Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Onça Puma Nickel ProjectBy Ruy L. Rodrigues
Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t
May 1, 2010
-
Process Improvements at Bell Creek MillBy F. Flynn, P. Downey, G. Ritson
"Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git
Jan 1, 1997
-
Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning CircuitBy Andy Cole
Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean
May 1, 2002
-
Technological Advances in Telecommunications for MinesBy Patrick M. Y. Waye
As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad
May 1, 2001
-
National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should KnowBy Tony Lipiec, Greg Gosson
"When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun
Jan 1, 2010
-
Carbon Dioxide Use for pH Control at Greens Creek MillBy Tim Martin, Dave Tahija
"In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p
Jan 1, 2016
-
In situ acid leaching of copper tailings deposits: A case historyBy C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo
The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells
Jan 1, 2001
-
CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra LeoneBy Peter Dunn
London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for
May 1, 2011
-
Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine FacesBy Dolea Gabriel Gheorghe
In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo
Oct 1, 2009
-
Enhanced Oxygen Transfer in Gold CyanidationBy Ralph Harris, Xia Qi, Frank Komsic
"Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r
Jan 1, 1996
-
The Marketing of NickelBy K. H. J. Clarke
"ALTHOUGH nickel was not identified as a separate element until a Swedish scientist, Axel Frederick Cronstedt, did so in 17 51, its utilization dates from pre-historic times. From its humble beginning
Jan 1, 1960
-
Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for PredictionBy N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante
"The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of
Jan 1, 2004
-
High Pressure Direct Injection of Natural Gas in a Diesel Engine for High Performance/Low EmissionsBy K. Bruce Hodgins
The North American mining industry faces challenging emissions regulations in coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, industry
May 1, 2002
-
Vibro Energy Milling and its Application to Gold Recovery"This paper describes some of the methods and equipment used for fine milling of minerals, and gives particular attention to the Vibro Energy system.In addition, the paper describes a specific applica
Jan 1, 1988
-
Molybdenite Flotation by Controlling Pulp PotentialBy M. Kolahdoozan, H. Noori
"Molybdenite flotation at the Sarcheshmeh Copper Complex has been studied as a function of pulp potential controlled using two types of sodium sulfide (mineral and chemical origin). Air and either pla
Jan 1, 2006
-
Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element ApproachBy S. Stefanizzi
In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used
May 1, 2009
-
New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)By R. S. Simkus, J. R. Egan
"Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct
Jan 1, 1994
-
Flotation Column Scale-Up and SimulationBy G. S. Dobby, J. A. Finch
"I. INTRODUCTIONA significant development in flotation over the past few years has been the increasing industrial use of flotation columns, primarily in Canada. The column differs dramatically from co
Jan 1, 1985
-
Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls OperationBy Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam
"NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of
Jan 1, 2006
-
Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004