Search Documents

  • CIM
    Arching Effects and Sillmat Behaviour

    By Euler De Souza

    This paper presents a study conducted to assess sillmat behaviour during undercut mining and to provide a comprehensive understanding of the effects of arching and sillmat thickness on stability. The

    May 1, 2002

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • NIOSH
    IC 7823 Mining Methods And Costs At The Rialto Mine, Nellie B Division, American Zinc, Lead & Smelting Co., Ottawa County, Okla. ? Introduction

    By W. F. Netzeband

    This paper, which describes mining methods and practices at the Rialto zinc-lead mine American Zinc, Lead & Smelting Co., in northeastern Oklahoma, is one of a series being prepared by the Bureau of M

    Jan 1, 1958

  • CIM
    The Use of Charcoal as an Alternate Internal Fuel Addition in the Pelletising Process

    By Keith R. Vining

    Solid fuel, usually coke or anthracite, is commonly added to ground iron ore fines in the pelletising process to reduce the amount of burner fuel required and the maximum firing temperature, while mai

    May 1, 2007

  • CIM
    Selectivity in the Collectorless Flotation of Two Complex Sulphide Ores

    By M. Leroux, P. Lacombe, S. R. Rao, J. Y. Kim, J. A. Finch, G. Labonté, N. Macminn, M. Ounpuu

    "Laboratory investigations on two complex ores, the A1 zone ore from Les Mines Selbaie and the Lyon Lake ore from Mattabi Mines Ltd. (Division of Noranda Minerals), have been carried out to determine

    Jan 1, 1990

  • CIM
    10th Anniversary of First Installed HPGR Replacing Tertiary Crusher

    By Frank van der Meer, Jorge Portocarrero, Alexandra Gruendken

    "The number of High Pressure Grinding Rolls (“HPGRs”, also called Roller Press) installations instead of tertiary crushers is rapidly increasing. The technology has been largely accepted in the minera

    Jan 1, 2009

  • SME
    Recent Developments in the TBM Industry—New and Innovative Technologies

    By Martin Herrenknecht, Karin Bäppler

    The last five years have seen a remarkable increase in tunnelling projects in both soft ground and hard rock applications. Part of the increase is a result of recent Research & Development efforts to

    Jan 1, 2005

  • SME
    Evolution Of Controlled Blasting Practices Dragon Products Company, LLC Quarry Operations, Thomaston, Me

    By K. Boakye

    This paper presents the results of a review of historic blast design practices at the Dragon Products Company, LLC (Dragon) Quarry Operation, along with the results of two different blast design vibra

    Feb 27, 2013

  • SME
    The Minetrain Project; Developing an Advanced-Level Training Program for Mining Professionals in an Actual Deep Mine Site

    By Z. Zhang, M. S. Gonzalez, M. de P. Bueno, P. Holopainen, S. Luukkanen

    "Despite being a field of study that requires practical knowledge and experience, mining engineering education follows the same pattern in most mining universities around the world, consisting of theo

    Oct 1, 2019

  • NIOSH
    RI 7387 Seismic Effects Associated With An Underwater Explosive Research Facility

    By Joseph L. Condon

    Fifteen shots of three explosives with charge weights of 0.52, 1.1, 3.1, and 5.1 kilograms were fired in a pond to study the seismic effects of detonating explosives in water. Shock pressures and bubb

    Jan 1, 1970

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • SME
    SME Meets With the SEC – Resources and Reserves Reporting Discussed

    By Jean-Michel Rendu

    On April 30, 2003, representatives of the Society for Mining, Metallurgy and Exploration, Inc.(SME) met with the staff of the Division of Corporation Finance of the U.S. Securities and Exchange Commis

    Jan 1, 2003

  • ISEE
    Optimization of Blast Fragmentation at Kisladag Gold Mine

    By Erkan Bayrak, Serkan Erkara, Ozkan Duzgun, Ekin Gungor

    This paper presents part of the outcomes of the drill and blast optimization project carried out at Kisladag Gold Mine in Turkey. Kisladag Gold Mine is the largest gold mine in Turkey with a low-grade

    Jan 1, 2015

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • SME
    Limestone Mining – Is It Noisy Or Not? (a6f0b5ad-a610-4972-afd6-68c53ccd734c)

    By D. R. Babich, E. R. Bauer

    National Institute for Occupational Safety and Health (NIOSH) researchers are conducting a cross-sectional survey of equipment noise and worker noise exposures in the mining industry. Surface and und

    Jan 1, 2006

  • AUSIMM
    Project Delivery

    By E Skinner, G Lane

    Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and

    Jul 15, 2013

  • SME
    Applicable Analytical Tools For A Seismic Design Of Underground Excavations

    By Christopher M. St. John, Tony F. Zahrah

    Empirical and numerical methods are the two extremes of the tools available for the seismic design of subsurface excavations and underground structures. Both have their limitations: when relying on pu

    Jan 1, 1985

  • CIM
    Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold Mining

    By Simon D. Handelsman

    ?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo

    May 1, 2006