Search Documents

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Tuluwaka Mine – From Greenfield to Production in 14 Months

    By Ross Nairn

    "Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani

    Jan 1, 2006

  • SME
    Mine Development With Heavy Roadheaders

    By Robert A. Pond

    Heavy (exceeding 35 tons) roadheaders have not seen much use in the United States, but are used extensively in Europe to excavate many types of underground openings in civil and mining applications. E

    Jan 1, 1983

  • IIMP
    Proceso de producción metales preciosos en refinería de Ilo

    By Valentín Pamo

    El presente trabajo describe los procesos y equipos que permiten la extracción de metales preciosos de la refinería de Ilo en condiciones agresivas, obligando a investigar materiales resistentes a la

    Sep 9, 2007

  • SME
    Fluorspar – trends and changes in production and use

    By Lawrence Pelham

    Introduction Fluorspar demand or consumption has been taken for granted in recent years, except for those that produce, market, or consume the commodity. Thinking used to be that as the steel and alu

    Jan 11, 1986

  • AUSIMM
    Roasting of a Copper Sulfide Concentrate

    Roasting of a Copper Sulfide Concentrate

    Sep 13, 2010

  • SAIMM
    Sulphur Bonding In Solidified Ladle Slags

    By H. Preßlinger, H. Hiebler, K. Klepp, W. Posch, M. Mayr

    It was investigated in which form sulphur is bonded in ladle slags. For this purpose, the mineralogical phases of the ladle slags were qualitatively and quantitatively evaluated by means of a micropro

    Jan 1, 2004

  • SAIMM
    A Proposed Preliminary Model for Monitoring Hearing Conservation Programmes in the Mining Sector in South Africa

    By O. Nyandoro, K. Khoza-Shangase, M. Madahana, N. Moroe

    "Occupational noise-induced hearing loss (ONIHL) is classified as the leading work-related disability in the mining industry. ONIHL has a negative impact, on not only the health and occupational produ

    Jul 1, 2019

  • AUSIMM
    Some Analyses of Mount Lyell Ores, Rocks. ETC

    These may be of interest to members examining the collection of ores, etc., from Mount Lyell, which is a feature of the Victorian Gold Jubilee Exhibition, and may have some value as geological records

    Jan 1, 1902

  • CIM
    Troubleshooting Flotation Cell Operation Using Gas Velocity Measurements

    By Donald Leroux, Ralph Dahlke, Dave Scott, Finch. James A., Cesar O. Gomez

    "The efficiency of the flotation process depends on how effectively air is dispersed into small bubbles. Bubble surface area flux - the surface area of bubbles per unit time per unit cross-section are

    Jan 1, 2001

  • AUSIMM
    Different Methods of Alluvial Mining in Victoria

    Amongst representative men directing alluvial mining of erations in Victoria, some difference of opinion exists as to the best system of working the deep leads. The developmental operations of shaft-s

    Jan 1, 1902

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • NIOSH
    OFR-213-83 Slack And Overload Rope Protection System

    By Holt L. Farley

    This report describes the development of an electronic system which detects unsafe slack and overload conditions in underground mine hoist ropes. The Slack and Overload Rope Protection System (SORPS)

    Jan 1, 1983

  • SME-ICGCM
    Cementitious Seal/Rock Interface Under Hydrostatic And Dynamic Loadings (28th International Conference on Ground Control in Mining)

    By Khaled Morsy

    Cementitious seals are made of foamed cements with strength ranging from 100 to 600 psi. These cementitious seals are usually used at locations where the seal will be subjected to some convergence, as

    Jan 1, 2009

  • AUSIMM
    Evolution of Subaerial Magmatic-Hydrothermal Systems: A Comparative Study Between Koryu Au-Ag Deposit and Toyoha Polymetallic Deposit at Sapporo-Iwanai District, Hokkaido, Japan

    Sapporo-Iwanai district is located at the intersection of the northeast Japan arc and Kuril arc, associated with the subduction zone. This area is characterized by Miocene submarine volcanism followed

    Jan 1, 2005

  • SAIMM
    Application of magnetic separation technology for the processing of a colemanite ore - Synopsis

    By I. Alp

    Application of magnetic separation was investigated for the enrichment of colemanite ores by removing the magnetic gangue fraction. The detailed XRD analysis of the ore has indicated that the gangue f

    Jan 1, 2009

  • AUSIMM
    Real Time and In Situ Measurement of Elemental Composition Using Lasers

    Real Time and In Situ Measurement of Elemental Composition Using Lasers

    Sep 13, 2010

  • CIM
    Applications for Magnetic Mill Linings at the Horne Concentrator of Noranda Mines Limited

    By P. W. Godbehere

    "INTRODUCTIONMagnetic mill linings have been developed from an invention by Mr. Bertil Brandt, the originator of the Skega rubber lining. The OREBED magnetic mill lining is a concept in which rubber c

    Jan 1, 1983

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007