Search Documents

  • SAIMM
    A Methodology for Determining the Erosion Profile of the Freeze Lining in Submerged Arc Furnace

    By H. Dong

    This paper presents a heat conduction model to determine the erosion profile of freeze linings in a ferronickel submerged arc furnace. Kirchhoff transformation was adopted to simplify the nonlinear eq

    Jan 1, 2014

  • SME
    Exploration (2303cc71-ebf3-44eb-bd90-42769f9f3467)

    By D. R. Wilburn

    The worldwide budget for nonferrous, nonfuel mineral exploration was expected to increase by 58 percent in 2004 from the 2003 budget, according to Metals Economics Group (MEG) of Halifax, Nova Scotia.

    Jan 1, 2005

  • DFI
    Measured And Predicted Response Of Laterally Loaded Piles - Synopsis

    By K. Mallikarjuna Rao

    There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction

    Jan 1, 1996

  • SME
    Effect of Base Types on the Properties of MgO Particles Obtained from Dolomite Ore Mining, Metallurgy and Exploration (d56ba837-30c6-4908-8a45-5591799900b7)

    By Mahmut Altiner

    This study aimed to produce magnesium oxide (MgO) particles with different properties from dolomite ore using an experimental procedure comprising four stages: sample preparation (S1), HCl leaching (S

  • SME
    Effect of Base Types on the Properties of MgO Particles Obtained from Dolomite Ore Mining, Metallurgy and Exploration

    By Mahmut Altiner

    This study aimed to produce magnesium oxide (MgO) particles with different properties from dolomite ore using an experimental procedure comprising four stages: sample preparation (S1), HCl leaching (S

  • DFI
    Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction

    By Andrew L. Peterson

    CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac

    Jan 1, 1997

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989

  • DFI
    Embankment Piles ? Introduction

    By B. B. Broms

    Embankment piles are common in the Scandinavian countries (Kjellman, 1940) and in Southeast Asia as support of fills, light structures, bridge abutments and deep excavations (Eide, 1968) as described

    Jan 1, 2010

  • CIM
    Laboratoire d?analyse des fluids

    By Valérie Tremblay

    Plan de la presentation ?Laboratoire d?analyse des fluids ?Gestion des contaminants ?Condition Monitoring Avantages reliés aux analyses ?En savoir plus!! ?pour minimiser les coûts d?opération;

    Feb 1, 2008

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • IIMP
    Riesgos ambientales asociados a depósitos de relaves inestables

    By Luis Haro

    Puesto que el deslizamiento de relaves constituye uno de los principales riesgos para la vida y seguridad de los embalses, se desarrolló un programa que rehabilite los depósitos de los relaves a travé

    Sep 13, 2001

  • SAIMM
    Rhodax Inertial Cone Grinder

    By J. C. Taylor

    The Rhodax inertial cone grinder, designed by France?s FCB Group Fives, is the result of three years, theoretical and mechanical research in the field of compression grinding by the research staff of

    Jan 1, 1998

  • CIM
    The contour method of estimating mineral resources

    By W. E. Roscoe, H. Agnerian

    The contour method can be used to estimate the mineral resources of a mineralized body. It relies on geological interpretation and allows the geologist to determine the plunge of a mineralized ore sho

    Jan 1, 2002

  • SAIMM
    Limitations in Accepting Localized Conditioning Recoverable Resource Estimates for Mediumterm, Long-Term, and Feasibility-Stage Mining Projects, Particularly for Sections of an Ore Deposit

    A localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area

    Jan 1, 2014

  • SME
    Investigation Of Exposures To Commercial Asbestos In Northeastern Minnesota Iron Miners Who Developed Mesothelioma

    By Wendy M. Brunner

    A 70% excess of mesothelioma, an asbestos-related cancer, has been reported among men in northeastern Minnesota, where iron mining has been the major industry. The Minnesota Department of Health has

    Jan 1, 2007

  • ISEE
    Usability of Expert System Integrated With GIS in Blasting Operations

    By U. Gorkhan Akkaya, N. Enver

    Geographic information system (GIS) is one of the most accurate and useful tools to help decision – making for decision-makers. As to expert systems, it provides solutions to the problems faced by mim

    Jan 1, 2013

  • SME
    Separation and Recovery of Iron and Nickel from Low-Grade Laterite Nickel Ore Using Reduction Roasting at Rotary Kiln Followed by Magnetic Separation Technique Mining, Metallurgy and Exploration

    By Yang Ge, Yuzhu Pan, Mansheng Chu, Jue Tang, Cong Feng, Lihua Gao, Zhenggen Liu

    The low-grade nickel laterite ore used in this study was successfully upgraded through selective reduction by industrialized rotary kilns followed by magnetic separation. The results indicated that bo

  • SME
    Multi-Attribute Selection Method For Mining Trucks

    By D. Komljenovic, V. Kecojevic

    Selection of the best possible truck type (model) is of crucial importance for the mine decision-makers. In this paper, authors contribute to the body of knowledge by developing a novel methodology f

    Jan 1, 2007

  • NIOSH
    OFR-127-80 Improved Light-Scattering Dust Monitor

    By Byron S. Kutscher

    This report summarizes the program to develop and construct an improved light-scattering dust monitor (ILSDM). This improved light-scattering dust monitor, which operates on the forward light scatteri

    Jan 1, 1980

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010