Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • AUSIMM
    Classification System Efficiency - A Comprehensive Closed-Circuit Grinding Optimisation Metric

    By R E. McIvor, K M. Bartholomew

    Classification system efficiency (CSE) is a simple, powerful metric that provides a comprehensive measure of classification system performance. CSE directly quantifies the amount of coarse solids in t

    Sep 26, 2013

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    The Association Of Tourmaline-Bearing Rocks With Mineralisation At Broken Hill, NSW

    Tourmaline-bearing rocks are a rare rock type of Suites 3, 4 and 5 at Broken Hill. Minor laminated plagioclase-quartz-tourmaline rocks occur in association with the quartz- magnetite rocks of Suite

    Jan 1, 1983

  • AUSIMM
    Recovery of Gold from Gravity Tailings by Flotation

    The purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat

    Aug 1, 2010

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Olivine Reactions During Pelletising of Magnetite Ore at High Temperature Under Oxidising Conditions

    Magnesium-rich olivine is used as an additive in LKABÆs iron ore pellets in order to improve the high-temperature properties of the finished products. Olivine is only added to the pellets that are man

    Jan 1, 2008

  • AUSIMM
    Spontaneous Fire Risk Rating of a Colliery Proposed to be Developed by Short Wall Method of Mining

    By Sen S. K, Banerjee D. D, Nandy D. K

    It has been stressed that the intrinsic spon- taneous heating characteristics of a coal is not enough in predicting spontaneous fire risk of a mine. The influence of extraneous conditions created f

    Jan 1, 1988

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Opening Address (426caabf-1cdd-4389-bf74-85e3eb9fdd3a)

    It is a great pleasure to accept the invitation to open this Joint Conference of The Australasian Institute of Mining and Metallurgy and the American Institute of Mining, Metallurgical and Petrole

    Jan 1, 1978

  • AUSIMM
    Advances in Theory and Application of Non-Electric Initiation Systems to 60 Series Extraction at the Mount Lyell Copper Mine

    By Duniam P

    Sequencing of large underground firings is a critical aspect of blast performance. Using theory developed in open cut operations, where blast results are easier to quantify, a new technique for sequ

    Jan 1, 1995

  • AUSIMM
    Comparison of Effectiveness of Present Methods and Future Trends

    The development of present methods of pillar extraction has evolved from the very earliest of hand mining operations which were limited in scope by venti- lation and transport considerations. Conserv

    Jan 1, 1974

  • AUSIMM
    Industrial Scale Results from Shear Enhanced Thickening Technology

    By I Arburthnot, N Lawler, C Loan

    The function of a thickener is to optimise and accelerate the process of gravity sedimentation. The desired end product (be that maximised concentrated solids or clarified liquid) determines how the t

    Oct 29, 2012

  • AUSIMM
    The Influence of Slurry Rheology on the Performance of Mineral/Coal Grinding Circuits

    This paper summarises the influence of slurry rheology on the grinding throughput of batch laboratory and continuous plant-scale mills operating in open and closed circuit configurations. The resu

    Jan 1, 1978

  • AUSIMM
    Evaporation and Salt Transport Under Variable Climatic Conditions

    By T Baumgartl, B Richards

    The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i

    Jul 10, 2012

  • AUSIMM
    An investigation into maximising the product grade and recovery of dense minerals in a single-stage REFLUX™ Classifier

    By J Zhou, L Crompton, K P. Galvin, J L. Sutherland, C P. Lowes, C Bezuidenhout, J Bijzet

    Platinum Group Metal (PGM) bearing ores from the Upper Group 2 (UG2) reef often contain significant concentrations of chromite which can potentially be upgraded to produce a saleable product. A common

    Aug 24, 2022

  • AUSIMM
    Classification and Control of Hazards in Underground Mines in Poland

    By M Malec, J Szczerbinski

    Hazards in underground mines are concomitant with the mining of mineral deposits and have their source in a minerÆs work environment. The authors of the paper have undertaken a trial classification of

    Jan 1, 1999

  • AUSIMM
    The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist Installation

    The hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista

    Jan 1, 2005

  • AUSIMM
    Carbon-in-Pulp in South Africa

    The carbon-in-pulp (CIP) process is now well established in the South African gold industry, with a total of over I million metric tons of material being treated each month in six large plants. This

    Jan 1, 1982

  • AUSIMM
    The Underground Quarrying of Backfill Material - A Potentially Viable Option (3e0fe107-4258-4ea0-abd2-b85d48fc35ff)

    By Robertson AC

    Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mi

    Jan 1, 1998