Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Behaviour of a Flame Safety Lamp in a Methane Coal Dust Air AtmosphereBy Osborne V. J, Urbank W
An explosion occurred at Moura No. 4 underground coal mine in Queensland on 16 July 1986 and resulted in the loss of 12 lives. The official report of the accident concluded that the most likely so
Jan 1, 1988
-
A Computer Network for the Extended Analysis of Data from a Computer Controlled Electron Probe MicroanalyserBy Penney B. K, Baghdadi A. A
An electron probe micro-analyser, controlled by a dedicated mini-computer,has been operating at Imperial College since 1970. The data assessment capability of the computer was limited and, in order
Jan 1, 1977
-
The Systematic Assessment of Hydrocyclone Performance to Select an Optimum Configuration for a Given ApplicationBy J, J M. Young, P T. Nielsen, R Zhu
Improved understanding of the variables that influence hydrocyclone performance is of increasing interest to the iron ore industry, where hydorcyclones are widely used to deslime fine ore. In many cas
Jan 1, 2002
-
The Use of a Computer to Describe BlastingBy Hengst B
The first production stage in any mining operation is the breaking of whole rock into fragments small enough for loading and subseq- uent handling. This primary fragmentation is most frequently acc
Jan 1, 1977
-
Separating Explosive Charges with Air Gaps to Improve Fragmentation Whilst Reducing Explosive UsageResults of blasting trials conducted at Gregory Mine, a large open cut coal mine situated in the Bowen Basin, show that fragmentation was improved or equalled whilst reducing the amount of explosive
Jan 1, 1989
-
Recent Concepts for the Extended Use of Draglines in Deeper Stripping ApplicationsBy Aspinall T. O
Draglines have found wide application in strip mining coal seams down to 60m depth. A research Project funded through NERDDC has been underway during the past two years investigating the application
Jan 1, 1989
-
The Development of a New Approach to Slope Stability Assessment in U.K. Surface Coal MinesBy Brown DJ, Croghan JA, Denby B
The paper describes the development and analysis of an instability database to establish a new method of slope stability assessment for U.K. surface coal mines. The concept is based upon a Stabili
Jan 1, 1986
-
Study of the Impact of Mining Under Massive Roof at datong Coal Mines, ChinaBy Sheng X. L
The Jurassic coals at Datong are characterised by their strong, massive sandstone and conglomerate roofs which fail suddenly over large areas, crushing pillars and creating destructive windblasts.
Jan 1, 1992
-
Implications of High Productivity Long Wall SystemsThe areas of impact when employing high productivity long wall systems are reviewed and the financial implications of the most significant areas highlighted. A distinction has been made between av
Jan 1, 1988
-
The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation PlantBy Smith M, Milton T, Pitt G
High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyc
Jan 1, 1987
-
Mine Planning Succeeds on a Dedicated MinicomputerBy McDonald E, Clifford PJ
A mine planning system comprises all elements necessary to carry out the full range of mine planning activities from exploration to operations control. The application of computers as part of a mi
Jan 1, 1983
-
Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI inputBy S K. Panda, M A. Van Ende, S Chatterjee
Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu
Jun 19, 2024
-
The Multi-Element Functionality of the Whittle Optimiser - A Different Approach in the Evaluation of Iron Ore DepositsIn general the iron ore industry has been slow to adopt the Whittle Pit optimising software in the evaluation of iron ore deposits. The reasons for this are two-fold:the iron ore industry has develope
Jan 1, 2007
-
The Limitations of Capillary Theories to the Prediction of Pellet StrengthsBy Wilson GR
Pellets were produced from carefully sized iron ore and silica sand fractions, under controlled moisture conditions, using a sealed balling drum. The strength of these pellets was measured as a fu
Jan 1, 1972
-
Future Planning Against Mineral ShortagesAs you are all aware, the theme of this con- ference is "International Resources Management". The subject matter of this particular session is "the mineral equation". Looking down the sub- ject matt
Jan 1, 1978
-
A Method for Determination of Strength of Coal MassBy Qixiang Y
The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst,and its prediction method. Up to now, there has not been a method for dete
Jan 1, 1992
-
The Economic Life of a Rock Drill (e7c90118-9ca4-4519-bb2c-97419e088a80)With the use of 36 rock drills of the jackhammer type at the West Lyell Open Cuts of the Mt Lyell Mining & Railway Co, it is of importance to determine the economic as well as the physical life of
Jan 1, 1994
-
The Woodsreef Magnesium Project ù An Example of Sustainable Mineral Waste Processing from Mined Ore and its Utilisation to Produce Refined Metal ProductsBy N Green
The production of approximately 550 000 tonnes of æwhiteÆ or chrysotile asbestos fibre between 1972 and 1983 at the Woodsreef Mine in New South Wales left behind 24 million tonnes of tailings and 75 m
Jan 1, 2002
-
Tunnelling Under Steep, Dangerous SlopesBy Shibata Y, Shimizu R, Fukushima A
Kobe is divided by the Rokko Mountains, runn- ing from east to west. The southern section of Kobe is highly developed in contrast with the northern section, but big, new residential pro- jects like
Jan 1, 1987
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017