Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Strategic Public Relations for Underground Conservatory at Tennessee Governor’s Residence

    By Jake Hutchison, Wade Hutchison

    The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro

    Jan 1, 2009

  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th

    Jan 1, 1997

  • ISEE
    A Practical Approach to Managing Control of Flyrock

    By Simon St. John Tose

    We have had a long history in supporting the development of training material to ensure “safe” blasting. This has been provided as both significant technical guidance to the industry and input into th

    Jan 1, 2013

  • ISEE
    Seismic Analysis of Explosive Performance

    By Shazad Hosein, William Birch, Douglas A. Anderson

    This paper will present the results of tests of a new method for assessing explosive performance using wavelet transform analysis of standard blast seismograms. The theoretical background of the metho

    Jan 1, 2015

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    Traditional dilution control systems range from computer modeling, use of physical markers on the field as polypipes to a technology that marks some control points where displacement is measured. The

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • ISEE
    "Suppression of Dust Generation during Blast Demolition of ConcreteColumns"

    By Chulgi Suk, Hoon Park, Hyonsoo Kim, Hakman Kim, Sangho Cho

    Dust emission from blast demolition and other construction activities can be a nuisance; it is widely recognized that fine particles less than 10 µm in equivalent diameter (called PM10) may cause heal

    Jan 1, 2016

  • ISEE
    Design and Testing of Bubble Curtain at Whirl Bay, BC

    By Alastair Grogan

    In October of 2002, the author was retained by Public Works and Government Services Canada, on behalf of the Department of National Defense, to design, construct and test the effectiveness of a bubble

    Jan 1, 2005

  • ISEE
    Blasting Seismograph Comparison in Side-by-Side Blast Monitoring Tests

    By Kenneth Eltschlager, Jim Ratcliff, Michael Mann, Edward Sheehan

    The Appalachian Blaster Certification Delegation initiated a study to compare the consistency of measurements from blasting seismographs. Six blasts were monitored at surface coal mines in West Virgin

    Jan 1, 2015

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • ISEE
    Rock-to-Sensor Transmissibility of Vibrations?Part 2

    By R Castedo, L. M. Lopez, J. A. Sanchidrian

    In 2014 the authors presented results from 13 tests made with two blasting seismographs on a vibration exciter. They measured coupling transmissibility as function of frequency (i.e. ratio of the vel

    Jan 1, 2015

  • ISEE
    Blasting and Comminution Choices for the Management of the Mining Business

    By Alexandre Passos, Giorgio De Tomi, Tatiane Marin, Dennis Cremonese, Jacopo Seccatore

    "In the mining industry, rock excavation is the first phase of the comminution process. Downstreamoperations such as secondary breaking, crushing and milling terminate the process, reducing the size o

    Jan 1, 2016

  • ISEE
    A Practical Guide for the Blasting of Armour Stone or Riprap

    By Alastair Grogan, Ron Elliott, Dale MacLean

    Blasting for armour stone presents many unique challenges. Often, blasters get themselves into trouble when they assume that they can simply modify a production blast design to produce the required fr

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • ISEE
    Determining and Mitigating the Effects of Firing a Linear Shaped Charge Underwater

    By Brian T. Burch, Paul N. Worsey

    When fired, submerged Linear Shaped Charges (LSCs) lose all effectiveness in the cutting of steel. Users in underwater applications have reported having to substantially increase the charge size to th

    Jan 1, 2015

  • ISEE
    Trench Blasting Guidelines & Pitfalls

    By Vic Sterner

    As cities and towns continue to grow, the need to install sewer, water, gas and other utilities becomes a necessity and the blasting of trenches for these service lines probably constitutes one of the

    Jan 1, 2004

  • ISEE
    Electronic Detonator and Initiation Systems - Implications of the Dominant Design for Widespread Acceptance and Sales of this 'New' Technology

    By Steve Brace

    Electronic detonators have been commercially available to the mining industry worldwide for over ten years. It is estimated that total cumulative global sales will have reached 25 million units by the

    Jan 1, 2004

  • ISEE
    600 000 M.T to move, a High Risk Operation

    By Jean-Sébastien Lambert, Serge Roberge

    "At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their

    Jan 1, 2016

  • ISEE
    Estimation of Amount of Heavy Metal Deposit of Open Surface Mass Detonations per Unit Area

    By M. Hokkanen, M. Hagfors

    The Finnish Defence Forces has destroyed old and spoilt munitions in open surface mass detonations at Hukkakero fell in municipality of Kittilä, Lapland, since 1988. The technique was learned from Swe

    Jan 1, 2015

  • ISEE
    COMPARISON OF IMESAFR DEBRIS DENSITY RESULTS TO ISO-1 and ISO-2 TEST Data

    By Amos Bryant, Jesse Davis

    This paper compares the predictions of the latest Institute of Makers of Explosives Safety Analysis for Risk (IMESAFR) model versus physical test data recovered from ISO-1 and ISO-2 tests in Woomera,

    Jan 1, 2010