Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WABy Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
CFA Pile Design Parameters in SandBy Stuart Coutts
"This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc
Jan 1, 1900
-
Smart Soil Improvement: The Use of Rigid Inclusions for Soil ConsolidationBy Federico Pagliacci, Claudio Asioli, Marco Chiarabelli
"""Rigid inclusions"" are a consolidation method that provides improvement of soft soils thanks to the installation of cylindrical columns made up of a material with significant and permanent cohesive
Jan 1, 2017
-
The Road to Innovation in Geotechnical Construction (f2290583-6329-4b39-a4c9-b746aba3a1f4)By Peter J. Nicholson
"IntroductionDuring my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concre
Jan 1, 2017
-
The Road To Innovation In Geotechnical ConstructionBy Peter J. Nicholson
During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
A System with Local Strain for Studying Shear Modulus Degradation of Cement Treated Clay with FibersBy Min Sunn Ye, Wei Wang, Huawen Xiao, Kai Yao, Fook Hou Lee, Siang Huat Goh
"Previous research have shown that introducing fibers to cement soil mixture is effective in improving the ductility as well as maintaining the strength of cement-treated soil. A good knowledge of sti
Jan 1, 1900
-
Undergraduate Learning CommonsBy William M. Tanner, Daniel C. Brahana
"A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,
Jan 1, 2015
-
Integrity Testing of Drilled Displacement Piles at a Major CampusBy Mark D. Fuhriman, Parham Khoshkbari, Robert Fosse
Drilled displacement piles are becoming an increasingly common deep foundation choice for their relatively simple installation methods, applicability to a wide range of subsurface conditions, and vers
Sep 8, 2021
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo DamBy Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Pre-engineered Hydraulic Bracing SystemsBy Braxton P. Erbe, Douglas C. Brunot
A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy
-
Laterally Loaded Caissons for Ontario College of Art & DesignBy William F. Starke
"The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o
Jan 1, 2004
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
You Can't Drive Piles Because Of The VibrationBy Jerry A. Steding
How many times have you heard "You can't drive piles because of the vibration."? You hear these words come out of the mouths of owners, engineers, and contractors. When a piling contractor he
Jan 1, 1988
-
Efficient Torque-Installed Pile Use in Southern CaliforniaBy Jason Buenker, Molly Winston
Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp
Jan 1, 2019
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, TorontoBy Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th
Jan 1, 2019
-
Deep Mixing in the United States: Milestones in EvolutionBy Donald A. Bruce
"The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong
Jan 1, 2015
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005