Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High Pressure Particle Bed Comminution of Ores Minerals a ChallengeBy Kellerwessei H, Oberheuser G
A major breakthrough in extending the life of the wear material of high pressure roll crushers when treating moist, highly abrasive material has removed the last impediment to the widespread accepta
Jan 1, 1993
-
Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin MineBy M S. Kizil, T OÆConnor
It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At
Jul 1, 2013
-
Optimum Management of Truck Tyres in a MineBy S Casas Castellanos
"Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o
Nov 15, 2016
-
Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.By Hughes J. C
THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia
Jan 1, 1922
-
Toe angle measurement for SAG mill control at Lihir gold mineBy M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz
SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel
Aug 29, 2018
-
Developments in Gas Handling and Associated Environment Activities at Smelting Plants of Mount Isa Mines LimitedBy Whitworth N, Anderson P
New plant has been commissioned to treat off-gases from the Fluo-solids Reactor in the Copper Smelter. The new section of plant was built onto an operating system and commissioned with minimum disr
Jan 1, 1978
-
Calibration and Testing of a Geometallurgical Leaching Protocol for Determining Copper Mineralogical DeportmentBy N L. Turner, D J. Robinson, A J. McFarlane, N M. Chapman, L L. Kuhar, R L. Meakin, R Martin
A number of geometallurgical tests have been developed within the AMIRA P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project, an interdisciplinary collaborative research project involvin
Sep 29, 2013
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy ConcentratorBy C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Dynamic Simulation in Iron Ore Pelletising PlantsBy P Navarra, R Kuhne
Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden
Jan 1, 2009
-
Making Design and Construction WorkBy S Porter
The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th
Jan 1, 1999
-
Economy in a basket: multi-purpose use of gabions at the Porgera Gold MineBy Thompson M
The humble gabion basket is to mine development what the light bulb and safety pin are to eir-ryday life. Gabions provide a flexible, easy to assemble and cost efficient solution for "101" mine and ci
Jan 1, 1994
-
A generalised form of Gy’s equation for gold ores – empirical evidenceBy R C. A Minnitt
The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the fundamental sampling error (FSE), the duplicate sampling analysis (DSA) and the segregation fractionalised
May 9, 2017
-
Site Water Balance Response to Variable Climatic ConditionsBy S Hawker, M Gibbs, A Craven
Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary
Nov 26, 2013
-
Stope-Survey Practice at Mount LyellBy Coulter L. J
THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved
Jan 1, 1915
-
Flow Behaviour of High Solids Brown Coal-Water Suspensions as Liquid FuelsBy Christie GB, Mainwaring DE, Leong YK
High solids brown coal slurries have been prepared with concentrations approaching those achieved with bituminous black coals. The high inherent water content and macroporosity of Victorian brown
Jan 1, 1987
-
Tectonics of Southern PacrimFour data sets are required to put constraints on the tectonic evolution of the southern rim of the Pacific Ocean basinI . data bearing on the dispersal of the major Gondwanaland continental fragments
Jan 1, 1990
-
Resue Mining with eDev™ Electronic Detonators at Stawell Gold MinesBy C Hamilton
Stawell Gold Mines (SGM) is an underground mining operation located in Victoria, Australia. The mining method employed is long hole retreat stoping, utilising up and downholes and artificial concrete
Mar 21, 2011
-
Structural Controls on Gold Mineralisation in the South-eastern Truong Son Fold-thrust Belt and its Significance in Regional MetallogenyBy T X. Le, H T. Tran, K Zaw, T Manaka
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Truong Son fold-thrust belt (TSFTB) is a prominent tectonic component of mainland Indoc
Mar 18, 2015
-
Investigation of Weathering Properties of Tailings Sand From Boliden's Aitik Copper Mine, Sweden ù A Summary of Twelve Years of InvestigationsBy N Eriksson
BolidenÆs Aitik mine, located 100 km north of the Arctic Circle in northern Sweden, is one of EuropeÆs largest copper mines. This operation produces 18 Mt of ore per year and 99 per cent of this tonna
Jan 1, 2003
-
æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel ProductivityBy J Battista, J Grace, I Brunton
The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This
Jan 1, 2004