Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining Operations

    Over the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec

    Jan 1, 1999

  • AUSIMM
    Above and beyond NPV – determining the life-of-mine from an economic perspective

    By C Tapia, B Hay

    There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin

    Aug 2, 2023

  • AUSIMM
    Challenges and opportunities in accelerating electrification of underground heavy haulage equipment

    By J Webb

    The mining industry is relatively niche and complex compared to other global industries in its safety and operating environment. Whilst some of the technology required to decarbonise the mining indust

    Mar 29, 2023

  • AUSIMM
    The Broken Hill Proprietary Company Limited. (Iron and Steel Works.) The Basic Open Hearth Process

    By Walker E. R

    IN the early age of steel it was made hy what is known as the cementation proeess, in which wrought iron was embedded in charcoal and heated in a mufflc furnace to a tcmperature of approximately 1100&

    Jan 1, 1930

  • AUSIMM
    Nova-Bollinger unfolding versus DA estimate

    By P M. Hetherington, M P. Murphy, K E. Crook, F Pym

    Resource characterisation is critical for informed decisions in both strategic and operational space. The sources of information for resource characterisation are limited by: direct measurement of res

    Mar 22, 2022

  • AUSIMM
    Functional safety and behavioural economics – understanding human error risk in autonomous operations

    By B Patterson, Y Lanwin

    Over the last decade the adoption of autonomous technology has proven its potential to fundamentally alter the mining industry, offering significant improvements in safety and productivity. Automation

    Apr 16, 2024

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    I Think, Therefore I Add Value – Philosophy of Science as a Practical Tool for the Mine Geologist

    By J Vann

    The philosophical context of many activities in mine geology can be an important lever in adding value to operations. For mine geologists (including resource and grade control geologists) we argue tha

    Aug 22, 2011

  • AUSIMM
    Introduction of Electric L.H.D.Æs at Rosebery Engineering Aspects

    Production implications of the introduct- ion of electric L.H.D. units in sublevel open stoping and pillar recovery at Rosebery are covered by Faulkner (1982) and Carlton (1982). The following engin

    Jan 1, 1982

  • AUSIMM
    Post-Permian Subsidence and Tectonics, Vulcan Sub-Basin, North West Shelf, Australia

    Tectonic subsidence plots have been calculated for well, extrapolated-well and significant off-well (seismically-based) locations in the Vulcan Sub-basin and adjacent highs (western Timor Sea). The su

    Jan 1, 1990

  • AUSIMM
    A geotechnical risk assessment tool for underground mine drives

    By H Esterhuizen, W Hartman

    Rockfalls or significant deterioration of mine openings can have significant safety and financial impacts for mining operations. The failure of drives in underground mines sometimes highlight deficien

    Nov 30, 2018

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin Smelters

    By Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J

    Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its

    Jan 1, 1984

  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    Land matters and business development associated with the Misima Mine

    Land is of extreme importance to citizens of Papua New Guinea and is fundamental to most of their customs and values. Because of this, matters to do with land cannot easily be separated from other mat

    Jan 1, 1994

  • AUSIMM
    Fusion of molten phase R&D into the metallurgical industry to drive circularity

    By S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows

    The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability

    Aug 21, 2024

  • AUSIMM
    MEMS – The Mine Event Management System: a process to assist with incident management

    By B Stewart

    It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi

    Apr 16, 2024

  • AUSIMM
    Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?

    By R Jacobs

    "The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile

    Mar 8, 2016

  • AUSIMM
    The Green Mine Campaign and Sustainable Mining in China

    By X Li, J Wang, D Liu, Y Liu, K Hu

    "Since the adoption of open-door policy 30 years ago, rapid economic growth has resulted in serious resource depletion and environmental destruction, especially in mining areas. As an urgent response

    Jul 10, 2012