Search Documents

  • TMS
    Simulation of The Moulds Filling by the Finite Elements / Control Volume Method During RTM Process

    By J. Samir

    The objective of this study is to simulate the isothermal filling up of moulds by a RTM process when adopting CV/FEM and VOF method and when also taking into account the presence of obstacles coupled

    Jan 1, 2009

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • AUSIMM
    Use of Backscattered Gamma Radiation for Determining Grade of Iron Ores in Blast Holes and Development Drill Holes

    By Wylie A. W, Mathew P. J, Eisler P. L

    Field studies of the radiations backscattered by iron ores from a 60Co source of primary gamma radiation located in a borehole logging probe have confirmed thatthe P" factor, a ratio of high ener

    Jan 1, 1977

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.

    By Alexander J. Verstraeten

    The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev

    Jan 1, 1987

  • ISEE
    Thermodynamic Work Principal Overture — Not Just Rock n’Roll

    By Michael Wieland

    The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant

    Jan 1, 2009

  • CIM
    The iron elephant: A brief history of hydrometallurgists 2019 struggles with element no. 26

    By A. J. Monhemius

    This paper reviews the history of modern iron-control processes in hydrometallurgy. Attention is paid to processes developed in the electrolytic zinc industry for removal of iron from zinc sulfate lea

    Jan 1, 2017

  • TMS
    Plant-Wide Process Control For The Collahuasi Project

    By Alex Del Castillo

    The mineral processing industry has followed the development of database control systems, and various systems have been installed in existing and new plants. The goal is to improve product quality, ra

    Jan 1, 1999

  • AUSIMM
    Management of Hydrogeological Risk in Tunnelling Projects

    A key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf

    Jan 1, 2008

  • NIOSH
    OFR-118-77 Development Of A Radiochemical Method For Analyzing Radon Gas In Uranium Mine Atmospheres

    By L. Stein

    A simplified radiochemical method has been developed for quantitatively analyzing; radon gas in underground uranium mines. In this method, a measured volume of air is drawn by a pump through a drying

    Jan 1, 1977

  • AUSIMM
    The Taranaki Oil-Field

    THE Taranaki oil-field is situated on the western side of the North Island of New Zealand, at about its widest part, and may be said to be the most compact and fertile part of the Dominion, for, with

    Jan 1, 1912

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • AUSIMM
    Surface-Area Measurement of Chalcopyrite Concentrates by Methylene Blue Dye Adsorption from Aqueous Solution

    By Tyler R. J

    Methylene blue dye adsorbs on chalcopyrite concentrates slurried in aqueous solution. Saturation adsorption can be achieved within about 24 hours for dye equilibrium concentrations greater than about

    Jan 1, 1979

  • SME
    Comparison of Different Blast Design Models, Using a Blasting Software

    By Roozbeh Afzali

    Designing an appropriate tunnel blasting pattern reduces the cost of rock breakage and subsequent operations such as loading, haulage and support of tunnels. For that reason, we developed a software t

    Jan 1, 2008

  • ISEE
    A New and Reliable Technique for Safely Removing Underground Rock Hang-ups

    By Brian Micke, Mick Gavrilovic

    The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h

    Jan 1, 1999

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • DFI
    Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . Synopsis

    By Lucien Weber

    In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working

    Jan 1, 1987

  • CIM
    Reverse Osmosis Desalination Plant at the Bougrine Zinc-Lead Mine, Tunisia

    By Ammar Henchiri, Godfrey McDonald

    "Breakwater Tunisia S.A.’s Bougrine mine is located in a semi-arid region of Tunisia characterized with Triassic salt domes. Due to extensive agricultural land-use in the mine area, a zero-discharge t

    Jan 1, 2003

  • ABM
    Danieli To Upgrade The 150 Ton Eaf At Ferriere Nord - Osoppo. Successful Start-up Of The New Danarc Eaf In Scheduled Time

    By Uwe Wilhelm

    Pittini Group has contracted Danieli in 2011 for the supply and replacement of the existing EAF at Ferriere Nord Plant in Osoppo. This was a very challenging project: giving the fact that the Meltshop

    Jul 30, 2018

  • SAIMM
    Mechanization - An Anglo Platinum Perspective

    By A. M. Croll

    The efforts to mechanize narrow reef tabular orebodies unique to this country, are not new. They began in the early 1900s and have over the last century seen varied rates of progress and success. Effo

    Jan 1, 2004