Search Documents

  • SME
    Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121

    This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i

    Jan 1, 2009

  • SAIMM
    A Model To Predict The Performance Of Roadheaders Based On The Rock Mass Brittleness Index - Synopsis

    By A. Ebrahimabadi

    Roadheaders are very versatile excavation machines used in tunnelling, mine development, and mine production for soft to medium strength rock formations. Performance prediction is an important factor

    Jan 1, 2011

  • SAIMM
    Plenary Speaker-Technical Aspects Of Closed Loop Cooling Water, Associated With The Pebble Bed Modular Reactor Demonstration Power Plant

    By Carl Havemann

    [PAPER PRESENTED AT THE 8thINTERNATIONAL CORROSION CONFERENCE HELD AT THE SA NATIONAL MUSEUM OF MILITARY HISTORY, SAXONWOLD JOHANNESBURG DURING 14-15 NOVEMBER, 2006.]

    Jan 1, 2006

  • ISEE
    Burn Cut Pull Optimization through Varying Relief Hole Depths

    By Michael Allen, Paul Worsey

    In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving

    Jan 1, 2015

  • SME
    Jet Grout Ground Modifications for the Brightwater Conveyance System

    By Richard Hanke

    Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,

    Jan 1, 2008

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • SAIMM
    Development Of Modified Gas Indices For Early Detection Of Spontaneous Heating In Coal Pillars

    By D. C. Panigrahi

    Extensive field studies have been carried out to investigate the pillar fire problems in one coal mine in India. A Thermal IR gun and a Thermovision camera have been employed for thermal scanning to a

    Jan 1, 2004

  • AUSIMM
    Application of Rotating Magnetic Field (RMF) to the Separation of Roasted Ilmenite

    By H Aral

    A rotating magnetic field can be produced in a magnetic separator by using a magnet rotor fitted with alternate north-south magnetic poles, similar to the rotors currently used in modern eddy current

    Jan 1, 2001

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • SME
    An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock Dumps

    By Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis

    The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,

    Jan 1, 2005

  • SME
    Moving Forward on New York’s Second Avenue Subway

    By David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh

    This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists

    Jan 1, 2007

  • SME
    Utilization of lignite fly ash as hydraulic binder and backfill material

    By I. Gombköto, G. Földing, G. Mucsi, B. Csoke, J. Faitli, B. Kovács

    This paper summarizes the main achievements of our previous project entitled "Development of a technological system producing quality guaranteed fly-ash based binder". Furthermore, this study deals wi

    Jan 1, 2011

  • AUSIMM
    Characterisation and Monitoring of the Stress State of Production Pillars at El Teniente Mine

    By R Munoz, R González, J Vallejos, A Delonca

    In panel caving in underground mines, it is essential to characterise and monitor the stress and stability state of production level pillars to ensure the extraction of the mineralised ore column and

    May 9, 2016

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • SAIMM
    Evaluation of some optimum moisture and binder conditions for coal fines briquetting

    By P. Venter, N. Naude

    "Coal mining is a thriving industry and 53% of the coal mined in South Africa is used for electricity generation. Mechanization has made coal mining more efficient, but fines generation has subsequent

    Jan 1, 2015

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • DFI
    The Dutch Cone Penetration Test And Its Use In Determining The Pile Bearing Capacity

    By C. Van der Veen

    The use of the quasi static (Dutch) Cone Penetration Test (CPT) is described as a tool to predetermine the ultimate bearing capacity of the pile point. An analysis is given why a purely theoritical ap

    Jan 1, 1989

  • SME
    An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement Suspensions

    By Christian Wawrzyniak

    An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol

  • SME-ICGCM
    Investigation of the Stability of a Pillar Retreat Section at the Fletcher Mine

    By Doug Tesarik

    Researchers from the National Institute for Occupational Safety and Health1 (NIOSH), together with employees from The Doe Run Company, are monitoring and evaluating the stability of a pillar retreat s

    Jan 1, 2006

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989