Search Documents

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • ISEE
    Comparative Blasting Using Non-Electric Pyrotechnic Delays and the Electrodet Electronic Delay System at a Limestone Quarry in New York State, USA

    By Carl Lubbe, Ron Frye, Wayne Curtis, Julie Pecori, Dan Leach

    Blasting conducted in the USA using the new Electronic Initiation System developed by Altech has shown that an accurate delay system will benefit the customer. Results from test work clearly showed th

    Jan 1, 1997

  • DFI
    Crane Boom Loadings From Pile Driving

    By Alan G. MacKinnon

    Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s

    Jan 1, 1986

  • NIOSH
    Developing Toolbox Training Materials For Mining - What Is Toolbox Training And Why Use It?

    By Floyd D. Varley, C. M. K. Boldt

    Toolbox training is often described as short, informal training conducted at a worksite by technically competent persons for the benefit of a work team. The key feature of toolbox training is the focu

    Jan 1, 2002

  • ISEE
    Analysis of Mining Explosion Performance with Multiple Sensor Data and Physical Models

    By Brian Stump, David Anderson, D. Craig Pearson, Robert Martin

    Mining explosions designed to move, bulk or fracture rock are often composed of a number of explosions arranged in a complex spatial and temporal pattern. The effects of the explosions are strongly de

    Jan 1, 2000

  • SME
    Beneficiation Of Low-Grade Limonite Ore By HIMS-Cationic Reverse Flotation And Magnetic Roasting-LIMS Techniques

    By L. Xinghua

    Limonite is a general term for a group of amorphous iron oxide and iron hydroxide materials. It is considered as one of the very refractory iron ore types due to its wide variation in chemical composi

    Feb 27, 2013

  • AUSIMM
    Some Notes on Sampling for Gold

    In choosing such a threadbare subject for a paper I fear that I may in some measure be taxing your patience, yet as upon the accuracy with which the work is done depends the result of conclusions draw

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • DFI
    Unusual Dolphin Monopile Structure

    By C. T. Christensen

    The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg

    Jan 1, 1989

  • DFI
    Tied-Back Micropile Walls In Landslide Repair

    By Kevin W. Cargill

    In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound

    Jan 1, 2006

  • NIOSH
    An Alarm To Warn Of Overhead Power Line Contact By Mobile Equipment

    By J. C. Cawley, G. T. Homce, M. R. Yenchek, H. K. Sacks

    As in many other industries, such as construction and agriculture, overhead electric power lines are a serious hazard at mining and mining-related operations. Even when excluding injuries that occur

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • DFI
    Keynote Lecture: Axial Design And Lateral Design - Deep Foundations

    By Mike Neill, O&apos

    ? Bypass soft soils near the surface ? Resist uplift loads ? Resist lateral loads ? Bypass scourable soils ? Bypass liquefyable soils ? Mitigate movement of expansive or frozen soils ? "Tu

    Jan 1, 1998

  • AIME
    Institute of Metals Division - Planar Correction of Mehl-Rhines Classical Diffusion Data (TN)

    By R. J. Reynik, F. R. Meeks

    IN the classical paper1 of Mehl and Rhines entitled "The Rates of Diffusion in the Alpha Solid Solutions of Copper", the authors state: "It has been mathematically demonstrated that the treatment of t

    Jan 1, 1965

  • SME
    Episyenites—Characteristics, Genetic Constraints, and Mineral Potential Mining, Metallurgy and Exploration

    By O. T. Rämö, E. Suikkanen

    Episyenites are sub-solidus, quartz-depleted alkali-feldspar-rich rocks. They form veins and lenticular bodies in granitoid rocks and migmatites in a late- to post-orogenic or anorogenic setting. Leac

  • SME
    Episyenites—Characteristics, Genetic Constraints, and Mineral Potential Mining, Metallurgy and Exploration - Mining, Metallurgy & Exploration (2019)

    By O. T. Rämö, E. Suikkanen

    Episyenites are sub-solidus, quartz-depleted alkali-feldspar-rich rocks. They form veins and lenticular bodies in granitoid rocks and migmatites in a late- to post-orogenic or anorogenic setting. Leac

  • NIOSH
    OFR-1-81 Improved Ore Recovery From Phosphate Open Pits In The Phosphoria Formation

    By W. A. Young

    To initiate this project a critical evaluation of the pre-sent phosphate mining industry in the Western phosphate field was conducted. Mines were visited, mine operators were interviewed and pertinent

    Jan 1, 1980

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009