Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud TunnelBy Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Evaluation of Pollution of Mining Areas in Aspect of their Future Use and DevelopmentBy D. J. Pyra, J. Kudelko, Korzekwam W.
Polkowice region (Lower Silesia, Poland) is an area, where the copper mining activity started about 40 years ago and new technologies were applied. There are 3 underground mines, 3 processing plants,
Jan 1, 2005
-
Experiences with Undermining by Coal in South AfricaBy J. N. Van der Merwe
The paper provides an overview of subsidence research which was done by the Sasol Company in South Africa over a period of more than six years. The magnitudes of subsidence elements in South Africa ar
Jan 1, 1986
-
Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access ProjectBy Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis
East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta
Jan 1, 2007
-
NAT 2018 Full Proceedings - NAT2018By Matthew Preedy, Brett Campbell, Jim Rush, Alan Howard, Derek Penrice
All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho
Dec 1, 2018
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New ZealandBy Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Vocational and Technical Education in Geoscience With Emphasis on Geochemical Exploration SkillsBy James A. Madonna
Several universities and colleges in Australia, Canada and the United States, recognized the need to establish or reorganize geoscience programs at the vocational and two-year technical levels. To acc
Jan 1, 1994
-
NATM Design For Stanford Linac Coherent Light Source TunnelsBy Jonathan Taylor, Irwan Halim, Frederick (Rick) Vincent
The new underground facilities for the LINAC Coherent Light Source project at the Stanford Linear Accelerator Center in Menlo Park, CA, are constructed in very weak sedimentary rock interspersed with
Jan 1, 2007
-
New York Subway Stations And Crossover Caverns—Update On Initial Support DesignBy Charles Stone, Hannes Lagger, Dru Desai
The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car
Jan 1, 2007
-
New Test Methodology For Estimating The Abrasiveness Of Soils For TBM TunnelingBy F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen
Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes
Jan 1, 2007
-
Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang
Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak
-
APPLICATION OF VIRTUAL REALITY IN THE MINING INDUSTRY – WHERE WE ARE NOW? - SME Annual Conference 2023By N. Akbulut, A. Anani
From the initial planning phases to the closing of a mine, mining is an industry where high attention, care, and sensitivity are needed in every step of the mine life. Since mining projects have a lon
Feb 1, 2023
-
Tellurium in modern and ancient black smoker systemsBy A. Yu. Lein, V. V. Maslennikov, S. P. Maslennikova, I. Y. u. Melekestseva, Yu. A. Bogdanov
Tellurium is a high-tech and also toxic element. This element shows sufficient contents in Fe-Mn crusts and nodules in the modern ocean to be involved in future industrial processes [Hein et al., 2003
Sep 1, 2014
-
Technology News – Atlas Copco Introduces Hydraulic BreakerThe HB 2500 hydraulic breaker attachment from Atlas Copco Construction Tools features Krupp percussion technology and a service weight of 2,500 kg (5,512 lbs). This makes it ideal for demolition, tunn
Jan 1, 2006
-
Tunneling for the Eastlink Project, Melbourne, AustraliaBy Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith
The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M
Jan 1, 2007
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Monitoring Successful NATM in SingaporeBy K. Zeidler, T. Schwind
The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo
Jan 1, 2007
-
Guadarrama Tunnel Construction with Double Shield TBMsBy F. Mendaña
The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented
Jan 1, 2007