Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Stratabound Tungsten Deposits In Metamorphic Terrains: Stratabound Scheelite Deposits Of Northeast BrazilBy J. C. Reid
Pre-cambrian scheelite deposits in Northeastern Brazil are widespread in a high grade metamorphic terrain. Previously these deposits had been interpreted as contact-metasomatic. In this paper, a volca
Jan 1, 1983
-
Groundwater Control For Two-Pass Soft Ground TunnelingBy Cary Hirner, David Stacey, William A. Rochford
Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T
Jan 1, 2007
-
Experimental Shaft Machine for Nuclear Waste DisposalBy Dennis Ofiara, Michael Lewis
An experimental 1.75 meter Shaft Boring Machine was designed and manufactured by The Robbins Company. The drill was used by contractor Drillcon Raise AB to drill test shafts at an SKB underground test
Jan 1, 2005
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut TunnelsBy W. G. Brunner
The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a
Jan 1, 2007
-
New York City’s Harbor Siphons Water TunnelBy Colin Lawrence, Michael S. Schultz
Due to the planned deepening of the NY Harbor, NYCEDC/NYCDEP is planning to replace two existing water lines between Brooklyn and Staten Island with one deeper water pipe. The crossing, just north of
Jan 1, 2007
-
RETC 2015 Full Proceedings - RETC2015By Shemek Oginski, MARK C. JOHNSON
All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho
Dec 1, 2015
-
Monitoring Used as an Alarm System in TunnelingBy M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli
This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th
Jan 1, 2007
-
Teamwork, Technology Key in Rescuing Coal MinersBy Steve Kral
The dramatic rescue of nine Pennsylvania coal miners trapped nearly 90 m (300 ft) underground for77 hours probably would not have happened without the high technology equipment and improved mine rescu
Jan 1, 2002
-
The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and ResultsBy Enrique Fernandez
M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to
Jan 1, 2007
-
Laboratory Assessment Of Rock Fragmentation Process By Continuous Miners – Preprint 97-172By V. B. Achanti, A. W. Khair
Laboratory studies were carried out at West Virginia University to investigate the rock fragmentation mechanism by continuous miners using an automated rotary cutting simulator. The primary factors in
Feb 24, 1997
-
EPB Tunnel Boring Machine Design For Boulder ConditionsBy Craig Bournes, David Chapman, Michael DiPonio
Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje
Jan 1, 2007
-
Sound Transit Link Light Rail Northern ExtensionBy Paul M. Godlewski, Joseph P. Gildner, David S. McAllister
With construction underway on the 22.5 km (14 mile) Initial Segment of the Link Light Rail transit system in Seattle (including the one-mile EPB-driven running tunnels and mined station at Beacon Hill
Jan 1, 2005
-
Case Study in Monitoring Mining Induced Subsidence Using Photogrammetry and Conventional SurveysBy Rodger C. Fry
Underground coal mining has been active within the East Mountain property since the mid 1950's. As a result, coal from two seams has been extracted within large areas allowing surface subsidence
Jan 1, 1986
-
Water Tunnel in Liaoning Province, Northeast ChinaBy Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring
The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra
Jan 1, 2007
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud TunnelBy Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Evaluation of Pollution of Mining Areas in Aspect of their Future Use and DevelopmentBy D. J. Pyra, J. Kudelko, Korzekwam W.
Polkowice region (Lower Silesia, Poland) is an area, where the copper mining activity started about 40 years ago and new technologies were applied. There are 3 underground mines, 3 processing plants,
Jan 1, 2005
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access ProjectBy Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis
East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta
Jan 1, 2007