Search Documents

  • SME-ICGCM
    Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?

    By Dan Payne

    The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo

    Jan 1, 2008

  • DFI
    Pin Piles For Structural Underpinning - Summary

    By Seth L. Pearlman

    Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou

    Jan 1, 2000

  • AUSIMM
    Conversion of hard-to-use wastes to new raw materials for low-energy glass/mineral-wool manufacturing

    By Z Li, Z Yan, T Htet, S Zhang

    During the pyrometallurgical processes, a substantial quantity of high-temperature ironmaking and steelmaking slags, generated at temperatures ranging from 1400 to 1600°C, is wasted, as the heat conta

    Aug 21, 2024

  • SME
    New York Subway Caverns and Crossovers—A Tale of Trials and Tribulations

    By Charles Stone, Madan Naik, Drupad Desai, Karel Rossler

    Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1

    Jan 1, 2005

  • IIMP
    El yacimiento Tres Cruces y la evolución de sus modelos genéticos de geología económica

    By David Heyl

    "El presente texto señala la evolución de los modelos genéticos de geología económica del yacimiento minero Tres Cruces. Dicho yacimiento se encuentra localizado en el noreste del Perú, adyacente al d

    Apr 26, 1999

  • SME
    Engineering And Construction Of The Goldstrike Roaster Facility

    By B. Burke, R. Colquhoun, K. Thomas, R. Walton, D. Fentie

    The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • SME-ICGCM
    Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mines

    By A. Wahab Khair

    Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-

    Jan 1, 2008

  • ISEE
    Impact-Induced Fragmentation of Rock and Size Distribution Analysis

    By Bibhu Mohanty, Sheng Huang

    Accurate measure of fragment size distribution is a key objective in all blasting and crushing operations. Several generic distribution functions have been devised to describe the degree of fragmentat

    Jan 1, 2016

  • SME
    Mining, EPA, and toxic waste : Will your mining company be liable?

    By Peter Haller

    Introduction The impact of the Comprehensive Environmental Response, Compensation, and Liability Act, or Superfund, as well as the Resource Conservation and Recovery Act (RCRA) and their state counte

    Jan 2, 1987

  • AUSIMM
    Sulphuric Acid Production at Port Pirie

    The production of sulphuric acid at Port Pirie by the contact process began in March 1924 with the commissioning of the Electrolytic Zinc Co.'s roasting and acid plant. This plant, operated by B.

    Jan 1, 1956

  • AIME
    Howe Memorial Lecture

    Jan 1, 1933

  • SME
    The Germination Of A Failure: The Role Of Human Factors In Effective Root Cause Analysis

    By R. J. Latino

    Because of the lack of a universally accepted definition or standard for RCA, we are left to our own conventions in the marketplace as to what is most ?effective? or a ?Best Practice? for our own faci

    Feb 27, 2013

  • SME
    History And Development Of Aeration In The Cerro Verde Mine

    By G. Velarde

    This paper presents the metallurgical results of column and stockpile leach tests with forced aeration to determine the usefulness of this process in the operational leaching at Sociedad Minera Cerro

    Jan 1, 2006

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • DFI
    Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? Introduction

    By D. Arentsen

    Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin

    Jan 1, 1987

  • DFI
    Information Construction Technology For Supported Excavation In Urban Construction

    By Sun Jiale

    This paper presents a brief description of information construction technology for supported excavation to assure satisfactory performance of engineered system. As a successful example of application

    Jan 1, 1991

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • CIM
    Mining at Depth under Weak Rockmass São Bento Mineração S/A Santa Bárbara, MG Brazil

    By Barnard Foo

    Topics of Discussion ?Location ?Production & Mining Operation ?Mineralization ?Mining Method ?Rock Mechanics Issues ?Ground Control Problems ?Numerical Analysis ?RockmassBehaviour ?Conclus

    Feb 1, 2008

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009