Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Basement Excavation: Cost Effective Retention System for a Multi Storeyed StructureBy Madan Kumar Annam, Hari Krishna Y
"Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted
Jan 1, 2015
 - 
                    
                High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place PilesBy Garland E. Likins
High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec
Jan 1, 1995
 - 
                    
                Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press FoundationBy David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
 - 
                    
                Installation Parameters, Pile Performance and Importance of TestingBy Maurice Bottiau
"Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co
Jan 1, 2014
 - 
                    
                Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
 - 
                    
                Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
 - 
                    
                Dynamic Testing Results Indicator Pile Test Program --I-880 - IntroductionBy D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995
 - 
                    
                Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. IntroductionBy John Lemke
Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin
Jan 1, 2002
 - 
                    
                Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead SignsBy Roy H. Borde
The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio
Jan 1, 1988
 - 
                    
                Treatment of Soft Clays by Combined Encased Stone Columns and Vacuum ConsolidationBy Ganesh Kumar S.
"Soil reinforcement using stone columns is one of the well-developed ground improvement techniques for soft clay deposits. The load carrying capacity can be further improved by encasing it with geosyn
Jan 1, 2017
 - 
                    
                Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring SystemBy Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
 - 
                    
                Installation Of Augerpiles In Low Headroom And Restricted Access ConditionsBy Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
 - 
                    
                Bearing Capacity Of Pile By Curve-Fitting Method ? SynopsisBy Z. Q. Zhou
It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and
Jan 1, 2010
 - 
                    
                Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
 - 
                    
                Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? BackgroundBy Colin C. West
On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p
Jan 1, 1987
 - 
                    
                Determination Of Pile Lengths Under Existing StructuresBy Mohamad Hussein
Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b
Jan 1, 1992
 - 
                    
                A Unique Solution To Mitigate Movement At The Jefferson Memorial SeawallBy Jesús E. Gómez
In the Summer of 2011, emergency repairs to the Jefferson Memorial North Plaza and Seawall were completed. These repairs were necessitated by settlement and lateral movement of the seawall and North
Jan 1, 2011
 - 
                    
                Development and Experiences on Versatile Applications of RD-pile WallBy Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
 - 
                    
                Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON ProjectBy Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
 - 
                    
                Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - SummaryBy Madan B. Karkee
The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid
Jan 1, 1997