Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Data Evaluation for Sustainable Development IndicatorsBy S. Möllerherm
"The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A
Jan 1, 2005
-
Gold mineralization in porphyry copper deposits discussedBy David J. Lowell
The gold content of porphyry copper deposits ranges from less than 0.05 g/t to more than I g/t ((0.0017 to 0.035 oz per st) and the average is about 0.05 g/t (0.0017 oz per st) gold. Perhaps the highe
Jan 1, 1989
-
Cellular Acclimation Of Acidithiobacillus Ferrooxidans To Sulfur BiooxidationBy C. -G. Zhang
This paper presents the results of a study on cellular acclimation of Acidithiobacillus ferrooxidans to sulfur biooxidation in terms of cells growth and changes in surface properties and morphologies
Jan 1, 2009
-
Hindsight Is 20/20?Reverse Engineering Tunnel Risk AnalysesBy Lee W. Abramson
Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,
-
Geology and Politics Determine Mineral Investment ClimateAttractive geology does not guarantee mining investment if a region’s policies are bad, according to mining executives surveyed in the Fraser Institute’s seventh Annual Survey of Mining Companies. Com
Jan 1, 2004
-
Assessing Small Underground Coal Mines For High Safety-Related RiskBy H. Kinilakodi
In 2008, the authors developed a methodology for assessing underground coal mines for high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated wi
Jan 1, 2011
-
Planning and Fast Track Tunnel Design in Historical Downtown CharlestonBy James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005
-
Appalachian Operators Maintain Significant ProductionBy Henry A. Signore
The Appalachian coalfield, located in eastern Kentucky, Pennsylvania, Virginia and West Virginia, has been one of the most productive in the United States. Total production from the Appalachian coalfi
Jan 1, 1995
-
Innovative NATM?Design For A Large Shallow Cavern At StanfordBy Thomas Marcher
Stanford Linear Accelerator Center (SLAC) is located in Menlo Park, CA. In order to allow for enhanced experiments, the current facilities required expansion. Tunnels were excavated through very weak
-
Modeling Metal Ion Removal In Alkylsulfate Ion Flotation Systems (d6f5ac24-85e9-412a-bdb7-096496820a4d)By F. M. Doyle
Metal removal kinetics and metal ion selectivity in ion flotation were studied from a thermodynamic perspective. Surface tension data could be used with the Gibbs adsorption equation to quantitativel
Jan 1, 2000
-
Operating speed assessments of underground mining equipmentBy J. P. Ducarme
Numerous fatal/nonfatal accidents involving underground workers struck by powered machinery occur yearly, with continuous miners and roof bolters involved in the majority of these accidents. In an att
Jan 3, 2010
-
Pumpable Roof Supports: An Evolution In Longwall Roof Support Technology (aa067599-8739-4939-97db-53d31f797a34)By T. M. Barczak
Pumpable roof supports provide an alternative approach to secondary support in underground mining. Unlike all other supports that are either partially or fully prefabricated prior to being transporte
Jan 1, 2008
-
Low-Rank Coal Ash Characterization- Washability And Utilization Implications – Preprint 97-132By P. D. Rao, D. E. Walsh
Chemical and physical properties of typical low-rank coal (LRC) ash are significantly different than bituminous coal ash. With the exception of extraneous ash, which is incorporated during mining or i
Feb 24, 1997
-
Northeast Interceptor Sewer Case HistoryBy Brett Zernich, Michael Krulc, Brett Robinson
This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade
Jan 1, 2005
-
Mine Development With Heavy RoadheadersBy Robert A. Pond
Heavy (exceeding 35 tons) roadheaders have not seen much use in the United States, but are used extensively in Europe to excavate many types of underground openings in civil and mining applications. E
Jan 1, 1983
-
Fluorspar – trends and changes in production and useBy Lawrence Pelham
Introduction Fluorspar demand or consumption has been taken for granted in recent years, except for those that produce, market, or consume the commodity. Thinking used to be that as the steel and alu
Jan 11, 1986
-
Middle Rouge Parkway Interceptor Extension—A Case HistoryBy Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty
The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in
Jan 1, 2007
-
Dewatering Of Fine-Particle Slurries Using A Compound-Beach Decanter With Cake-Flow Control (SME Annual Meeting Feb. 26-28, Denver, Colorado)By A. H. Shapiro
A decanter centrifuge of novel design was developed for the dewatering of fine-solids slurries having micron-range particles that form paste-like, flowable, hard-to-dewater cakes. The design combines
Jan 1, 2001
-
Pre-Support Measures for Shallow NATM Tunneling in Urban SettingsBy Vojtech Gall
Pre-support measures for urban tunneling have seen a substantial development in the recent past. Ground improvement techniques, pipe-arch and spiling methods now allow for non-disruptive tunneling at
Jan 1, 2008
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and ShaftBy Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007