Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Sulphur Dioxide Recovery at Trail

    By R. Lepsoe

    THE basic products of the Company are lead and zinc. Around 950 tons of these metals are produced each day. In the last decade, the production of by-products has increased to such an extent that they

    Jan 1, 1937

  • CIM
    Till Geochemistry in Areas of Thick Drift and its Application to Gold Exploration, Matheson Area, Northeastern Ontario

    By M. B. McClenaghan

    "Abstract- The Ontario Geological Survey completed a regional till sampling project between 1984 and 1988 in the Black River Matheson (BRiM) area of northeastern Ontario. The project was designed to a

    Jan 1, 1994

  • CIM
    Understanding hydrotransport: The key to Syncrude’s success

    By R. B. Paine, B. M. Wright

    "Syncrude has entered a new era involving the use of pipeline slurries to convey oil sand to the extraction plant. Hydrotransport operations and base plant operations encounter vast performance differ

    Jan 1, 1999

  • CIM
    Complex Copper Pyrometallurgy Challenges and Opportunities - Integrated Experimental Phase Equilibria and Thermodynamic Modelling Research and Implementation

    By T. Hidayat, D. Shishin, V. Prostakova, M. Shevchenko

    The chemical compositions of copper feed streams are becoming increasingly complex following the growing demand for metals and corresponding shortages of primary sources. The optimisation of process c

    Jan 1, 2019

  • CIM
    Helicopter Exploration Costs in Northern Canada

    By C E. Gordon Brown

    Aircraft utilization, weather and cost data are given for three separate projects north of the sixtieth parallel in the Northwest Territories and the Yukon Territory. These operations, carried out by

    Jan 1, 1964

  • CIM
    Atmospheric Fines Drying (AFD)

    By Nav Dhadli

    Tailings from Oil Sands MiningWhat are they? Challenges Solutions Regulatory Environment Definition of the AFD Tailings Treatment Process 2010 AFD Pilot/Demonstration ProgramTechnical challenges

    May 1, 2011

  • CIM
    The Valuation of Ore in a Prospect

    By D. C. McKechnie

    To the examining engineer, the ever-recurring problem involving the valuation of ore in a prospect presents at different times highly divergent aspects- some entirely physical or mathematical, others

    Jan 1, 1930

  • CIM
    The Pressure Iron Removal Section at Rustenburg Base Metals Refiners

    By C. A. Biley

    "A dedicated iron removal stage was installed at Anglo American Platinum’s Rustenburg Base Metals Refiners (RBMR) during an expansion project which began execution in 2010. The Pressure Iron Removal (

    Jan 1, 2016

  • CIM
    Mining and Geology at' Scully Mine

    By O. W. Borgeson, D. K. Honsberger, R. T. Bell

    The Scully Mine, situated in the Labrador Trough near the Quebec-Labrador boundary, is one of the world's largest continuous ore deposits. This paper outlines the sequence of the mining operations fro

    Jan 1, 1969

  • CIM
    Environmentally Benign Bio-Leaching Extraction of Rare Earth Elements from Non-Conventional Resources

    By S. Hussien, P. Somasundaran, P. Patra

    "Rare earth elements (REEs) are essential for many applications in electronics, energy harvesting, and defense. The common resources for economic extraction of REEs are oxides such as bastnaesite and

    Jan 1, 2016

  • CIM
    Increasing the Capacity of Existing and New Exothermic Autoclave Circuits

    By G. M. Dunn

    Pressure leach autoclave circuits are employed in the leaching of ores, concentrates, mattes, alloys and intermediates for the recovery of metals into solution. Once the metals are extracted into solu

    Jan 1, 2004

  • CIM
    Towards a Robotic Refurbishment Process of Industrial Buildings

    By K. Iturralde

    The topic of this article is the automation and robotization in refurbishment processes of industrial buildings. The need to mold these production spaces is quite universal. Particularly in the region

    Aug 1, 2013

  • CIM
    Precipitation of Selenium, Tellurium, and Platinum Group Metals from Copper Sulphate Leach Solutions

    By J. A. du Plessis, C. Dorfling

    Selenium, tellurium and other precious metals (OPMs, namely Rh, Ru and Ir) dissolve in the final leaching stage of base metal refineries. Se and Te are typically removed from the copper sulphate leach

    Jan 1, 2016

  • CIM
    Aluminum Alloy 7050 T7451 Thin Wall High-Speed Machining Parts Study

    By V. Songmene, A. Tahan, J. P. Michaud

    The machining of thin wall parts, often used in the aeronautical industry still creates a number of problems, including panel deformation. Quality and productivity are often affected. This study seeks

    Jan 1, 2006

  • CIM
    Laboratory Studies on the Flow of Nickel ... Water Suspensions*

    By H S. Ellis

    Flow studies have been conducted on nickel-water suspensions in a 1in.-diam., 42-ft.-long transparent lab-oratory pipeline at concentrations of up to 25 per cent, by volume, and slurry velocities of u

    Jan 1, 1963

  • CIM
    The St. Lawrence Deposit, Seeley?s Bay, SE Ontario, Canada: a major high-P wollastonite skarn in the Frontenac Terrane

    By Tassos Grammatikopoulos

    The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies of the Frontenac Terrane of the Grenvi

    May 1, 2002

  • CIM
    Evolution in Rare Earthmaterial Science, Production, and Resource Development: Themountain Pass Paradigm

    By J. T. Sims, C. E. Karayannopoulos

    Today's rare earth industry is undergoing significant and rapid evolutionary change toward greater reliability and diversity of supply, increased security of supply chains, and better price forec

    Jan 1, 2014

  • CIM
    Large Underground Excavation Support for Ore Exploitation

    By R. Lapcevic, P. Lokin

    "Among other components, ore body „T“ was discovered in the Bor pit copper mine at a depth of app. 500m. The ore body is relatively small: 60-65m long, 40-45m wide and up to 50m high, but with an extr

    Jan 1, 2015

  • CIM
    Principles of Using Microdiamonds for Resource Estimation: 1—The Impact of Mantle and Kimberlite Processes

    By J. J. Ferreira, M. L. Thurston, I. L. Chinn, D. M. Rose

    "Concerns about using microdiamonds for resource estimation have been raised by workers because multiple diamond populations exist in many parts of the mantle source region, small diamonds in kimberli

    Jan 1, 2016

  • CIM
    Copper EW Processes: State of the Art in Optimizing Current Density Distribution

    By E. P. Wiechrnann, C. M. Castro, G. A. Vidal

    In copper Eta plants the optimal current density setpoint depends on the electrolyte composition and temperature. However, conventional plants operate with large standard deviations. A value of 14% wi

    Jan 1, 2011