Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Thickener 101 – Applying Theory To Reality Part 2 – Settling Basics And Test Work - SME Annual Meeting 2022By T. Wisdom, D. Romo, G. Seale, R. Jansen
Thickening remains relatively misunderstood since it is typically near the end of the process and not directly involved in metal recovery. When operating well, thickeners are ignored and left to run i
Mar 2, 2022
-
Mini Symposium - Crushing And Grinding Large Diameter Mill Drives - Gears For Large Diameter Mills DrivesBy Russell G. Shomperlen
Grinding mills in excess of 5 meter diameter and 3500 kilowatts per mesh are putting new demands on big gears. This paper returns to the basics of ring gear design beginning with the fundamental power
Jan 1, 1981
-
Economic Impact Of Reclamation And Environmental Laws On Surface Coal Mining OperationsBy Wayne Hilgedick
Peabody Coal Company is the nation's largest producer of coal and is headquartered in St. Louis, Missouri. In 1978 Peabody divisionalized its operations to establish more responsive and effective
Jan 1, 1983
-
What a Ride; From the Mining Industry to UniversityBy S. D. Rosenthal
"This article will share my ‘shift in career direction’ journey from corporate mine engineer, with 31 years of mining various commodities with a wide range of responsibilities in a variety of countrie
Jan 1, 2015
-
Geological Domaining with Unsupervised Clustering and Ensemble Support Vector Classification - Mining, Metallurgy & Exploration (2023)By Kasimcan Koruk, Julian M. Ortiz
Building a geological model is important in resource estimation, as it defines the extent of domains for estimation. Geological models are built by assigning a domain to the samples, based on logging
Oct 11, 2023
-
Newmont Gold Outlines its Mine Planning ProceduresBy Stephen P. Winkelmann
The expansion of gold production in Nevada's Carlin Trend over the last few years has been staggering. To increase gold production while minimizing capital requirements and providing for the safe
Jan 1, 1990
-
Beneficiation Of Auriferous Gravity TailingsBy C. Ek
Tailings originating from the gravity concentration of a gold ore containing about 14 g/t Au have been treated by various beneficiation methods. These tailings have been screened on the 147 and 74 mic
Jan 1, 1991
-
Longwall Roof Activity Monitoring and ControlBy W. M. Hart
The remote face loading and entry convergence monitoring systems, employed at some of the Cyprus Amax's underground coal mines, have been able to continuously record changes in face shield resist
Jan 1, 1996
-
Application Of Reinforced-Plastic Equipment In Extraction Processes ? IntroductionBy Richard J. Lewandowski
Corrosion and product contamination have been difficult problems for extractive metallurgy industries in the U.S. because of the highly active chemicals used. During the past twelve years, other indus
Jan 1, 1970
-
Sampling Of Trace Elements: In The Environment, Ores And Products, And High Purity Materials ? IntroductionBy Francis F. Pitard
The presence of elements, minerals, or chemical compounds in materials at very low concentrations is becoming a constantly increasing concern for several segments of the Industry. Some trace elements
Jan 1, 1986
-
Denmark's Great Belt Fixed Link Bored Tunnel ProjectBy Martin N. Kelley
The Great Belt Link is a $3.5 billion fixed link across an 18 km (12 mile) wide body of water that separates the island of Zealand, on which Copenhagen is situated, and the main land mass of Denmark,
Jan 1, 1991
-
Utility of Seismic Source Mechanisms in Mining - RASIM 2022By Dmitriy A. Malovichko
The general theory for the description of seismic sources is briefly discussed. The effect of excavations on seismic radiation is considered. Expressions for seismic source mechanisms in terms of the
Apr 26, 2022
-
Implementation Of Linear Programming Model For Optimum Open Pit Production Scheduling ProblemBy Edgar Urbaez
Production scheduling is one of the most important factors affecting mine planning. A program -Mine Scheduler -that aids mining engineers with the setup of an optimum open pit production scheduling al
Jan 1, 1999
-
Continuous Improvements In Mine Ventilation And Fire SimulationBy Rudolf E. Greuer
Modeling a mine ventilation system is a formidable mathematical problem requiring the solution of twice as many equations as there are airways with half of these being quadratic equations. The additio
Jan 1, 1994
-
Mineral Data Processing and Databases in the Bureau of MinesBy V. Anthony Cammarota
MINERALS INFORMATION PROGRAM Mineral data collection by the Federal Government actually began in 1882 with an appropriation by Congress to the U.S. Geological Survey (USGS). Although the Bureau of
Jan 1, 1987
-
Attenuation of mechanical vibration during transmission to human body through mining vehicle seatsBy AMIT SHARMA, BIBHUTI BHUSAN MANDAL
This paper describes the vibration transmissibility characteristics of mining vehicle seats under dynamic conditions in an opencast iron ore mine. Magnitude and frequency contents of vibration signals
-
FragmentationBy Warren W. Frech
11.1-FRAGMENTATION PRINCIPLES WARREN W. KRECH Energy must be supplied to rock by direct or indirect means to fragment that rock. The amount is dependent upon the properties of the rock and the
Jan 1, 1973
-
Innovative Grinding Circuits Through Staged Classification And Concentration ? IntroductionBy L. H. E. Weyher
Minerals beneficiation commonly requires initial crushing and grinding so that the mineral phase we seek to concentrate is adequately liberated to obtain a product of specified grade at optimum recove
Jan 1, 1985
-
Geologic And Economic Evaluation Of Raw Materials For The Cement And Lime ManufacturersBy William Ives
My presentation is from the viewpoint of the industrial mineral geologist, which is a relatively rare breed. Very few geologists become involved with industrial minerals for two reasons, I think: (1)
Jan 1, 1977
-
Santa Fe Pacific Gold's First Pressure Oxidation Circuit; Year One At Lone TreeBy J. A. Cole
The mill project at Lone Tree was commissioned in October, 1993, followed by the commissioning of the autoclave pressure oxidation circuit in February, 1994. Discussion of the first year of milling op
Jan 1, 1995