Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineralogy of the Titaniferous Porphyry Copper Deposits of Melanesia

    By Savage E. N

    The porphyry copper minerals of Melanesia occur within a host of narrow veinlets in predominantly quartz diorite stocks or as contact metasomatic masses in skarns adjacent to the intrusion. Some 90 pe

    Jan 1, 1975

  • AUSIMM
    How to Evaluate AG/SAG Test Work

    Autogenous and Semi-Autogenous grinding has become an accepted method of reducing primary crusher product to micron sizes in a single or a two-stage grinding circuit. The elimination of secondary an

    Jan 1, 1991

  • AUSIMM
    Dynamic concepts for mine to mill operation and optimisation

    By R Pax

    Feed ore variability, the major disturbance into a mineral processing plant receives considerable attention operationally, and at research and strategic levels to ensure that the throughput of the ore

    Nov 21, 2018

  • AUSIMM
    New Materials Technology Applied in Longwall Mining

    Coal slurry pumping was introduced into the U.K. in 1973. Gateside packs were prepared in areas of containment using R.O.M. coal and a special fast setting cement. The packs restricted roadway con

    Jan 1, 1986

  • AUSIMM
    Gippsland Basin South Platform: Unprospective or Underexplored?

    I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r

    Jan 1, 1992

  • AUSIMM
    U.S. Coal Mining Accidents And Seam Thickness

    By Thirumalai K, Peluso R. G

    The United States has more than 45 billion tons of economic coal reserves in seams above 10 feet thick and current underground production from thick seams represent less than three per cent of th

    Jan 1, 1976

  • AUSIMM
    Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine Seals

    Legislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov

    Jan 1, 2005

  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    Outlook for Oil Demand in the Pacific Basin Region (9b865cd3-308f-4c90-b186-680dbd93823b)

    Large GDP increases in the Pacific Rim countries have been accompanied by similarly large increases in demand for oil products. In the case of residual fuels, this demand has been tempered by the subs

    Jan 1, 1990

  • AUSIMM
    Blast Monitoring : From Detonation to Impact

    The intention of this paper is to examine the practical and technical aspects associated with the measurement of blasting related phenomena. The emphasis is directed towards the acquisition of quan

    Jan 1, 1990

  • AUSIMM
    A Multiscale Approach to Hydrothermal Gold Systems - Unravelling Mineralisation Processes at the Plutonic Gold Mine

    By J Walshe, G Duclaux, L A. Fisher, R Hough, J S. Cleverley, M F. Gazley

    Characterisation of hydrothermal gold systems across multiple scales is increasingly important for our understanding of ore deposit genesis and for targeting new mineralisation. Published work on mult

    Sep 26, 2013

  • AUSIMM
    Cap Rock Blasting Improvement at Worsley Alumina

    By L Neems

    In conjunction with Orica Explosives, Worsley Alumina have managed a program of continuous improvement to their cap rock blasting over the last two years. Blasting conditions are challenging because o

    Jan 1, 1999

  • AUSIMM
    Lignite/Coal Injection System Installed at the Arbed Esch-Belval Works in Luxembourg

    By Bernard G, Limpach R, Ulveling L

    A major aspect in competitive ironmaking is to replace metallurgical coke by injecting alternative cheap fuels. Whereas in the past, heavy oil injection as well as on a lower scale natural gas inj

    Jan 1, 1981

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Present Situation and Future Trends in the Chinese Steel Industry and Utilisation of Low-Grade Iron Ore Resources

    By J Pan, G Qiu

    In this paper, an analysis is made of the present situation in the Chinese steel industry and its demand for iron ores. It is shown that the demand for iron ores has been growing substantially with th

    Jan 1, 2009

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South Limited

    In this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan

    Jan 1, 1935

  • AUSIMM
    Increasing Production Control Through Reliable Geological Predictive Techniques

    By English W, Poppit I

    COALEX Pry Limited operates two underground steaming coal mines on the western edge of the Sydney Basin near Lithgow, New South Wales. Baal Bone Colliery uses longwall technology for an output of over

    Jan 1, 1991