Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Evaporative Inspired Air Cooler For Recirculatory Breathing Apparatus - IntroductionBy R. C. Burton
One of the major problems encountered with recirculatory breathing apparatus presently used by mine rescue teams is that the inspired air becomes uncomfortably, and often dangerously, hot. This is als
Jan 1, 1980
-
Mine Safety & Health - SME StatementEmployee safety and health is of paramount importance for SME and its members. Many SME members work daily in our Nation's mines or have a direct impact on others that work in the mines. SME s
Jan 1, 2011
-
Mining Engineering – Shovel and Excavator SurveyBy Lane White
In mid-April 1992, MINING ENGINEERING mailed a survey questionnaire relating to mining shovels and hydraulic excavators to 125 SME members working at surface mines or at the headquarters of companies
Jan 1, 1992
-
Automatic Creation Of Ore-Selection And Blast Polygons Using Clustering AlgorithmsThere are multiple stages in a mining operation that a mining engineer has to draw polygons to be used as operation guidelines. These polygons are drawn by hand and based on engineer?s experience. How
Feb 27, 2013
-
Operating speed assessments of underground mining equipmentBy J. P. Ducarme
Numerous fatal/nonfatal accidents involving underground workers struck by powered machinery occur yearly, with continuous miners and roof bolters involved in the majority of these accidents. In an att
Jan 3, 2010
-
Lyon–Turin Long and Deep Railway Tunnel ProjectBy P. Fauvel, V. Nasri
In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over
Jan 1, 2005
-
The Planning, Design and Construction of the Tuas Cable Tunnel and Future Power Transmission Cable Tunnels in SingaporeBy G. D. Mainwaring, Weng L. W, Lam Y. K.
The first power transmission cable tunnel in Singapore was the 2.6km long undersea tunnel between Pulau Seraya and mainland Singapore, constructed in the1980s. Ten years later, similar concepts were u
Jan 1, 2001
-
Solving a conundrum: Why a conventional wet gravity circuit was abandoned in flowsheet design for a garnet project in Central AustraliaBy S. J. Benson
The Harts Range deposit, owned by Olympia Resources is located some 130 kms northeast of Alice Springs, in central Australia (part of Australia’s Northern Territory). The core economic minerals here
Jan 1, 2005
-
Mitigation Measures To Minimize Subsidence Damages Caused By Longwall Mining To Historic Structures & Their EffectivenessBy K. Kohli
A case study involving a historic structure undermined by longwall mining is presented in this paper. The location of this study is in South Western-Pennsylvania; USA. The structure is 150-years old a
Jan 1, 2002
-
Enhancing the benefits of projects through local procurementBy M. A. Barclay, D. Samson, A. M. Esteves
Several companies have adopted policies and standards aimed explicitly at increasing ‘local procurement’, recognising that local economic participation has benefits for companies and communities alike
Jan 1, 2011
-
Reprocessing Of A French Guyana Operation Tailings Using Flotation For Gold Concentration - Introduction - Preprint 09-062Compagnie Miniere Esperance (CME), a mining company based in French Guyana, operates a gold primary ore body in open pit. The ore is processed through crushing, grinding and gravity separation. Tailin
Jan 1, 2009
-
Planning New Metro Subways - Los Angeles, CABy Amanda Elioff
Success of the Gold Line Eastside Ex-tension rail tunnels in Los Angeles, CA has prompted the Los Angeles County Metropolitan Transportation Authority?s (Metro) planning new rail lines to include unde
Jan 1, 2009
-
Statistical Significance Of Some Operating Parameters On Dolomite Removal From Phosphate Using Amphoteric CollectorBy A. M. Elmahdy
An amphoteric collector was tested for dolomite removal from phosphate ore. The effects of some operating parameters and their significance on the flotation of dolomite were studied using statisticall
Jan 1, 2007
-
The Bioleaching Of Sulfide Minerals; Developments In Understanding The Mechanism and Kinetics Of Bioleaching Pyrite, Arsenopyrite And ChalcopyriteBy G. S. Hansford, C. J. N. Dempers, G. E. Searby, A. W. Breed, M. A. Jaffer
The bioleaching of sulfide minerals involves a ferric attack of the mineral with the role of the micro-organisms being the oxidation of the ferrous-iron back to the ferric form, and the oxidation of s
Jan 1, 2000
-
Underground Mining Method Selection By Using Multiple Attribute Decision Making Methods - Introduction - Preprint 09-127By M. Yavuz
Underground mining method selection (UMMS) is one of the most important issues in mining engineering. Underground mining method should be primarily selected to make use of underground resources optima
Jan 1, 2009
-
Comparison of the transverse load capacities of various block ventilation stoppings under arch loading conditionsBy T. M. Barczak
Stoppings are required to resist lateral forces on the face of the structure to control pressure differentials created by ventilating air. The design criteria in other parts of the world, including Au
Jan 1, 2009
-
Los Angeles Metro Gold Line Eastside Extension—Tunnel Construction Case HistoryBy Christophe Bragard, Brett Robinson
This paper reflects the challenges encountered during the construction of the light rail tunnels under Boyle Heights, in Los Angeles, California. Equipped with two state-of-the-art EPB TBMs, the c
Jan 1, 2007
-
Thermodynamic Evaluation On Gold Oxidation And Reduction Mechanisms In Ammonium Thiosulfate SolutionBy H. Arima, T. Fujita, W. Yen
The copper catalyzed gold oxidation and reduction mechanisms in ammonium thiosulfate solution were investigated by Eh-pH diagram based on the optimum reagent combination for 60 mass% -75 µm silicate o
Jan 1, 2002
-
Alignment Of Short-Term And Operational Plans Using Discrete Event SimulationThe fundamental objective of mine plans are usually to maximize the mine profit by extracting ore at the lowest possible cost over the mine life while some technical constraints are satisfied. Since t
Jan 1, 2012
-
Copper Precipitation And Cyanide Recovery Pilot Testing For The Newmont Yanacocha ProjectBy S. Acar, M. Botz
Introduction In 2007, Newmont Mining Corporation will begin construction of a milling and cyanidation leaching circuit for the Yanacocha site in Peru. Ore to be processed in the circuit contains a r
Jan 1, 2007