Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Road Infrastructure Security Assessment and Measures Selection Methodology Using SecMan – Tunnel Example

    By J Karlovšek, M Hafner, M Žibert

    The transport network in Europe is probably one of the most important systems for the European economy and society. Trans-national transport routes play a vital role in the traffic of goods and the su

    Sep 17, 2014

  • AUSIMM
    Design of Paste Backfill Plant and Distribution System for the Cannington Project

    Safety bulletins and stickers issued for the paste backfill plant at Cannington read as follows: æCannington Paste Fill Plant, First of ItÆs Kind in AustraliaÆ. We could even dare to state that the Ca

    Jan 1, 1998

  • AUSIMM
    Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical Climate

    By A M. Barrett, P J. Chapman

    As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b

    Jul 27, 2015

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Prediction of Strata Caving Characteristics and its Impact on Longwall Operation

    By Nemick JA

    Recent advances in computer simulation together with field measurements of caving and microseismic activity about longwall panels, has allowed a much better understanding of the caving process and the

    Jan 1, 1998

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    The Use of Fractal Geometry to Model the Spatial Continuity of Gold Grades

    By White A. H, Vihena M. T M B

    Presently, orebody modelling consists basically of fitting a mathematical model to represent spatially a certain geological variable, generally grade. An orebody model is constructed from a set of s

    Jan 1, 1995

  • AUSIMM
    Production Scheduling Using Linear and Integer Programming

    By T GRAHAM-TAYLOR

    A trend towards mining more complex and economically marginal orebodies, often combined with increasingly tight product specifications, increases the number of variables which need to be considered

    Jan 1, 1992

  • AUSIMM
    Hej Hej Sweden, Tak Atlas Copco - The 2006 Atlas Copco Scholarship Experience

    By J MacDiarmid

    Atlas Copco is a leading provider of industrial productivity solutions (Atlas Copco, 2007) and one of the worldÆs largest suppliers of rock drilling equipment. The business division of Atlas Copco Con

    Jan 1, 2007

  • AUSIMM
    Application of Semtech Optical Process Control System at Mount Isa MinesÆ Copper Converters

    By O Pasca, B Hogg

    Consistent slag blow end point detection remains one of the challenges in the Peirce-Smith converters at Mount Isa MinesÆ Copper Smelter. Under blowing results in foaming on copper blow and carry forw

    Jan 1, 2005

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Computer Assisted Modelling of Narrow, Elongate Gold Deposits for Resource Estimation and Mine Planning

    By Ward C. W

    Conventional polygonal and block modelling techniques inadequately represent the grade-thickness distribution of some narrow shear and stratabound gold deposits. The polygonal influence of high-grad

    Jan 1, 1997

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Ventilation considerations and modelling of lithium battery fires inunderground mining

    By C M. Stewart

    Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for

    Oct 12, 2022

  • AUSIMM
    The Mining of J Lens

    By Reeves I. And Farquhar J, Pearce S

    The irregular shape of the Rosebery orebody, coupled with the inconsistencies in grade over short strike lengths, has meant stoping blocks have had to be small to combat dilution and stability probl

    Jan 1, 1993

  • AUSIMM
    Examining the toxicity of respirable coal dust from interaction with\ moisture

    By S Azam

    Coal is a vital energy source and source of carbon for metallurgical applications, contributing significantly to the world economy. Coal mining and processing involve multiple processes that generate

    Oct 12, 2022

  • AUSIMM
    Conditional Simulation for Resource Characterisation and Grade Control - Principles and Practice

    By Sjaw WJ

    Conditional simulation is a set of geostatistical tools that is becoming popular as powerful personal computers make the use of these tools less costly. The more familiar set of tools for spatial esti

    Jan 1, 1997

  • AUSIMM
    Continuous Control of Dense Medium Cyclone Separation Density

    By Horrocks KRS, Smitham JB, Ellison JF

    This paper describes the development and installation of equipment for continuously measuring separating density in the dense medium cyclone circuits of the four million tpa Port Kembla B/C plant co

    Jan 1, 1993

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024