Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dealing with high-grade data in resource estimationBy O. Leuangthong, M. Nowak
"The impact of high-grade data on resource estimation has been a longstanding topic of interest in the mining industry. Concerns related to possible over-estimation of resources in such cases have led
Jan 1, 2015
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Avoid Average Design in Processing PlantsThe quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st
Jan 1, 2004
-
Recycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect EnvironmentRecycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect Environment
Sep 13, 2010
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives Mining, Metallurgy and Exploration (90281dd3-2aab-47ab-9150-b1897bd40ef5)By M. A. Reyes, L. Yan
Heat and humidity buildup withn refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs in
-
Proceedings, 106th Annual General Meeting, 2003The 106th Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the J.C. Lemmer Auditorium, SA National Museum of Military History, 22 Erlswold Way, Saxonwold, Joh
Jan 1, 2003
-
Longwalling At Great Depth In A Geologically Disturbed Environment - The Way ForwardBy F. Russo-Bello
TauTona Mine (the renamed Western Deep Levels East) is using a longwall mining method with stability pillars to extract the Carbon Leader Reef at a depth ranging from 2097 metres to 3456 metres below
Jan 1, 2000
-
The Influence of Feed Size Distribution on the Staged Flotation of Poorly Floating CoalsBy Nicol S. K, Swanson A. R
The poor flotation response of many coals has in the past been attributed to such factors as differences in rank, differences in degree of oxidation, differences in petrographic composition, or slime
Jan 1, 1978
-
Water Jet Assisted Boring In South African QuartzitesBy J. L. Page, A. C. Marlowe
The Research and Development Services of South Africa has begun underground trials with a Robbins 52RE blindhole borer using a cutterhead fitted with high pressure water jets to assist mechanical cutt
Jan 1, 1985
-
Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)By N. Romani, R. Provost
"Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i
Jan 1, 2016
-
IC 8767 Guide For The Construction Of Driven-Rod Ground BedsBy R. L. King
This report describes a method for designing and constructing ground beds that has been developed under the sponsorship of the Bureau of Mines. The procedures for designing and constructing a driven-r
Jan 1, 1978
-
Installation Of Bored Pile Casings Through An Asbestos Tip By Rotary DisplacementBy Lewis Stansfield
A rotary displacement method was used to install permanent steel casings for bored piles through an asbestos tip. This method was chosen in preference to alternative driven systems because it was quie
Jan 1, 2000
-
Image-Based Change Detection for Bridge InspectionBy R. S. Adhikari
The changes in defects patterns or in element condition index during visual inspection of bridges are primary concerns for inspectors. This paper presents a new approach for change detection of defect
Aug 1, 2013
-
Reliability-Centered Maintenance of Rapier Dragline for Optimizing Replacement Interval of Dragline Components "Mining, Metallurgy & Exploration (2020)"By Snehamoy Chatterjee, Sanjay Kumar Palei, Smarak Das
Machine manufacturers’ recommendations on maintenance strategies of capital-intensive draglines are not always based on real data and therefore lead to losses from downtime. This paper proposes a prev
May 28, 2020
-
IC 8047 Methods In Driving The 5490 Railroad Tunnel, Kennecott Copper Corp., Salt Lake County, Utah ? Summary And IntroductionBy V. T. Dow
This report describes construction details and methods used in driving the 5490 tunnel at the Kennecott Copper Corp, property, Bingham, Utah. The tunnel will provide railroad access to the world-famou
Jan 1, 1962
-
History, Tectonic Setting, and Models for Instrusion-Related Gold Deposits in Southwestern New Brunswick, Canada: Examples from the Clarence Stream AreaBy K. G. Thorne, M. J. McLeod, D. Hoy
"Throughout the Paleozoic, a variety of gold depositional environments were created in the New Brunswick segment of the northern Appalachians because of the complexity of arc and continental plate col
Jan 1, 2008
-
Evaluation of liner capacity for blast damage mitigationBy J. F. Archibald
A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining
Jan 1, 2004
-
Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385By V. Rajaram
R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou
Jan 10, 1986
-
Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and futureBy S. Hoskins, S. Chiovelli
"The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on
Jan 1, 2004
-
Truck Selection and Application at HiltonBy L. Price, R. Hortie
Movement of ore and waste from the Hilton Mines pit is accomplished by truck haulage. With the aim of reducing costs, a study of truck fleet replacement was initiated. The study included on-site short
Jan 1, 1971