Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Review and Update of the Grinding Circuit Performance at the Los Pelambres Concentrator, Chile

    By Gonzalo Bernstein, David G. Meadows, German Naranjo, Edgardo Tapia

    "During the last decade Antofagasta Minerals’ Los Pelambres Mine has dramatically increased its ore throughput following the fast initial phase ramp up through a series of planned incremental expansio

    Jan 1, 2012

  • CIM
    Spherical charge cratering-plane and angle geometry involving small-scale single and row tests

    By D. E. Salman, R. R. Maclachlan, R. J. Barclay

    "There is a considerable resource of data for spherical charge cratering, both as single charges and in row-of-charge geometr(1). The data are. however, based on cratering performance to a single free

    Jan 1, 1981

  • CIM
    A dynamic support system for yielding ground

    By P. Mottahed, E. De Souza

    One of the major unsolved problems of safe, economical roof support in the evaporite industry has been that of obtaining and maintaining anchorages in relatively soft rock. This is due to the viscoela

    Jan 1, 1999

  • CIM
    Improved Operational Performance Through Information Management ? A case Study from Rio Tinto?s Northparkes Mines

    By Jeff Smith

    Agenda About NORTHPARKES The NEED The INITIATIVE The SEARCH The PRODUCTS The SOLUTION The RESULTS The Northparkes copper-gold mine in Central Western NSW commenced operations in 1994. Copp

    May 1, 2006

  • CIM
    Trends in Mercury Management in Gold Processing

    By N. Ahern, M. Barbanell

    Mercury is often present in gold ores and can be released during processing. In view of health and environmental concerns related to mercury, the mining industry takes leadership in the responsible ma

    Jan 1, 2014

  • CIM
    Investigation on the Effective Strength of Broken Rock Through Shape Properties of Particles

    By S. Balideh

    A good understanding of the behavior of rock helps us to make more informed decisions regarding geo-structures. Engineers need accurate equations to calculate the strength and deformation of rock befo

    Aug 1, 2013

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • CIM
    Adaptation of Mining Methods for Low- and Micro-gravity Environments: Part 1

    By Leslie Gertsch

    Outline First progress report ? ?Introduction ?Non-terrestrial mining ?Near-term targets ?Stages of mining ?Study procedure Capabilities needed for non-terrestrial mining ?Mining methods ?M

    May 1, 2013

  • CIM
    3-D modelling of underground mine structures with backfill

    "A 3-dimensional finite element model for stress/stability analysis of rock excavations in underground mines is presented. Developed for use on personal computer under OS/2 operating system, the model

    Jan 1, 1992

  • CIM
    Coal slurry systems-a viable transport alternative

    By Lynn C. Fister

    "Coal is rapidly becoming a major alternative to oil. According to the World Coal Study Final Report, total world coal trade could approach one billion tons annually by the year 2000. To facilitate th

    Jan 1, 1982

  • CIM
    Coal Mining in Poland After World War II

    By T. W. Wlodek, Zygmunt Kowalczyk

    In the period from 1946 to 1964, the annual output of co al from Polish mines increased from 4 7.3 to 117.35 million tons. In this paper, the methods of bringing about this increase in productivity th

    Jan 1, 1967

  • CIM
    The Gunnar uranium deposit

    By E. F. Evoy

    "The Gunnar uranium deposit was within metasedimentary rocks of the late Archaen Tazin Group. These rocks were intensely altered by albitization so that the immediate host to the ore consisted dominan

    Jan 1, 1986

  • CIM
    Development of Ni-Co-Base Superalloys for Turbine Disk Applications

    By J. Fujioka, Y. F. Gu, C. Cui, D. Ping, A. Sato, H. Harada

    "A new kind of cast & wrought (C&W) Ni-Co base superalloys named as ""TMW alloys"" are developed recently for compressor or turbine disks of gas turbine engines in High Temperature Materials 21 Projec

    Jan 1, 2006

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • CIM
    Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )

    By Earle J. Klohn

    "The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr

    Jan 1, 1972

  • CIM
    Effective non-destructive testing (N.D.T.) of mine haulage equipment

    By W. F. Harkness, D. Hodgkinson

    "A non-destructive testing program was established at Crows Nest Resources (C.N.R.), Line Creek mining operation following an in-service fatigue failure of a front wheel spindle on a large haulage tru

    Jan 1, 1987

  • CIM
    Early Nova Scotia gold mining

    By John Hartlen

    "The 19th century was an ""age of gold"" and Nova Scotia experienced its share of early gold rushes. Gold mining activity in the province was focussed into three ""rushes"" which occurred, approximate

    Jan 1, 1999

  • CIM
    Brazing Characteristics of Warm Formed Automotive Heat Exchanger Components

    By K. B. Han, S. Winkler, M. J. Benoit, M. J. Worswick

    "Automotive heat exchangers are fabricated by forming multi-layered aluminum (Al) alloy brazing sheets into the desired geometry and subsequently passing the assembly through a furnace for brazing. As

    Jan 1, 2018

  • CIM
    Risk Assessment of Confined Space Using Fuzzy Set Theory at Mine Reclamation Sites

    By L. Mohammadi

    Outline ?Background on the accident at the Sullivan Mine No.1 Waste Dump ?Holistic approach to understand the reason for accidents (Atmospheric) ?Specific hazards at reclamation sites ?Regular atm

    May 1, 2010

  • CIM
    Preventive Maintenance Inspection in Coal Mines

    By P. E. Cavanagh

    FOR THE PAST seven years Mr. W. Simpson, Chief Mechanical Inspector for the Nova Scotia Department of Mines, has carried out exhaustive field trials of non-destructive inspection equipment in the coal

    Jan 1, 1956