Search Documents

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • SME
    Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives

    By M. A. Reyes, L. Yan

    Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i

    Nov 22, 2019

  • SAIMM
    Fundamental Analysis Of The Interaction Between Overburden Behaviour And Snook Stability In Coalmines

    By J. N. Van der Merwe

    In the process of pillar extraction, pillars are seldom if ever extracted completely. The pillar remnants, or snooks, play an important role in the extraction process. At the working face, they need t

    Jan 1, 2005

  • ISEE
    Cast Blasting in the Light of the Electronic Option

    By Winfried Rosenstock

    The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi

    Jan 1, 2003

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

  • SME
    Exploratory Shaft Design For The Salt Repository Project

    By S. A. G. Poppen, M. B. Mirza, A. I. Cooley

    The U.S. Department of Energy (DOE) is responsible for siting and constructing a licensed geologic repository for commercially generated high-level nuclear waste. Within DOE, the Office of Civilian Ra

    Jan 1, 1987

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • SME
    New Polymeric Dispersants For Industrial Minerals

    By T. J. Lynch

    A new class of polymeric dispersants for industrial minerals has been synthesized and evaluated. Currently available dispersants give initial low viscosities at high mineral loadings, however slurry

    Jan 1, 2012

  • SAIMM
    Fluid Bed Chlorination Pilot Plant At Mintek - Synopsis

    By A. Kale

    A chlorination pilot plant having capacity to produce 5?10 kg/hr of titanium tetrachloride is in operation at the chlorination facility in Mintek. The bubbling fluid bed chlorination plant can be oper

    Jan 1, 2011

  • DFI
    High Stress Pile Testing At Soldier Field

    By Michael H. Wysockey

    The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu

    Jan 1, 2002

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SAIMM
    The Prediction Of Underground Drilling Noise

    By G. S. Harper

    Noise in general and drilling noise in particular have received increasing attention within the South African mining industry during the last 10?15 years. The Mine Health and Safety Committee1, during

    Jan 1, 2006

  • CIM
    The Right Tools in the Right Place: How Xstrata Nickel Australasia Increased Ni throughput at its Cosmos Plant

    By Michael Young, Josh Rubenstein, Michael Cooper, Tom Shouldice, Dan Curry

    "Xstrata Nickel Australasia’s Cosmos plant in Western Australia is currently implementing a debottlenecking project to increase nickel output while maintaining metallurgical performance and a low unit

    Jan 1, 2010

  • DFI
    Ultimate Skin Friction Of Single Batter Piles In Sand ? Synopsis

    By A. M. Hanna

    This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp

    Jan 1, 2010

  • SME
    Comparison Of Arched And Flat Seal Designs Using Finite Element Analysis

    The failure of a seal in an underground coal mine can have devastating consequences. Traditionally seals have been constructed as flat walls. Large hydraulic dams, on the other hand, are constructed

    Jan 1, 2007

  • SAIMM
    Sampling In The South African Minerals Industry

    Although not fully accepted in South Africa, the Theory of Sampling originally proposed by Pierre Gy is fast becoming the cornerstone of sampling practice throughout the world. The growing acceptance

    Jan 1, 2014

  • IIMP
    Minería responsable en zona de amortiguamiento de áreas naturales protegidas: caso de Poderosa en Parque Nacional Río Abiseo

    By José Calderón

    Poderosa tiene sus concesiones en las provincias de Pataz y Bolívar en la región La Libertad y son parte de la zona de amortiguamiento (ZA) del parque nacional Río Abiseo (PNRA) y de la zona de transi

    May 22, 2019

  • SME
    Solvent Extraction Approach To Recover Boron From Wastewater Generated By The LCD Manufacturing Industry: Part 1

    By D. Mohapatra

    The possibility of using 2,2,4-trimethyl-1,3-pentanediol dissolved in tetrachloromethane as extractant for boron recovery is discussed. The parameters optimized for this purpose are contact time, boro

    Jan 1, 2008

  • SME
    Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

    By Lorenzo Pellegrini

    The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and

  • IIMP
    Comportamiento estructural y mineralización de estaño-cobre. Mina San Rafael: Puno-Perú

    By Julver Álvarez

    El presente trabajo describe el comportamiento estructural y mineralización del estaño-cobre en la mina San Rafael, Puno. En este sentido, las pizarras de la formación Sandia del Ordovisco Superior, p

    Sep 13, 2001