Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)

    By Brian White

    Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p

    Jan 1, 2002

  • SME-ICGCM
    Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress Report

    By Yi Luo

    Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und

    Jan 1, 2002

  • SME-ICGCM
    Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics Investigation

    By K. Y. Haramy

    Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr

    Jan 1, 1988

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001

  • SME-ICGCM
    Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)

    By S. J. Mitchell

    An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz

    Jan 1, 1984

  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Time Dependent Strength Of Coal Strata For Long-Term Pillar Stability

    By Z. T. Bieniawski

    A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest

    Jan 1, 1994

  • SME-ICGCM
    Evaluation Of Subsidence Parameters For Inclined Seams In UK Coalfields

    By X. L. Yao

    This paper analyses the effects of mining extraction geometry (width/depth ratio) and dip of seam on subsidence parameters based on a large Database, containing 120 longwall mining cases all within th

    Jan 1, 1990

  • SME-ICGCM
    Resupporting High Roof Falls

    By Nicholas Chlumecky

    One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is

    Jan 1, 1981

  • SME-ICGCM
    Load Transfer Mechanics In Fully-Grouted Roof Bolts

    By Maynard O. Serbousek

    The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b

    Jan 1, 1984

  • SME-ICGCM
    A Case History of Computer-Aided Lineament Analysis for Ground Control Planning

    By C. D. Peters

    The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu

    Jan 1, 1986

  • SME-ICGCM
    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Subsurface Fracture Development Due To Longwall Mining And Its Interpretation Using Image Processing Techniques (736b40e1-a21a-40c0-a678-75088df69d02)

    By Gexin Sun

    This paper presents the physical modelling results of subsurface fracture development associated with longwall mining operations and an application of image processing techniques to interpretion of th

    Jan 1, 1992

  • SME-ICGCM
    Geomechanical Criteria of Longwall Face Support Selection at Consol Mines

    By D. W. H. Su

    This paper describes geomechanical criteria employed by Consol Energy for selecting mine-specific longwall face supports in the past decade. The criteria include immediate and main roof rock character

    Jan 1, 2004

  • SME-ICGCM
    Numerical Modeling for Increased Understanding of the Behavior and Performance of Coal Mine Stoppings

    By Lisa Burke

    In underground coal mines, concrete block stoppings are widely used to control mine ventilation. Although stoppings are not intended as roof support, they are subjected to roof to floor convergence, a

    Jan 1, 2004

  • SME-ICGCM
    The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby Colliery

    By Brian Clifford

    Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane

    Jan 1, 2002

  • SME-ICGCM
    Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western China

    By Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li

    "The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat

    Jan 1, 2017

  • SME-ICGCM
    Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine Entries

    By Asmaa Yassien

    Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column

    Jan 1, 2002