Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Effect of Longwall-Induced Subsurface Deformations on Shale Gas Well Casing Stability under Deep Covers

    By Peter Zhang, Todd Minoski, Mark Van Dyke, Daniel W. H. Su

    "This paper presents the results of a 2017 study conducted by the National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Mining Research Division (PMRD), to evaluate the effects of

    Jan 1, 2018

  • SME-ICGCM
    Instrumentation and Monitoring For Pillar Extraction in a Deep, Faulted Uranium Mine (3da9a7b4-75c4-492e-843f-6defa6026a38)

    By Thomas R. Scotese

    A rock mechanics instrumentation and monitoring program was implemented during pillar extraction at Gulf Mineral Resources' Mt. Taylor Mine, the deepest uranium mine in the U.S. Three types of mo

    Jan 1, 1984

  • SME-ICGCM
    Laboratory Testing of Rib Straps

    By E. Bane Kroeger

    Rib failure is a hazard that has resulted in many injuries and fatalities in underground coal mines, especially in soft coal seams. Conventional rib control methods including rib boarding, shotcreting

    Jan 1, 2004

  • SME-ICGCM
    Single Point And Full Scale Laboratory Testing Of Timber Chock Construction

    By Jim Galvin

    4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri

    Jan 1, 2000

  • SME-ICGCM
    Potential Application of Short Encapsulation Pull Test (Sept) Data to Project Relative Roof Control Risk

    By Yoginder Paul Chugh, Jason E. Tinsley

    "Over the last five years, the authors have compiled a database of Short Encapsulation Pull Test (SEPT) evaluations from Interior Basin (Basin) coal mines. Typically, SEPT data are analyzed to obtain

    Jan 1, 2016

  • SME-ICGCM
    Pillar Design and Roof Support for Controlling Longwall Headgate Subject to High Horizontal Stresses

    By D. W. H. Su

    A two-year study was conducted by CONSOL in a northern West Virginia coal mine to evaluate pillar design and support requirements to improve roof control in right-hand longwall headgates subject to hi

    Jan 1, 2003

  • SME-ICGCM
    Thrust Bolting: A New Innovation In Coal Mine Roof Support

    By Stephen C. Tadolini

    A new innovation in coal mine roof support has been developed by the Bureau of Mines at the Denver Research Center. The technique, called "Thrust Bolting,"1 converts a traditional passive roof support

    Jan 1, 1990

  • SME-ICGCM
    The Effects of a Passing Longwall Face on the Roadway, Pillars, and Standing Supports in Northern West Virginia

    By David Gearhart, Peter Zhang, Gabriel Esterhuizen

    "Researchers from the National Institute for Safety and Health (NIOSH) installed instruments in the track entry and in the pillars of a northern West Virginia longwall coal mine between two planned pa

    Jan 1, 2018

  • SME-ICGCM
    Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars

    By Hamid Maleki

    Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv

    Jan 1, 2000

  • SME-ICGCM
    Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study

    By Li Yang, Andre Cezar Zingano, Alberto Fronza

    "Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f

    Jan 1, 2017

  • SME-ICGCM
    Protecting Underground Coal Miners From Rib Falls

    By Michael Gauna

    In 2010, the number of fatal rib falls in U.S. underground coal mines exceeded fatal roof falls for the first time ever. While recent trends have seen roof fall fatalities reduced by about 62% since t

    Jan 1, 2011

  • SME-ICGCM
    Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later

    By Gift Makusha

    Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u

    Jan 1, 2004

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension Problem

    By Guy Reed, Russell Frith

    "Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h

    Jan 1, 2017

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014

  • SME-ICGCM
    Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, Australia

    By Winton J. Gale

    The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in

    Jan 1, 2011

  • SME-ICGCM
    Roof Behavior In South African Coal Room And Pillar Panels

    By Bruce W. Jack

    An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using

    Jan 1, 2000

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    "Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"

    By Rusty Mchenry, Craig Dickerson, Robin L. Oldham

    "It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl

    Jan 1, 2015