Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effective Modeling and Estimation of Stratified Deposits

    By Garth D. Kirkham

    The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa

    May 1, 2013

  • CIM
    The Swedish Methods of Electrical Prospecting

    By Hans Lundberg

    During the last few years, geophysical methods have been introduced to aid mining geologists and mining engineers in locating mineral deposits. These methods have been developed as the result of inves

    Jan 1, 1926

  • CIM
    Control of sodium-rich brine inflows at Central Canada Potash - Part 2: Rock mechanics, instrumentation and results

    By E. M. De Souza, A. M. Coode

    "Since potash was discovered substantial rock mechanics research has been done to develop the technology needed to cope with the unique conditions in Saskatchewan mines, to assure general mine safety

    Jan 1, 1990

  • CIM
    Saskatchewan Power Corporation's coal mining operations

    By W. J. Jenner

    "Introduction The Saskatchewan Power Corporation is a provincial crown corporation which operates under a mandate to supply all customers within Saskatchewan with electricity and natural gas. The Sask

    Jan 1, 1985

  • CIM
    Process Alarms: A Real Time Decision Tool

    By Marc Tardif

    "The way alarm information is provided to an operator can make a huge difference in the minutes following an upset. Process alarms are often looked at as a way to help avoid catastrophic failure and s

    Jan 1, 2016

  • CIM
    Francoeur Mine

    By J. E. Hawley

    "The property of Francoeur Gold Mines, Limited, lies directly west of the Armfield mine in Beauchastel township, Abitibi district, and 12 miles west and slightly south of Noranda. The gold deposits ar

    Jan 1, 1954

  • CIM
    Integration of BIM and Automation in High-Rise Building Construction

    By R. Heikkilä

    In this paper the utilisation of building information models (BIM) and construction automation on building sites is discussed. A lot of research has been carried out to develop new applications for us

    Aug 1, 2013

  • CIM
    Statistical Multivariate Analysis and Dynamics Monitoring for Process Control in the Mining Industry

    By L. Yacher

    Most metallurgical plants already have sophisticated control systems as well as a process-historian that manage thousands of real-time and historical variables. There exists a huge potential for opera

    Jan 1, 2007

  • CIM
    1977 Federal Budget ? Loans to Employees

    By R. D. Brown

    In the spring of 1977, Revenue Canada announced its intention to proceed in 1978 with a plan to impute a taxable benefit on interest-free and low-interest loans provided to employees. Such loan arrang

    Jan 1, 1978

  • CIM
    The Evolution of Maintenance Management into the 21st Century ? The Need to Implement Best practices

    By Ron Doucet

    Industry today is now more than ever dependent on its assets and on the standard of maintenance. Changes in technology, environmental regulations, a continually improving focus on safety and global co

    May 1, 2003

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2016

  • CIM
    Experience in the Low Pressure Casting in Printed Molds of a Thin Bladed Aluminum A356 Impeller

    By G. Morin, F. Chiesa, B. Tougas, B. Duchesne, Jocelyn Baril, N. Giguère

    "An aluminum A356 compressor impeller was sand cast using the Low Pressure technique. The casting was limited in size (170 mm in diameter, 1.2 kg in weight) and very intricate in shape thus making 3D

    Jan 1, 2018

  • CIM
    Using Multivariable Analisys for Cathode Quality Improvement in C. M. Doña Ines De Collahuasi Ew Plant

    By F. Romero

    In the last four years, Compañia Minera Doña Ines de Collahuasi has been working in the application of advanced multivariate statistical techniques for the improvement of the metallurgical processes.

    Jan 1, 2007

  • CIM
    History lessons

    By Robert B. Parsons

    "In this period of improved metal prices and reported profits, valuable lessons should be recalled from the 1970s when a similar cycle lured the federal and provincial governments into thinking that t

    Jan 1, 1989

  • CIM
    Conversion of Dry Grinding Rod Mills To Dry Grinding Ball Mills At Caland Ore Company Limited

    By B. A. McKee, T. Adamcewicz

    For a capital expenditure of only $46,000, Caland Ore Company has successfully converted its three dry grinding center peripheral discharge rod mills to dry grinding ball mills. The conversion has res

    Jan 1, 1972

  • CIM
    Microstructure And Mechanical Characterisation of FSW 7075-T6 Lap Joints

    By P. Bacher, L. Dubourg, M. Jahazi, G. Dezaise

    Effect of friction stir welding parameters and natural ageing on weld properties are reported. Using a Taguchi design of experiment, attempt is made to systematically examine the influences of the wel

    Jan 1, 2006

  • CIM
    De-Sliming of Penalty U-Bearing Particles in the Recleaner Feed of a Copper Concentrator

    By William Skinner, Jim Pae Lem, Massimiano Zanin

    It is well known that the specific density of minerals has adverse influence on the classification performance of a hydrocyclone, particularly when liberated high density minerals such as gold or uran

    Jan 1, 2016

  • CIM
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"

    By Karl Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Oct 1, 2024

  • CIM
    3-Dimensional Numerical Modelling of Stope Sequencing for Mine Planning

    There are many inherent risks in creating a mine plan for a new ore zone in an underground mine; one of such risks is the redistribution of stresses that could be a cause of instability. Using numeric

    May 1, 2009

  • CIM
    Constitutive Model for Mechanical Properties of Highly Porous Organic-Rich Chalks from Central Israel

    By S. Feinstein, I. Reznik, Y. H. Hatzor, O. Shitrit, Y. O. Rosenberg, H. J. Vinegar, S. Nguyen

    "We report the effects of porosity and total organic carbon (TOC) content on the mechanical behavior of organic-rich chalks, based on laboratory measurements. The organic-rich chalks are from the Seno

    Jan 1, 2015