Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Process for the Precipitation of Pure JarositeBy M. Lahtinen, B. Saxén, M. Latva-Kokko
The conventional jarosite precipitation process with neutralization by zinc calcine is widely utilized in the zinc industry. However, it has a significant drawback of causing losses of valuable metals
Jan 1, 2016
-
Modification of Feeding System for the Smelting Furnace and Other Recent Improvements at Gresik Copper SmelterBy Kenta Kusunose, Dadang Sundana, Ahmad Munib Fikry, Yosuke Unno
PT Smelting has operated the Mitsubishi Process in which feed materials are charged into the S- furnace through top lances using a pneumatic conveying system comprising 6 feeding tanks (S-Feeding Tank
Jan 1, 2019
-
Lysimeter investigations on uranium tailings at CANMETBy G. M. Ritcey, M. Silver
"The processing of uranium ores produces tailings that could constitute environmental problems. At most operations the tailings are dumped into a designated area, with the ultimate acid drainage occur
Jan 1, 1982
-
Block Stability Analysis of Left Bank Slope of Beihetan Hydropower Station in Jinshajiang River, ChinaBy G. Rong, W. Du
Stability of some potential unstable blocks in the left bank slope of Baihetan hydropower station is evaluated in this paper using the three-dimensional (3D) limit equilibrium method. The Baihetan hyd
Jan 1, 2015
-
Distribution Regularities of In-Situ Stress Field of Asymmetric Valley of Baihetan Hydropower StationBy Rong. G., T. Q. Lin, W. Du
Based on analysis of the evolutionary history of the valley in Baihetan, the mechanism of asymmetrical evolution, gradual migration-incision evolved from left bank to the right, is revealed in Baiheta
Jan 1, 2015
-
An Overview of the Paris Hills Phosphate Project, South-Eastern IdahoBy Kenneth L. Norris
Stonegate Agricom Ltd. is currently conducting exploration and development drilling of the Paris Hills Phosphate Project (Paris Hills Project) located in Bear Lake County, southeastern Idaho, 3.2 km w
May 1, 2011
-
Implementing the Continuous Improvement Operating Philosophy in Campbell Mine's Milling FacilityBy J. Wickens
"Campbell Mine is dedicated to quality management in the form of a Continuous Improvement (CI) Operating Philosophy. This paper discusses that philosophy, why and how it is being implemented in the mi
Jan 1, 1995
-
Limestone Drain Design Criteria in AMD Passive Treatment : Theory, Practice and Hydrogeochemistry Monitoring at Lorraine Mine Site, TemiscamingueBy Louis R. Bernier
Since 1978, most systematic studies of AMD passive treatment with limestone drains (LD) have dealt with coal mines in the United States. The authors present in this paper the first results of a trienn
May 1, 2001
-
Coal mining in the Drumheller districtBy T. Patching
"Introduction The occurrence of coal was first reported in the Drumheller area in 1793 but it was not until 1912 that production of coal was recorded. In that year 13,000 tonnes were mined in the Drum
Jan 1, 1985
-
Geological Implications of Regional Stream-Sediment Geochemical Data from South-Central British ColumbiaBy R. H. Wallis
Weighted moving-average contour maps have been constructed for molybdenum, copper and zinc using 7850 stream-sediment samples from 5430 square miles (14,063 sq. kms) of south-central British Columbia.
Jan 1, 1978
-
Mine Water Management Challenges, Technologies, SolutionsBy Graham Sim
Agenda ?The Water Challenge ?Examples from Three Case Studies ?Mine Drainage, 99% recovery ?Mine Drainage, 80% recovery ?Road Dust Control ?Technology Development ? Conclusion Global water ch
May 1, 2011
-
Bath Level Measurement for a Closed Dc FurnaceBy A. Scheltema Beduin, H. Oterdoom, A. Haaks, C. Kempe, A. Liedtke
The bath level measurement is applied in many furnaces to keep control of the level of slag and metal or matte inside. The BLM is used mainly in bath processes, and has not seen much evolution in its
Jan 1, 2015
-
Millennium Deposit: The Emergence of a New Saskatchewan Uranium MineThe Millennium deposit, located in northern Saskatchewan between the McArthur River mine and the Key Lake mill, has considerable potential for becoming an operating mine. Located in the Athabasca Basi
May 1, 2008
-
New flow-through share rules are hereBy Robert B. Parsons
"A t last the legal red tape which has tied up flow-through share financing has been cut. New rules effective for deals signed after 1986 simplify flow-through financing by removing the necessity f or
Jan 1, 1987
-
The Benson Lake Mine - Operating PracticeBy J. D. Wilkins
"Ore outcrops were first discovered in the area in 1911. Following various periods of exploration by private interests and Cominco Limited, the Coast Copper Company, Limited property was brought into
Jan 1, 1971
-
Chemical Control of Hydrogen Sulphide During Drill Stem TestsBy Joseph U. Messenger
A method of applying ammonium hydroxide to a drill stem containing hydrogen sulphide gas and hydro-gen-sulphide-bearing oil and water so as to remove the hydrogen sulphide as ammonium sulphide is de-s
Jan 1, 1958
-
Particle Damage and Exposure Analysis of Microwave Treated Ores for Bio-Heap LeachingBy S. M. Bradshaw, E. Charikinya
"Microwave induced cracks have the potential to enhance metal recovery from coarse sphalerite particles in heap leaching operations by creating new crack surface areas for lixiviant and enhancing valu
Jan 1, 2016
-
Dry Atomization of Nickel Laterite SlagBy L. C. So, S. Faucher, S. Mostaghel, A. Triwahyuono, D. Sauter, S. -Y. Oh, S. K. Lee, K. Aswin
"Molten hauling and water granulation are the commonly used slag treatment methods in the production of nickel. Water is present in these processes either to accelerate cooling of the dumped slag or i
Jan 1, 2017
-
The Half-Year in Mineral Production in CanadaBy S. J. Cook
Outstanding advances among the metals, marked the mineral production records for Canada during the first half of 1925. Production of metals and non-metals reached a total value of $90,347,698. as comp
Jan 1, 1925
-
Putting Out a Fire at the Greenhill MineBy J. A. Brusset
THE Greenhill mine of West Canadian Collieries, Limited, is situated at Blairmore, Alberta, and produces 2,500 tons per day of bituminous coal. On Monday, October 25th, 1943, smoke was discovered by a
Jan 1, 1945