    Interpreting Continuous Velocity of Detonation Measurements

    By Bruce Vandenberg

    Two tests were set up as part of the course given by Blasting Analysis International. Both tests were performed using the prototype Velocity of Detonation Recorder (VODR). The prototype has several li

    Jan 1, 1990

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine. Montana Technological University (Montana Tech

  • AUSIMM
    Developments and Future Benefits of Long-Hole Directional Drilling in New Zealand

    By B B. Beamish

    Long-hole directional drilling for in-seam exploration was introduced to New Zealand at Huntly West Mine in 1989. Following the success of this initial drilling program the Coal Corporation of New Zea

    Jan 1, 1993

  • DFI
    Large-Scale Earthquake-Induced Landslide Repair Following New Zealand’s Kaikoura Earthquakes

    By Mathew Avery, Colby Barrett

    In November 2016, a 7.8-magnitude earthquake caused more than 100,000 cubic meters of rock and debris to tumble down and bury the transportation infrastructure below Ohau Point in New Zealand. All rou

    Jan 1, 2018

  • AUSIMM
    False Colour Backscatter Electron Images and Their Application During Electron Microprobe Analysis of Ores and Host Rocks

    By Ramsden AR, French DH

    The limited contrast range of conventional black and white imaging does not enable full use to be made of the dynamic range of the video signal obtained from a scanning electron microscope or micro

    Jan 1, 1989

  • NIOSH
    RI 9657 - Recommendations For Testing Radar-Based Collision Warning Systems On Heavy Equipment

    By Todd M. Ruff

    Researchers at the National Institute for Occupational Safety and Health are investigating technologies that could be used to detect objects, small vehicles, and pedestrian workers that may be in the

    Jan 1, 2002

  • SME
    Design and Construction of REM Tunnels and Underground Structures - RETC2023

    By Verya Nasri, Agustin Rey

    Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill

    Jun 13, 2023

  • AIME
    Minerals Beneficiation - Exothermic Hardening of Cu-Ni Sulfide Agglomerates

    By F. Petkovich, M. P. Sudbury

    Development of a new method of treating flotation concentrates for the preparation of feed suitable for direct charging to blast furnaces or converters is described. The method takes advantage of the

    Jan 1, 1961

  • IMPC
    An Investigation into Hydrocyclone-Thickener Dewatering Circuit: A Pilot Scale Study

    By M. Unesi, S. Haj Mohammadi, M. R. Abdoli, M. R. Garmsiri

    "Hydrocyclone-thickener circuit is a promising solution to enhance the dewatering efficiency in mineral industries. The challenges in the circuit is reducing particle size in the thickener feed and th

    Jan 1, 2018

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • CIM
    A Continuous Improvement Model Linking Planning and Operations

    By Paul Clark

    Generation - Profile l 9,726 megawatts (MW) of capacity l 46,877 gigawatt hours (GWh) produced at an average plant availability of 88.4% l 47 facilities in four geographies: Canada; the U.S.; Mexic

    May 1, 2004

  • NIOSH
    Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings

    By Gabriel S. Esterhuizen, Anthony T. Iannacchione

    The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stabilit

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • SAIMM
    Aspects Of Saf Smelting Of Ferrochrome

    This paper provides a review of the chemical reactions occurring in the submerged arc processing of chromite ores. The excavations of industrial furnaces have shown that the charge, as it descends thr

    Jan 1, 2004

  • AUSIMM
    Practical Stope Reconciliation in Large-scale Operations Part 2, Olympic Dam, South Australia

    By J Wesseloo and Y Kim, Y Potvin, G Mungur, D Grant

    At the previous MassMin conference held in Sudbury in 2012, the authors proposed a new framework going beyond dilution and equivalent linear overbreak sloughing (ELOS) for stope reconciliation in rela

    May 9, 2016

  • NIOSH
    Coal Mine Inertisation By Remote Application

    By M. A. Trevits, I. R. Houlison, A. C. Smith, T. P. Mucho

    Timely and rapid intervention to underground combustion events (fires, explosions, and spontaneous combustion) is the key to the successful control of the mine atmosphere and restoring of a coal mine

  • NIOSH
    Using Proximate Analysis to Characterize Airborne Dust Generation from Bituminous Coals

    By Steven J. Page, John A. Organiscak

    The amount of airborne respirable dust generated from break- age of different coals varies widely. This research was conducted to identify the facets of airborne respirable dust liberation from the co