Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Economic Impact of Ascending Mine?Waters in Germany

    By Axel Preusse

    Due to a political decision, German hard coal mining will come to an end in the year 2018. By then, there will have been more than 150 years of industrial grade mining activities. Located in the weste

    Jan 1, 2013

  • SME-ICGCM
    Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine

    By Adrian L. Moodie

    Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.

    Jan 1, 2011

  • SME-ICGCM
    Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled Stope

    By Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen

    "As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.

    Jan 1, 2018

  • SME-ICGCM
    The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams

    By Yang Li

    For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall

    Jan 1, 2014

  • SME-ICGCM
    Fiber Reinforced Polymer Rockbolts for Ground Control in a Strong Jointed Rock Mass

    By Samrat Mohanty

    The construction of underground hydrocarbon storage caverns in Jurong Island, Singapore, is nearing completion. The facility, located beneath the seabed of Banyan Basin, is comprised of five storage

    Jan 1, 2014

  • SME-ICGCM
    An Integrated Approach to the Monitoring and Modeling of Ground Movements

    By A. Chrzanowski

    The integrated approach to monitoring surveys is based on a simultaneous utilization of geodetic, photogrammetric and geotechnical measurements of displacements, tilts, strains and any other geometric

    Jan 1, 1984

  • SME-ICGCM
    Shear Bond Characteristics in Grouted Cable Bolts

    By Jian Yong Chen

    The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o

    Jan 1, 2005

  • SME-ICGCM
    Discriminating Mining Induced Seismicity from Natural Tectonic Earthquakes in the Wasatch Plateau Region of Central Utah

    By Kristine L. Pankow, Keith D. Koper, Michael K. McCarter, Jared R. Stein

    "The Wasatch Plateau region of central Utah contains a number of active underground coal mines in an area of well-documented natural seismicity. As a result, there are several hundred seismic events r

    Jan 1, 2015

  • SME-ICGCM
    Application in Design for Close Proximity Multi-Seem Mining

    Virtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl

    Jan 1, 1987

  • SME-ICGCM
    Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture Radar

    By Jessica M. Wempen

    Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface

    Jan 1, 2014

  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984

  • SME-ICGCM
    A New Generation of Web-Based Applications for Mine Design

    By Nathaniel Schaefer, Christopher Newman, Zach Agioutantis

    "As mining reserves continue to be developed in deeper and more complex geological and geometric conditions, there has been an increased demand for underground mine designs to better reflect site-spec

    Jan 1, 2017

  • SME-ICGCM
    Floor Heave Control Outby the Seal Line in No. 11 West Kentucky Seam

    By Joel Bradley, Kot Unrug, Kyle Perry, Mark Klimek

    "A West Kentucky mine operation in No. 11 seam, encountered floor heave, due to the localized increase of the thickness in the fireclay mine floor. Floor heave has overridden seals installed in two mi

    Jan 1, 2015

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Basic Procedures for Monitoring and Modeling Abandoned Underground Coal Mines for Safety Due to Uncontrolled Closures: Case Study of Verdinho Mine, Santa Catarina State, Brazil

    By Selmar A. Oliveira

    "Safe mine closure is an important step in the mining lifecycle. Plans for safe and efficient closure should begin at the inception of mining. Ideally, closure occurs when the reserve has been deplete

    Jan 1, 2017

  • SME-ICGCM
    Options to Control Groundwater-Based Georisks along Geological Faults in the Large Scale Area of Influence of an Open Pit Mine

    By Markus Papst, Denise Millier, Daniel Beckers, Axel Preusse

    "At an open-pit lignite extraction mine in Germany, groundwater has to be pumped over a large area, which leads to subsidence at the surface. As long as the geology of the area of influence is homogen

    Jan 1, 2016

  • SME-ICGCM
    Learning Our Geotechnical Limits and Pushing Our Longwalls Through Them

    By Richard N. Campbell

    The world?s ever-expanding demand for energy and coking coals has resulted in the underground mining industry looking at taking on increasingly marginal and geotechnically challenging deposits. The dr

    Jan 1, 2014

  • SME-ICGCM
    Key Technologies of Integration of Coal Mining–Gangue Washing–Gob Backfilling

    By Wei Yin, Yu Wu, Xiexing Miao

    "For engineering problems of “three under” coal (coal trapped under buildings, waters-bodies and railways) exploitation, environment protection and gangue separation from raw coal underground exist in

    Jan 1, 2015

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017

  • SME-ICGCM
    Comparison of Pillar Strengths Calculated Using Empirical Equations and Finite Elements

    By Aarao de Andrade Lima

    Mechanical properties typical of coal are used in the comparisons of pillar strengths based on finite elements and the empirical equations of Holland-Gaddy, Salamon-Munro, Obert¬Duvall, and Bieniawski

    Jan 1, 1997