Search Documents

  • SME-ICGCM
    Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)

    By Dennis Dolinar

    Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins

    Jan 1, 2009

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • CIM
    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • SAIMM
    Pyrite roasting, an alternative to sulphur burning - Synopsis

    The roasting of sulphide ores and concentrates is often the first step in the production of metals or chemicals. In many processes, the production of sulphuric acid is viewed as a by-product, whereas

    Jan 1, 2009

  • SAIMM
    Comparison of linear polarization resistance corrosion monitoring probe readings and immersion test results for typical cooling water conditions

    By J. W. van der Merwe, A. Palazzo

    "Owing to the corrosiveness of the untreated brackish cooling water typically used for steel mills (and other environments), it is important to treat the water and monitor corrosion in such systems. G

    Jan 1, 2015

  • SAIMM
    The Complementary Aspects of Ion-Exchange Resins and Solvent Extraction in Copper Recovery Processes

    By A. Tsekov, Stefan Neufeind, T. Angelov, G. Savov

    "A complementary ion exchange/solvent extraction process for the recovery of copper from low-grade ores developed by Iontech Engineering Ltd. is described. It has successfully been implemented on a fu

    Jan 1, 2015

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • DFI
    A Simple Evaluation Of Dynamic Pile Tests

    By D. Kolymbas

    A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r

    Jan 1, 1989

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • CIM
    Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy

    By J. Châteauneuf, R. Dupéré, D. Mrabet

    "In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a

    Jan 1, 2016

  • SAIMM
    Computational fluid dynamic modelling of two phase flow in a hydrocyclone - Synopsis

    By M. J. Leeuwner

    Computational fluid dynamic (CFD) modelling is used to research the complex flow structures that exist in a hydrocyclone. By simulation of a two phase (water and air) flow system, the internal flow an

    Jan 1, 2008

  • ISEE
    Airblast Control Techniques in Open Cut Mines

    By Alan: Moore Richards

    Effective control of airblast requires that significant factors be identified and satisfied by blast design and careful implementation. Significant factors include charge mass, distance, face height a

    Jan 1, 2006

  • SME
    Ground Freezing A Proven Technology In Mine Shaft Sinking

    By Paul C. Schmall

    The link between artificial ground freezing and the mining industry stretches back more than 140 years, and across an ocean. Patented by the German scientist F.H. Poetsch in 1863, the technique is re

    Jan 1, 2007

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013

  • TMS
    Agent Based Modeling of Large-Scale Socio-Technical Metal Networks

    By I. Nikolic

    Twin-roll casting is an integrated casting and rolling process that involves the continuous solidification of a melt and the plastic deformation of the solidified metal between two rotating rolls. Com

    Jan 1, 2010

  • SAIMM
    Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? Synopsis

    By G. I. McPhail

    The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t

    Jan 1, 2012

  • DFI
    Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - Synopsis

    By S. Narasimha Rao

    Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc

    Jan 1, 1996

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • AUSIMM
    Geometallurgy - What do you Really Need to Know from Exploration through to Production?

    By K Ehrig

    You are a geologist, geometallurgist, or metallurgist/process engineer and are fortunate enough to work for an organisation who asks you to design/execute a geometallurgy program. What seems like a si

    Jul 15, 2013

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005