Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hot Briquetting Of Fior Fines ? IntroductionBy R. M. Smailer
Detailed description of the development of the FIOR process1 and, subsequently, other technical papers relating to the operation and start up of the FIOR plant2,3 are available in the technical litera
Jan 1, 1981
-
Easy Areas for Improvement and Good Ideas I've Seen When Reviewing Plant Operations-From a Prominent Consultant in Industrial MineralsBy A. Frank Alsobrook
DOUG HALBE: Thanks, Terry. And in spite of your introductory comments, I'm going to attempt to continue our hallowed tradition of saying nice things about the speakers. This is really a serious c
Jan 1, 1998
-
SAMARCO's 396 Km Pipeline A Major Step In Iron Ore TransportationBy Milton E. Jennings
On May 11, 1977, the SAMARCO 20-inch, 396-kilometer (246-mile) Pipeline was placed in service. This system represents the latest thinking in slurry pipeline design and is one of the main contributors
Jan 1, 1978
-
Applying Automation and Machine Learning for Tunnel Inspections - RETC2023By Tristan Joubert, Fabio Panella, LiLing Chen, Yung Loo, Michael Devriendt, Nasir Qureshi, Ahmad Ali
Tunnel inspections have traditionally been carried out manually by inspectors writing up observations and taking photos of defects. The results from the inspection and the defects observed are depende
Jun 13, 2023
-
An Operations Research Approach To The Equipment Replacement Problem ? IntroductionBy Hubert E. Sherer
The mining industry is presently one of the most heavily capitalized industries in the U.S. (U.S. - Statistical Abstracts, 1979). U.S. sales of new mining equipment (not including environmental, prepa
Jan 1, 1982
-
Use Of Conditional Simulation In Underground Coal Mine PlanningBy Harvey P. Knudsen
Case studies are presented in this paper to illustrate the usefulness and applicability of using conditional simulation in under- ground coal mine planning. Conditional simulation is a technique devel
Jan 1, 1980
-
La Simulacion Digital: Una Valiosa Ayuda Para El Diseño De Plantas De ProcesoBy A. L. Mular
Si define la simulación digital y las técnicas de simulación son revisadas. La metodologia tipica conlleva la selección de modelos, el ajuste o reajuste de los datos primarios, la selección de una est
Jan 1, 1982
-
Heap Leaching Practice At Alligator Ridge ? IntroductionBy T. J. De Mull
The Alligator Ridge Mine is located 70 miles northwest of Ely in White Pine County, Nevada. Development of the mine began in the late 1970's as a joint venture between Amselco Minerals, Inc. and
Jan 1, 1983
-
Outside ExplorationMy "outside exploration" began in November 1908, only 16 months after I had come to Bisbee as a raw engineer. The well publicized reputations of eminent engineers up to that time, including John Hayes
Jan 1, 1976
-
Experimental Study of Improving a Mine Ventilation Network Model Using Continuously Monitored Airflow (Mining, Metallurgy & Exploration)By L. Zhou, L. Yuan, R. A. Thomas, D. Bahrami
The abstract emphasizes the importance of a calibrated ventilation network model for mine ventilation planning, optimization, and fire simulation. It highlights the impact of continuous airflow monito
Mar 7, 2022
-
First Aid - Personal Injury AccidentsBy Warnie Flint
According to statistics compiled by the National Safety Council, US Bureau of Mines, American Medical Association, and other agencies, accidental injuries cause more deaths than all the leading diseas
Jan 1, 1981
-
Engineering Online: Program Development to Address the Educational Needs of the Mining IndustryBy D. Yokom, T. Katsabanis, E. Tremblay
"The mining industry has always faced the problems of replacing retired mining professionals, retaining their knowledge, continuously developing the skills of local talent and employing under-represen
Jan 1, 2017
-
The Hansen Uranium Orebody, Tallahassee Creek District, Fremont County, ColoradoBy C. E. Chapin
The Hansen orebody is a large (1 2 million kg U3O8, 0.08% U3O8 average grade) sandstone-type uranium deposit in the Eocene Echo Park Formation of central Colorado. The deposit occurs in carbonaceous b
Jan 1, 2013
-
SizingBy William E. Foreman
Editor's Note: For purposes of uniformity throughout this book, Coal Preparation, 5th Edition, the editors have advocated the use of the U.S.A. Sieve Series of testing sieves (see Table 6-2) as t
Jan 1, 1991
-
Today's Technology for Conveyor Drive ControlsBy J. A. Ehler
Speed and torque control of standard A.C. induction motors can be accomplished using a variety of devices ranging from mechanical, hydraulic, and electrical. Also, the motor can be specified as an A.C
Jan 1, 1998
-
Using Diagnostic Process Analysis To Improve Cash Flow At Newmont's Carlin Mill #4Mill #4 processes mildly refractory ore from Carlin Trend deposits. Diagnostic analysis of plant operating data was used to generate a mathematical model containing the key parameters influencing the
Jan 1, 1999
-
3.7 Mine Valuation - 1. Technical OverviewBy Donald W. Gentry
Mine valuation is a multifaceted, interdisciplinary process by which the economic viability of an old, existing, or new mining property or venture is determined. The problems associated with arriving
Jan 1, 1979
-
Exploration For Hydrothermal Mineralization With Airborne Geochemistry - IntroductionBy Richmond Bennett
Airborne geochemistry became a reality with the advent of a high-sensitivity airborne gamma ray spectrometer with large volume NaI (TI) crystal detectors. Small variations in the concentration of pota
Jan 1, 1970
-
Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and EquipmentBy J. Herhold, S. Plaum
The focus within the economical optimization of projects, which are conducted underground, shifts more and more towards the conduction of construction work underground. Underground operations can be d
Jan 1, 2019
-
Approximating a project's rates of returnBy M. M. Hajdasinki
A project's rates of return (RORs)1, be it the internal rates return (IRRs) or one of the many IRR surrogates, frequently needs to be approximated. The success and efficiency an ROR- approximatio
Jan 1, 1999