Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Hydrolysis of Iron in Acid Solutions

    A process was developed based on the thermal hydrolysis and precipitation of iron from solutions resulting from the leaching of zinc plant residue. A study was made of the hydrolysis of iron, at tempe

    Jan 1, 1967

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
  • AUSIMM
    Shallow Compressed Air Tunnelling on the Murl Project

    By Bennet A. G

    As part of the construction of the Melbourne Underground Rail Loop it was necessary to construct two 7 metre diameter tunnels, each 100 metres in length, by shield driven excavation through an all

    Jan 1, 1981

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    Sulphide Corporation Limited Works, Cockle Creek, NSW

    IT will be noticed, from the following contributed papers on the various plant, what an infinite number of parts are required to be kept in active operation in order to derive a resultant product of c

    Jan 1, 1918

  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011

  • AUSIMM
    Simulation study on crucial parameters of long-compressive and shortsuction ventilation in large section roadway excavation of LongWangGou coalmine

    By H Wen

    LongWangGou coalmine auxiliary inclined shaft heading face has a large section, fast heading speed, and large dust production. The problems of high concentration and wide distribution of dust in the r

    Oct 12, 2022

  • AUSIMM
    Oil & Gas Valuations - A Simplistic View of Some Critical Issues

    The title of my address today is "Oil and Gas Valuations - A Simplistic View of Some Critical Issues". Alternatively I could have called this address "Pitfalls for investors' and corporates in

    Jan 1, 1989

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Aspects of the Design and Construction of the Chong Ming Tunnel Shanghai

    By R Frew, E Wong, G Ferguson

    The Chang Jiang Tunnel and Bridge Project, when completed, will provide a fixed link between ShanghaiÆs rapidly developing Pudong District and Chong Ming Island, situated in the Yangtze River delta. T

    Jan 1, 2008

  • AUSIMM
    An Assessment of Rockbolting in Geogically Disturbed Mine Roadways

    By Whittaker B. N, Reddish D. J

    The rockbolting method of support is employed widely in several countries in different of mines. Hard rock mines use this method extensively. Soft rock mines, such as coal mines, have employed stan

    Jan 1, 1992

  • AUSIMM
    Biomineralisation ù A Novel Approach for Immobilising Toxic Metals in the Environment

    By L C. Thompson

    Biomineralisation is the process by which microorganisms mediate and catalyse inorganic reactions so as to form new mineral assemblages. The goal of biomineralisation as a remediation tool is to contr

    Jan 1, 2004

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994

  • AUSIMM
    The Solution of Ventilation Problems by Mathematical Modelling

    By Wasserman A. D

    Methodological approaches and in- vestigation results are considered in the paper of heatmass transfer processes when harmful impurities are scattered and remo- ved from chamber-like workings, of th

    Jan 1, 1988

  • AUSIMM
    Study of prevention methods for stress corrosion cracking in underground coalmines

    By A Crosky, S Saydam, H Chen, H L. Ramandi

    Cable bolts and rock bolts are used as primary and secondary anchoring systems in many underground mines. Reports on the premature failure of cable bolts and rock bolts due to stress corrosion crackin

    Nov 29, 2022

  • AUSIMM
    Virtual mine geologist – who needs a real one when AI can do the job?

    By S Sullivan

    The key skills for a competent geologist are observation, documentation, analytical thought and the ability to communicate. These attributes have served the geological world for the past two centuries

    Sep 1, 2024