Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Practical Optimisation of the Flotation Circuit at West Cliff Washery

    By Kazis JV

    The beneficiation of fine coal has been the major problem facing the coal preparation engineer in recent years. The influence of clay slime, particle size and reagent type are but a few of the many

    Jan 1, 1984

  • AUSIMM
    An Integrated Economics Model for In Situ Resource Utilisation in Support of a Mars Colony

    By C Tapia Cortez, A G. Dempster, R Fradet, S Saydam, T de Roche, R Shishko, J Coulton

    Human ventures into space are entering a new phase in which missions formerly driven by government agencies are now being replaced by those led by commercial enterprises – in launch, satellite deploym

    Nov 4, 2015

  • AUSIMM
    Cannington Mine Development Project 1993 - 1998

    The Cannington silver lead zinc deposit is located near Mt Isa in North West Queensland. This world class orebody is owned by BHP World Minerals (BHP) and is estimated to contain 45 million tonnes of

    Jan 1, 1998

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • AUSIMM
    Grade Trends at the Elura Mine

    The Elura Orebody consists of a number of parallel, vertically oriented pipe-like structures of pyrite-sphalerite-galena mineralization located at the core of a structural dome. Concentric zoning of t

    Jan 1, 1990

  • AUSIMM
    Gold mineralisation on Woodlark Island, Papua New Guinea

    By Shatwell DO, Hayward SB, Leach TM

    Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila

    Jan 1, 1994

  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject (AuslMM '98 - The Mining Cycle)

    By D J Williams

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 inn depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings sl

    Jan 1, 1998

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    Planning Stable Post-Mining Landforms: The Application of Erosion Modelling

    By Riley S. J

    The basic aim of mine planning is to design mine layouts and schedules that achieve optimisation of operations, minimum cost and maximum resource recovery. Successful accomplishment of this aim is f

    Jan 1, 1994

  • AUSIMM
    Some Coal Washing Developments in Australia

    Coal washing practice can be improved not only by critical examination of the plant being operated but also by studying plants operated in other areas. The developments at the Australian Iron & Steel

    Jan 1, 1975

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    "Impact of Mineralogical Variation on the Smelting of Cu-Ni-PGM Concentrates"

    By J J. Eksteen

    "In the platinum group metals (PGM) industry, smelters are often perceived as ‘black boxes’ that have to process concentrates of variable mineralogy and originating from multiple mines operating along

    Jun 15, 2016

  • AUSIMM
    Design and Operation of Backfill Silos for Reliable High Solids Concentration Discharge

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri

    Jan 1, 1998

  • AUSIMM
    Selling Australia's Crude Oil Production

    In 1984/85 financial year Australia produced 529 thousand barrels per day (kbd) of crude oil. By far the major contribution (453 kbd) was light waxy oil from offshore Gippsland, Victoria. When the

    Jan 1, 1986

  • AUSIMM
    Primary vertical Crafter Retreat Mining at the Zinc Corporation, Limited

    By Hebbard GJ

    Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase

    Jan 1, 1985

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Activity Coefficient of Oxygen in Dilute Lead Ton Alloy Solvent

    By Kapoor M. L

    EMF measurements were performed in the temperature range of 933-1095 K to determine the thermodynamic properties of oxygen dissolution in liquid lead and lead-tin alloys with tin in the dilute conc

    Jan 1, 1992

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    Continuously Cast Zinc Alloy Bar Stock - Applications and Benefits

    The continuous casting of zinc alloys has been of fundamental importance for many years in the production of a number of products, including sheet for architectural applications, battery cans for dr

    Jan 1, 1993