

    By D. F. Malan, Y. Jooste

    "SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac

    Jan 1, 2015

  • AUSIMM
    Bioheapleaching of Black Schist-Hosted Nickel-Copper-Cobalt- Zinc Ore in Subarctic Conditions at Talvivaara, Finland

    Talvivaara deposits, Kuusilampi and Kolmisoppi, comprise one of the largest sulfide nickel resources in the world with 642 Mt in Measured and Indicated Resource categories. TalvivaaraÆs preferred extr

    Jan 1, 2009

  • AUSIMM
    Recovery of the Undercutting Front in a Mine with Conventional Panel Caving – Case Study at North Reserves Sector, El Teniente Mine

    By N Rivera, A Music, C Cisternas

    In an underground mine operated with panel caving and subjected to high stresses, geotechnical events such as collapses or rock bursts are fairly recurrent. Both situations can involve risks for peopl

    May 9, 2016

  • SME
    Site Development Over an Abandoned Coal Mine

    By Gennaro G. Marino

    During the preliminary design stages of the Illinois Division of Natural Resources(DNR) building, it was discovered that an old coal mine was present some 70 m (220 ft) beneath the building site. Th

    Jan 1, 2000

  • SAIMM
    The Sasol Engineering Leadership Academy(Part of the Sasol Chair in Safety Health and Environment initiative in the Department of Mining Engineering, University of Pretoria)

    By T. Kagogo, M. Neser, C. Knobbs, E. Gerryts

    "Contrary to the way it is often portrayed, the average organization or company is far from being a cold, calculating machine. It is actually a highly emotive place where interaction with people is a

    Jan 1, 2014

  • SAIMM
    The Sasol Engineering Leadership Academy

    By C. Knobbs

    Contrary to the way it is often portrayed, the average organization or company is far from being a cold, calculating machine. It is actually a highly emotive place where interaction with people is a f

    Jan 1, 2014

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • AUSIMM
    Cuprous Hydrometallurgy Part VII. Separation and Purification of Copper(I) Chloride from a Chlorination Roast of Kambalda Nickel Matte using Solutions of Aqueous Acetonitrile

    By Parker A. J, Muir D. M

    Solutions of acetonitrile in water dissolve water soluble copper(I) chloride. Removal of volatile acetonitrile from the resulting solutions, by distillation with low grade steam, precipitates pure cop

    Jan 1, 1980