Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Blueprint for Performance-Driven Operations Management Mining, Metallurgy and ExplorationBy W. F. Visser
The growing availability of information and data analysis capabilities of recent years provides new opportunities for improving the performance of mining operations. By using real-time measurements an
-
Linear Analysis And Ground ControlBy M. A. Evanto
Since the late 1970's, the Roof Control Division (RCD) of MSHA's Technical Support has been performing linear analyses for the enhancement of miners' safety. This remote sensing process
Jan 1, 1998
-
Oversize Reduction Project At The Iron Ore Company Of Canada (ME)The Iron Ore Company of Canada (IOC) is the largest manufacturer of iron ore pellets in Canada and its customer base covers North American, European and Asian steel producers. The company operates a m
Jan 1, 2011
-
Significant Developments In Dry Rare-Earth Magnetic Separation - Preprint 09-004By M. Dobbins
The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980?s began a new era of dry magnetic separation. The RER units quickly became the separator of choice with
Jan 1, 2009
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and ExplorationBy Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang
The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te
-
Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and Exploration (9bd09701-4fce-4153-aadd-0723612382a9)By Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang
The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te
-
Fuzzy Logic Self-Tuning PID Controller Design for Ball Mill Grinding Circuits Using an Improved Disturbance Observer Mining, Metallurgy and ExplorationBy Hamed Khodadadi, Hamid Ghadiri
In this study, a fuzzy logic self-tuning PID controller based on an improved disturbance observer is designed for control of the ball mill grinding circuit. The ball mill grinding circuit has vast app
-
Fuzzy Logic Self-Tuning PID Controller Design for Ball Mill Grinding Circuits Using an Improved Disturbance Observer Mining, Metallurgy and Exploration (ad065287-325d-4c37-9f3a-f3531e4c1359)By Hamed Khodadadi, Hamid Ghadiri
In this study, a fuzzy logic self-tuning PID controller based on an improved disturbance observer is designed for control of the ball mill grinding circuit. The ball mill grinding circuit has vast app
-
Development Of A Tool To Predict Performance Of Debladed Main Fans At Henderson MineBy D. Loring, J. Almgren
Climax Molybdenum Company’s Henderson Mine is a large panel caving molybdenum mine located about 43 miles west of Denver, Colorado. Three Joy M120-72-880 fans are installed in parallel on the No. 1 ex
Jan 1, 2007
-
Extended Cut Mining And Worker Safety In Underground Coal MinesBy E. R. Bauer
The ground control aspects and occupational safety concerns of extended depth-of-cut mining are presented in this U.S. Bureau of Mines (USBM) report. The scope of extended cut use and typical face ope
Jan 1, 1995
-
Computational Fluid Dynamics Study Of Tracer Gas Dispersion In A Mine After Different Ventilation Damage ScenariosTracer gases are an effective method for assessment of mine ventilation systems, but their dispersion characteristics can differ substantially as ventilation parameters, such as flow path and velocity
Jan 1, 2012
-
Origins Of Clay Minerals In The Molycorp Mine Goathill North Rock Pile, Questa, NmBy V. McLemore, N. Dunbar, K. Donahue
There are three principle lines of evidence that indicate the clay minerals found in the Goathill North (GHN) rock pile at the Molycorp mine are predominantly a product of hydrothermal alteration, not
Jan 1, 2007
-
Assessing the contribution of underground in-situ coal gasification (UICG) within a sustainable development frameworkBy Z. Hyder, M. Karmis
Underground or In-situ Coal Gasification (UCG or UICG), though not a new concept, is now attracting considerable global attention as a viable process to provide a "clean" and economic fuel from coal.
Jan 1, 2011
-
Learning from Workers’ Near-miss Reports to Improve Organizational Management Mining, Metallurgy and Exploration (628f8beb-a11f-4959-9732-f55591f8de9a)By Brendan Demich, Joseph McGuire, Emily J. Haas
Near misses recorded and reported by workers can provide awarenessto the potential causes of injury and prompt safety management initiatives. Although most companies require near-miss reporting, it is
-
Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump EquipmentBy A. Yazadni-Chamzini
Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl
Jan 1, 2012
-
Planning and Design of the A3 Hindhead Tunnel, Surrey, United KingdomBy Tom Ireland, Tony Rock
The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons
Jan 1, 2007
-
Numerical Evaluation of Tunnel Lining in Visco?elastic creep active groundBy Kyoosang Yoo
The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of
Jan 1, 2010
-
El Abra - Two Years LaterBy Rainer Kahrger
This paper is a follow-up to the paper presented at the SME meeting in April of 1996. Since then, the El Abra facility has been started up, 9 months ahead of schedule, and has processed about 45 milli
Jan 1, 1998
-
Effects Of Obstructions, Sample Size And Sample Rate On Ultrasonic Anemometer Measurements UndergroundBy A. L. Martikainen
In fluctuating airflow, continuous air velocity recording is the most reliable method of air velocity measurement. It allows for fast recognition of changes and the calculation of long-term averages.
Jan 1, 2011