Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Practical Experiences with the Use of Air-Decks in Quarry Blasting

    By Peter Moser, Frank Chiapetta, Sacha Diaj, Florian Bauer

    Good toe breakage and a flat working bench after blasting are important parameters to achieve a high productivity during material loading and reduce the necessity for secondary blasting. Good toe brea

    Jan 1, 2009

  • ISEE
    How Electronics Initiation has Changed the Rules of Blast Design

    By Thierry Bernard

    For many years now electronic initiation has brought the time parameter to the centre of blast designs forever. Although this parameter existed before the era of electronic detonators, Blasting engine

    Jan 1, 2005

  • ISEE
    History and Current Trends on Explosives Use for Avalanche Control in the USA

    By Bill Williamson, Doug Richmond, Kerri Kuntz, Gus Gilman, Larry Heywood

    This was a description by the poet of what occurred over two centuries earlier to Hannibal’s troops as he passed through the Alps. Interestingly, the pass that many feel is the route that Hannibal cho

    Jan 1, 2009

  • ISEE
    Using the Superposition of Seed Waveforms to Predict Seismic Effect by Blasting

    By Yang Jun, Qu Mei, Zheng Yao-wu, Chi Li-yuan

    Due to the necessity of the prediction of blasting seismic effect around strip mine bench blasting area, the paper provides a method to predict the blasting seismic effect by employing the superpositi

    Jan 1, 2015

  • ISEE
    Small Scale Testing of the Effect of Powder Factor, Timing and Charge Distribution on the Impact Breakage of Rocks

    By A Tawadrous, P D. Katsabanis, S Kim

    A series of small scale tests, have been performed to establish the effect of powder factor and initiation timing on the grindability of rocks. The blasts were performed in high quality granite blocks

    Jan 1, 2009

  • ISEE
    Study of Blasting Produced Air Overpressure in Urban Area

    By Zou Dingxiang

    Rock blasting in the project of “Site Formation and Associated Infrastructure Works at Choi Wan Road and Jordan Valley” is the largest urban blasting project in the history of Hong Kong and also is ra

    Jan 1, 2007

  • ISEE
    Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site Manager

    By Steve Dillingham

    Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m

    Jan 1, 2001

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995

  • ISEE
    Study of Heat Resistant Commercial Explosives

    By Fumihiko Sumiya, Shinya Tanaka, Yukio Kato, Kenji Tanaka, Tetsuya Sawada

    When explosives are heated under an acidic environment due to metal sulfide and sulfuric acidity, their decomposition temperature falls remarkably and decomposition reaction occurs quickly, and then e

    Jan 1, 2003

  • ISEE
    Micro Economic Forces in the Mining and Explosives Industries

    By David P. Reddick

    Economics is a social science dealing with the allocation of scarce resources. In modern times the “science” was identified by Adam Smith in his book, The Wealth of Nations, written in 1776. Mr.Smith,

    Jan 1, 1992

  • ISEE
    Use of a Bubble Curtain to Reduce Fish Mortality during Explosive Demolition of Licks and Dam 26, Mississippi River

    By Thomas M. Keevin, Gregory L. Hempen, David J. Schaeffer

    In an attempt to reduce the potential for fish mortality during the explosive demolition of Locks and Dam 26, Mississippi River, the U.S. Army Corps of Engineers, St. Louis District explored the use o

    Jan 1, 1997

  • ISEE
    The Use of High Explosives to Conduct a Fisheries Survey at a Nemdway Weir Field on the Middle Mississippi River

    By Michael Peterson, Robert Davinroy, Robert Rapp, Gregory Hempen, David Herzog, Thomas Keevin

    Fish sampling in a deep-water, high velocity, environment is extremely difficult. Conventional techniques such as electro-fishing and netting have been limited to depths generally less than 7 meters (

    Jan 1, 2002

  • ISEE
    Drill Accuracy

    By Jerald E. Harris

    "Often taken for granted, drill accuracy plays a major role in the relative success or failure of a blast.Expensive technological advances in equipment capabilities, drilling tools, communications, ex

    Jan 1, 1999

  • ISEE
    Using Vibration Prediction to Reduce Blasting Costs and Complaints (c2b05a63-1c96-45ce-a036-acc1a0a37215)

    By Thomas Leonard, Philip R. Berger, Bryan E. Papillon

    Bardon Trimount Inc., a large producer of aggregate, crushed stone, and concrete, was experiencing significant public opposition to its five quarries in the Boston area. It was believed by the authors

    Jan 1, 1996

  • ISEE
    Effects of Decoupling and Simultaneous Detonation on Blast Vibrations

    By Rodney D. Lamond

    The need for blast vibration monitoring can be attributed to a combination of three factors: Structural damage, Blast design and Human annoyance. Traditionally, vibration damage criteria are prescribe

    Jan 1, 1995

  • ISEE
    Safety Talk - Misfires: What All Employees Need to Know

    By Robert Morgan

    The mind-set that only blasters and their helpers need training in explosives can result in risk to other employees working at mine or construction sites where blasting is conducted. Misfires are not

    Jan 1, 2004

  • ISEE
    Drilling Efficiency and the Associated Benefits to the Mining Process

    By Lee B. Paterson

    Mining Engineers throughout the world have an appreciation for the importance of the role of the Blasthole Drill in one of the primary elements of the mining process. This paper highlights areas that

    Jan 1, 2000

  • ISEE
    The Application of Mid-Column Air Decks in Full Scale Production Blasts

    By Barend Botha, Trevor Davids

    The presence of an extensive soft siltstone layer in the middle of the inter-burden sequence of rocks at Syferfontein Colliery in the Republic of South Africa prompted tests to determine the effect of

    Jan 1, 2000

  • ISEE
    Applying the Concept of Difficulty of Tunnelling to Brazilian Cases

    By Luiz Guilherme Isfer Maciel, Marilena Cardu, Fernando Golin, Jacopo Seccatore

    "This study applies the concept of the difficulty of tunnelling by drilling an blasting (D&B) to selectedcases from the Brazilian tunnelling industry. The difficulty of tunnelling has been defined in

    Jan 1, 2017

  • ISEE
    Problems in the Russian Blasting Industry

    By Boris Belenky, M M. Graevsky, R I. Semigin, A E. Frantov

    "In the mining industry, most of stripping and rock fragmentation is performed by blasting. The academician N.V. Melnikov has projected that blasting methods would be used to crush 20% of soft rocks a

    Jan 1, 1995