Search Documents

  • SAIMM
    Seismic Hazard In Western Australian Mines

    A Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western

    Jan 1, 2004

  • AUSIMM
    Problems With Acid Rock Drainage Predictions at the Ekati Diamond Mine, Northwest Territories, Canada

    The Ekati Diamond Mine is located on permafrost terrain in CanadaÆs Northwest Territories. The mine rock consists of: diamond-bearing and barren kimberlite; and surrounding waste rock such as granit

    Jan 1, 2003

  • CIM
    Flotation Treatment of Complex Sulphide Ores

    By M. J. Fairweather

    "The development of means to maximize the selectivity between galena and sphalerite in lead zinc ores is extremely important to the lead-zinc industry. Two challenging studies recently undertaken by C

    Jan 1, 1991

  • TMS
    Modeling Of Viscosities Of Imperial Smelting Furnace And Lead Blast Furnace Slags

    By Pengfu Tan

    A program ?SlagVis? has been developed to simulate the liquidus temperature, phase compositions and viscosities of ZnO-CaO-SiO2-Al2O3-?FeO? slag, such as Imperial Smelting Furnace (ISF) slag and lead

    Jan 1, 2005

  • SME
    Upper Rouge Tunnel CSO Control

    By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour

    To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage

    Jan 1, 2007

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • SAIMM
    Mining Grade And Sampling Theory - The Logical Way To Evaluate Ore Reserves

    By P. I. Page

    In mineral exploration the place that yields the first significant result is marked and two questions are posed immediately. Where should the next sample be drawn and how big should it be? At present

    Jan 1, 2005

  • ISEE
    Interpreting the Accuracy and Validity of Seismograph Recordings

    By John E. Wiegand

    "We will attempt to explain the basic workings of a modern seismograph and how the recorded data can be interpreted, not only for determining compliance to the regulations, but also in determining whe

    Jan 1, 1992

  • SME
    Art Schweizer: An Interview With the 2004 SME President

    Let’s start off with your assessment of the mining industry. Today, the status of the mining industry is stronger than it has been over the previous few years. While mining continues to be a major pa

    Jan 1, 2004

  • TMS
    Ultrasonic Detection Of Hydride Blisters In A ZR-2.5NB Pressure Tube

    By Yong-Moo Cheong

    When the zirconium pressure tube(PT) is in contact with the calandria tube(CT) in the pressurized heavy water reactor(PHWR), the temperature gradient between the inner and outer wall of the PT results

    Jan 1, 2006

  • SAIMM
    Improving processing by adaption to conditional geostatistical simulation of block compositions

    "Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s

    Jan 1, 2015

  • SME
    Coal Review

    By F. Freme

    Coal production in the United States in 2008 reached a record level of 1.06 Gt (1,171.5 million st), according to preliminary data from the U.S. Energy Information Administration (EIA) (Table 1). This

    Jan 1, 2009

  • CIM
    Detection of Hydrocyclone Malfunction

    By Arnaud Faucher, Claude Bazin, Marilène Renaud, Mohamed Mai Manga

    "Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the ident

    Jan 1, 2010

  • ISEE
    Journal: Big Sky and Beyond Explosives, Avalanches and Regulations

    By Mike Boissonneault

    It was three years ago when the “storm of the century” had taken a firm grip over the Pacific West Coast and inland areas. At the Big Sky ski resort in Montana on Christmas morning two ski patrollers

    Jan 1, 2001

  • DFI
    Limitations Of Predicting Deformations During Excavation In Soft Clay ? Summary

    By Richard J. Finno

    Detailed measurements made at a test section adjacent to a deep braced cut and other published data are combined to illustrate the limitations of the common methods of predicting movements associated

    Jan 1, 1991

  • TMS
    Phase Transformation Of Andalusite And Its Impacts On Refractory Brick Reinforcement

    By Bowen Li

    Andalusite is an excellent raw material for refractory applications due to its high aluminum oxide content and phase transformation to mullite at high temperature. Granular andalusite in particle size

    Jan 1, 2006

  • AUSIMM
    The Importance of Mineral Processing Technology for Establishing a Sustainable Society with an Environmentally-Sound Material Cycle

    For establishing sustainable material cycle process in human system, a brand new concept should be created, which could recycle the waste materials, which are land-filled and discarded under present e

    Sep 13, 2010

  • IIMP
    Sistema de modelamiento geológico para estimación de reservas mineras

    By Sashir Estela De la Cruz

    Actualmente la informática como herramienta aplicada al sector minero nacional, es importante -en tanto su empleo adecuado y racional implica alcanzar los objetivos planteados en forma más rápida y co

    May 25, 1998

  • NIOSH
    Water and Slurry Bulkheads in Underground Coal Mines: Design, Monitoring, and Safety Concerns

    By S. Harteis, D. Dolinar

    Many mining operations rely on bulkheads to provide a barrier between impounded water or slurry and active mine workings. However, bulkhead failures could cause and have caused catastrophic flooding

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005