Search Documents

  • TMS
    Effects Of Temperature And Precursors On Preparation Of Fe-Tic Composite From Ilmenite

    By Sutham Niyomwas

    The Fe-TiC composite powder was synthesized in situ by carbothermal reduction of ilmenite. The standard Gibbs energy minimization method was used to calculate the equilibrium composition of the reacti

    Jan 1, 2006

  • SAIMM
    Simulation Of Time-Dependent Crush Pillar Behaviour In Tabular Platinum Mines ? Synopsis

    By J. A. L. Napier

    It has been established that significant time-dependent stope convergence may occur over time periods of hours and days in certain hard-rock gold and platinum mines. The source of this time-dependent

    Jan 1, 2012

  • DFI
    Overview Of Design Methods Of Axially Loaded Piles In Europe

    By Flor De Cock

    The paper reflects part of the work from the European Regional Technical Committee on Piles (ERTC3) during its mandate between 1994 and 1999, and, in particular, describes the find­ings from an Intern

    Jan 1, 2002

  • SME
    Equipment Maintenance – Tips on Maximizing Mining-Equipment Engine Life

    By Reginald Dias

    Mining equipment life may be extended through preventive maintenance and the proper application of quality lubricants. There are several practices mine operators should consider implementing to prese

    Jan 1, 2004

  • SAIMM
    Large-scale 3D characterisation of in-situ stress field in a complex mining district prone to rockbursting

    By J. P. Josien, J. F. Noirel, F. Lahaie, P. Bigarre, M. Al Heib

    ABSTRACT: In June 2001, a fatal rockburst affected a longwall face in the Houillères du Bassin de Lorraine (HBL), France. Subsequently, a large operation of in situ stress measurements by overcoring w

    Jan 1, 2003

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME
    Processing of Banded Hematite Quartzite Ore for Recovery of Iron Values Mining, Metallurgy and Exploration (86b8819b-6b05-4951-9ba6-26bcd1fd2904)

    By Nikhil Dhawan, Veeranjaneyulu Rayapudi

    This study investigates upgrading of low-grade banded hematite quartzite iron ore (Fe ~31%). Conventional beneficiation was found to be futile. The susceptibility of iron phases to microwave exposure

  • SME
    Emerald Mining in Afghanistan

    By Antoni Kalukiewicz

    From 1997 through 2000, a team of Polish experts headed by the author studied the prospects of mining newly discovered emerald deposits in Afghanistan. This article describes the scheme for mechaniza

    Jan 1, 2005

  • AUSIMM
    Mass Mining using Room and Pillar Methods at Estonia Oil Shale Mine

    The Estonia Mine, operated by Eesti Energia Kaevandused AS (EEK), the mining division of the Estonian Government's energy company, Eesti Energia AS, is a large room and pillar mine located in Eas

    Dec 6, 2010

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • AUSIMM
    In-Pit Crushing and Conveying (IPCC) - An Economic Alternative to Trucks that Delivers on Safety and the Environment

    If the industry keeps doing what it has always done, it will continue to get what it has always got - rising operating costs. Why is this so? Generally grades being chased are becoming lower, strippin

    Jun 1, 2010

  • ISEE
    Security and Control (476c288e-1831-4c21-a747-ee41961667e9)

    By Jim Mikelait

    Overview ?? Why do we need security? ?? Needs assessment ?? Elements to any security system ?? Protect, Detect, Alert, esponse ?? Electronic Security System Criteria ?? Advantages and Limitations of

    Jan 1, 2006

  • SME
    More Than 400,000 Expected at bauma 2004 in Munich

    bauma 2004 will feature a couple of firsts for one of the world’s largest construction and building materials machinery exhibitions. The event is scheduled for March 29 through April 4 of next year a

    Jan 1, 2003

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • SME
    AUV and ROV magnetometer surveys, compensation

    By Peter Kowalczyk

    Magnetic surveying and map production is well established in land based mineral exploration. Magnetic data are routinely used to map geology in covered terrains, to estimate the depth to basement in o

    Sep 1, 2014

  • SME
    Michael Karmis: An Interview With the 2002 SME President

    Your thoughts on the current status of the global minerals industries? The global economic, technological, social and political changes of the last two decades of the 20th century resulted in the e

    Jan 1, 2002

  • AUSIMM
    Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.

    IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside

    Jan 1, 1924

  • CIM
    Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines

    By Michael I. Brittan, Craig M. Sams

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si

    Jan 1, 2006

  • NIOSH
    IC 6116 Petroleum Refineries In The United States January 1, 1929 ? Introductory Summary

    By G. R. Hopkins

    According to reports received by the Bureau of Mines, Department of Commerce, as of January 1, 1929 there were 413 completed refineries in the United States, with a total daily crude-oil capacity of 3

    Jan 1, 1929