Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cost-Efficient Implementation of a Greenhouse Gas Reduction Roadmap in the Mining and Metallurgy IndustryBy M Russ, J Gediga
This paper shows an economic feasible approach to implement greenhouse gas (GHG) reduction measures into the mining and metallurgy industry (MMI). The goal to improve energy consumption is directly li
Jan 1, 2009
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit MinesBy C T. Senra, A Souza
Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor
Jan 1, 2009
-
The Connection between Evaporites and Iron Oxide-apatite Deposits, Yangtze River, China – Laser Ablation Inductively Coupled Plasma Mass Spectrometry Analysis of Na, S, Cl and Br in Fluid InclusionsBy A Audétat, W T. Li
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Middle and Lower Yangtze River metallogenic belt is one of the most important polymetal
Mar 18, 2015
-
The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and CrushingBy J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo
Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in
Aug 24, 2015
-
Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche CavernsBy N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo
This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut
Sep 17, 2014
-
Enough is Enough ù Environmental Fallacies Confronted by the Mining IndustryFor too long we, as an industry, have borne the brunt of irrational claims, poor science and even worse, journalism with regards to our affect on the environment. To some of us, the overwhelming media
Jan 1, 2004
-
Channel Iron Deposits - A Major New District Around the Caliwingina Creek, Central Hamersley Ranges,Western AustraliaBy T Gill, A Faragher, B Scott, V Kakebeeke
In 2000, after six year intensive exploration for high-grade haematite deposits, Rio Tinto included the channel iron deposits (CID) as a specific iron ore target in the Hamersley Province iron ore exp
Jan 1, 2009
-
Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel OperationsBy Reichman J. P
Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a
Jan 1, 1973
-
‘MRC-wiki’ – a Mine Rehabilitation and Closure Knowledge Management Tool for Central Queensland Coalmine PractitionersBy C J. Unger, T Baumgartl, C J. Bond, P Sabourenkov, V C. Glenn
Social licence to mine is influenced by society’s perception of the mining sector’s ability to effectively rehabilitate mined land and for governments to appropriately regulate that process for the br
Jun 28, 2016
-
Support structure design for rock burst damage restraint initiated by a low-intensity seismic waveBy E Kabwe, M Karakus
Deep hard rock underground mines tend to experience high stress as such drives exhibit dynamic responses attributed to a rock burst variant (strainburst). This dynamic behaviour is difficult to predic
Nov 29, 2022
-
Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) MethodVertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e
Jan 1, 2005
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
World Nuclear Energy in Relation to AustraliaÆs UraniumIn the last 40 years nuclear energy has taken its place as a major source of electricity worldwide. It now produces 17 per cent of the world's electricity and could conceivably produce a higher
Jan 1, 1997
-
Process Control - A Technology for the Present and FutureBy DJ McKEE
Process control emerged in the mid-1960s as a new and exciting method of improving the performance of mineral processing operations. The early Australian developments, principally in Broken Hill and
Jan 1, 1992
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014
-
Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyserBy M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal
Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected
Sep 20, 2017
-
Measuring circular economy through life cycle assessment – challenges and recommendations based on a study on recycling of Al dross, bottom ash and shavingsBy G Tranell, E Pastor-Vallés, A Vallejo-Olivares, J B. Pettersen
Metals are essential for the sustainability transition and decarbonisation of society. Yet, it will be paramount to produce them sustainably and minimise the affiliated resource and energy use and the
Aug 21, 2024
-
Olympic Dam open stope observations, tactics and characterisationBy G Capes, L Morizzi, N Mitkas, E Jones, D Grant
This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea
Mar 15, 2021
-
A Field Demonstration of a Modified Wet Scrubber for Dust Control in an Illinois Coal MineBy A Patwardhan, M M. Alam, K K. Thatavar
A commercial wet scrubber was used in the SIU-Joy dust control laboratory to test several concepts for improving the dust control efficiency of a wet scrubber. The concepts tested included two filter-
Jan 1, 2005