Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Measurements of Horizontal Shear Movements Ahead of Longwall Mining and Implications for Overburden Behaviour

    By Jesse Puller, Ken W. Mills, Owen Salisbury

    "An underground coal mine located in New South Wales has a target coal seam located 160-180 m deep directly below a 16-20 m thick conglomerate unit that has been associated with significant periodic w

    Jan 1, 2015

  • SME-ICGCM
    Highwall Stability Implications from Longwall Mining at Broadmeadow Mine

    By Bob Coutts, Matt Martin, Dan Lynch, Dan Payne

    "The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach th

    Jan 1, 2018

  • SME-ICGCM
    Strata Behavior Monitoring of the Sub-Inclination Fully Mechanized Top-Caving Face in Steeply Dipping Extra Thick Coal Seam

    By Dongfeng Yun, Zhu Liu, Wendong Cheng, Zhendong Fan, Dongfang Wang, Yuanhao Zhang

    "For the purpose of studying the strata behavior due to multislicing top coal caving longwall mining along-the-strike direction in steeply dipping extra thick coal seams, the shield support pressures

    Jan 1, 2016

  • SME-ICGCM
    A New Rock Mass Failure Criteria Based On Rate Of Movement

    By Hamid Maleki

    A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved

    Jan 1, 1990

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Longwall Roof Fall Prediction and Shield Support Recommendations

    By Ulrich Langosch

    In the 1990s the German mining industry introduced a new generation of shield supports. The new design of support has a maximum load capacity of 10,000 kN, making these units as strong as the shields

    Jan 1, 2003

  • SME-ICGCM
    Improving Roof Control At A South African Coal Mine

    By Alan Bugden

    Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and

    Jan 1, 2001

  • SME-ICGCM
    Strata Control Investigations During Fully Mechanized Coal Pillar Extraction in Indian Coalfield

    By Rajendra Singh

    Considering the importance of a fully mechanized depillaring operation, the Indian coal mining industry has introduced a number of such depillaring operations at depths of cover ranging from 60 m to 3

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Experiences in a High Horizontal Stress Field at Inland Steel Coal Mine NO. 2,

    By C. Thomas Blevins

    This paper is intended to be a hands on experience account about ground control in a Southern Illinois coal mine. Its aim is to show how a combination of real world mining practices and constraints al

    Jan 1, 1984

  • SME-ICGCM
    Understanding the Causes of Roof Control Problems on a Longwall Face From Shield Monitoring Data ? A Case Study

    By Robert Trueman

    This paper details the results of an assessment aimed at understanding the shield loading mechanisms associated with strata-related issues on a longwall face. Shield load cycle analysis theories devel

    Jan 1, 2011

  • SME-ICGCM
    Weatherability Test of Rocks for Underground Mines

    By Kot F. Unrug

    The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit

    Jan 1, 1997

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Ribs (da729951-bd49-415c-b364-03a4e38bfd9c)

    By Michael Murphy, Khaled M. Mohamed, Berk Tulu

    "Failures of coal ribs are major hazards in underground coal mines. For the period of 2010 to 2014, rib falls were the leading cause of groundfall fatalities and accounted for 35% of all groundfall-re

    Jan 1, 2016

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)

    By Laxminarayan Holla

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of

    Jan 1, 1992

  • SME-ICGCM
    A Study of the Performance of Glass Fibre Rock Reinforcement Components

    By Jonathan P. Furniss

    The paper describes a range of laboratory tests undertaken on full column resin anchored glass fibre rockbolt systems, to assess all aspects of their performance. Laboratory instrumentation has been d

    Jan 1, 1997

  • SME-ICGCM
    Management of Initial Convergence Events at Broadmeadow Mine

    By D. G. Lynch, M. R. Martin, R. J. Coutts

    "Broadmeadow Mine is an underground longwall mine located in Central Queensland, Australia. The mine introduced a top coal caving (TCC) longwall face in 2013 but since then has experienced severe conv

    Jan 1, 2018

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010