Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls OperationBy Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam
"NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of
Jan 1, 2006
-
Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004
-
Pilot-Scale Frother Testing at Highland Valley CopperBy S. D. D. Welsby
"A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over
Jan 1, 2014
-
Numerical Modeling Simulations of Spray-On Liners Support Potential in Highly Stressed and Rockburst Prone Rock ConditionsBy A. P. E. Dirige
Extensive field study has been performed to assess the capabilities of thin sprayon liners (TSLs) and conventional spray-on support systems for preventing rock and support material damage that often r
May 1, 2009
-
SMART ?ONE VOICE? Technology Standards in the Surface Mining Industry An Update -OEM & OTM SummitBackground Chronology 2008 Positions May 8, 2010 Summit Going Forward Say one thing and do another ??Genuine passion to see our customers succeed?, ?A passion for exceeding our customer?s exp
May 1, 2010
-
Effects of the Type of Water on the Selective Flotation of Pyrochlore from NiobecBy E. Esponosa-Gomez, J. A. Finch, A. R. Laplante
"Water quality plays an important role in oxide flotation. The effects on selective flotation of fine (1-16 um) pyrochlore of two types of water used at the Niobec concentrator, potable and plant recy
Jan 1, 1986
-
Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste BackfillBy Kim Le Roux
Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:
May 1, 2002
-
Cone Crusher Operaitonal VariablesBy A. J. Magerowski
Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment
Jan 1, 1986
-
Geology and Mine Development of the Red Dog Zinc Lead Deposit, Brooks Range, AlaskaBy Brigitte J. Dejou
The Red Dog sediment-hosted zinc-lead deposit is located in the Brooks Range thrust belt in northwest Alaska, approximately 1000 km northwest of Anchorage. The mine constitutes the primary deposit in
May 1, 2006
-
Study of Sphalerite Depression during Selective Flotation of Refractory Copper Zinc OresBy D. M. Wyslouzil
"This paper was prepared for presentation at the 16th Canadian Mineral Processor's Annual Meeting, Ottawa, Ontario, Jan. 17 to Jan. 19, 1984.This paper gives an account of the development of treatment
Jan 1, 1984
-
Establishing the process mineralogy of gold oresBy B. Jago
From the perspective of metallurgical processing, gold ores can be classified into freemilling and refractory ores. Their extractive metallurgy is largely driven by mineralogical factors such as gold
Jan 1, 2006
-
Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury CanadaReliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail
May 1, 2009
-
Implementation of Paste Backfill at the Williams MineBy Eric Konigsmann, Doug Spence, Scott Jones
"The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope
Jan 1, 2004
-
Reduction of Free Gold Losses in the Cleaner Circuit with the Installation of a Gravity Circuit at the Kemess MineBy Martin Froehling, Curtis Mohns, Rahim Rajwani, Michael Fullam
"The Kemess mining and milling complex is operated by Northgate Minerals Corporation and is located in the mountains of north-central British Columbia, 430 kilometers northwest of Prince George. The c
Jan 1, 2007
-
Development of a Mathematical Programming Model to Support the Planning of Short-Term MiningBy Camilo I. Morales
At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same
Oct 1, 2009
-
Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle sizeBy S. Kahraman, K. Develi, E. Yasar
Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At
Jan 1, 2004
-
Innovative Partnerships that Improve IT Support for Mine Planning and Management ProcessesBy Rick Moignard
Relationships between Information Technology providers and their clients are often segmented according to job specific tasks. As a consequence, technology providers tend to focus on automating repetit
May 1, 2006
-
Process Improvements at Placer Dome Campbell MineBy K. Norris
"The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p
Jan 1, 1992
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008