Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Balance Between Practive and Theory in Mineral Processing Education

    The constraints in university courses are lack of hours, high cost of scientific equipment, and poor availability of suitably experienced staff. These have forced the balance away from practical w

    Jan 1, 1984

  • AUSIMM
    Project Feasibility Studies - A Necessary Step or the Best Opportunity to Add Value and Certainty?

    By J Borthwick, M Yusi, M Douge

    Feasibility studies form a vital and significant component of the project delivery cycle. They are at the heart of the valuation process. This paper focuses on variables which can affect a project and

    Jan 1, 2009

  • AUSIMM
    Application of Thermo-Chemical Analysis to Control the Recovery of Silicon During the Production of Ferro-Chromium in Submerged-Arc Furnace

    By Mishra S. N, Mishra R, Sen P. K

    Control of silicon in produced through the submerged-arc furnace can result in reduced power and coke consumption in addition to improving the quality of the hot metal. A thermo-chemical analysis of

    Jan 1, 1999

  • AUSIMM
    Large Column Leaching at Telfer Gold Mine

    By Dunne R, Defilippi J

    Dump leaching began at Teller in late-1988 at a rate of 4 MTPA and has been progressively expanded to the present rate of 10 MTPA. Teller's on-going commitment to dump leaching is driven by the a

    Jan 1, 1992

  • AUSIMM
    Filtering Techniques Adopted to Ensure that Rosebery Concentrates Meet Transportable Moisture Limit Requirements

    The Transportable Moisture Limits, as ,measured by the procedures laid down in The IMCO Code of Safe Practices for Bulk Cargoes, determine the target moisture contents for the concentrates produced

    Jan 1, 1978

  • AUSIMM
    GPS Based Machine Guidance in the Mining Industry

    High precision GPS systems for mining are accurate to within a few centimetres. Typical systems consist of one or more GPS antenna, GPS boards, sensors to detect the position of the blade or bucket of

    Jan 1, 2003

  • AUSIMM
    An Introduction to the Mineral Resources ACT 1989

    The Mineral Resources Act 1989 was assented to on 25th October, 1989 after more than two years of consultation and negotiation between Government, the mining industry and other affected parties partic

    Jan 1, 1990

  • AUSIMM
    Prediction of Time Dependent Factors in Acid Mine Drainage

    By Murray G

    This paper outlines the processes involved in acid generation from sulphides and the key factors in identifying and predicting time dependent changes in the nature of acid mine drainage (AMD). The

    Jan 1, 1988

  • AUSIMM
    Test Method To Assess Engineering Geology Of Coal Mines From Bore-Hole Data

    The task of designing stable high walls and spoil piles in strip coal mines, and stable openings with controlled roofs and floors in underground collieries - within the constraints normally imposed

    Jan 1, 1977

  • AUSIMM
    Banded Iron Formation to High-Grade Iron Ore - The Fallacy of Supergene Enrichment

    Martite-goethite high-grade iron ore deposits that show no trace of hydrothermal alteration may extend to more than 200 m below the permanent water table and are typically saprolite with evidence of e

    Jan 1, 2008

  • AUSIMM
    Development of Face Machinery with Particular Reference to Shortwall Mining

    By Duncan B

    Shortwall continuous mining as first introduced at Burwood colliery, and currently being used at John Darling, Lambton, and Corrimal collieries, is a method of coal winning which was pioneered in

    Jan 1, 1972

  • AUSIMM
    The Importance of Geometallurgical Analysis in Plant Study, Design and Operational Phases

    If an orebody has been drilled to achieve some level of regulatory compliance, then a number of associated geological databases will exist, representing 10 000 to 100 000 m plus of core intervals. The

    Jan 1, 2007

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir George Fisher, C.M.G

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. C. H. MARTIN) IN PRESENTING THE CERTIF1CATE TO SIR GEORGE FISHER, C.M.G.Members of The Institute, distinguished guests, of which there are many, ladies a

    Jan 1, 1976

  • AUSIMM
    Minimising Coal Edge Losses in Dragline Blasting Operations

    By Yang RL, Bailey ML

    During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams

    Jan 1, 1988

  • AUSIMM
    Impact-Response-Monitoring-Evaluation Framework - Well-Being of the Australian Mining and Regional Communities

    In Australia a social impact assessment (SIA) is generally required prior to the approval of a mineral resource extraction or processing projects as a part of the Environmental Impact Assessment (EIA)

    Jun 1, 2010

  • AUSIMM
    The Nature of Underground Heating as Indicated by Numerical Modeling

    A numerical model of the spontaneous combustion of coal has been developed and is being used to investigate the nature of self-heating in underground coal mines. Results to date confirm the complexity

    Jan 1, 1998

  • AUSIMM
    Some New Collector Products for Improving the Performance of Industrial Flotation Circuits

    By Fee BS

    This paper describes four new families of collector products which are currently being introduced at the industrial level. A brief summary of the chemical basis behind each product family will be gi

    Jan 1, 1993

  • AUSIMM
    Selection of Mining Method for Anomaly No 3 of Gol-Gohar Iron Mine of Iran

    By M Heidari, M Ataei

    Today, the selection of a mining method is a multi-criteria decisionmaking process, with many factors in this process connected to each other. These trends do not have a high degree of confidence. In

    Jan 1, 2003

  • AUSIMM
    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Metallurgical Factors Affecting the Throughput and Efficiency of Mount Isa Heavy Medium Plant

    By Scott IA, Jefferson C, Dipasquale S

    This paper describes the use of modelling and simulation techniques in the analysis of the heavy medium plant at the Lead/Zinc Concentrator of Mount Isa Mines Limited. The objective of the study i

    Jan 1, 1987