    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003

  • DFI
    A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles

    By Sridhar Krishnan

    This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p

    Jan 1, 2006

  • DFI
    Time-Dependent Bond Regain In Driven Piles In Permafrost ? Synopsis

    By B. Ladanyi

    The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i

    Jan 1, 2010

  • DFI
    Design Considerations For Underground Subway Station - Introduction

    By Mohammed Z. Islam

    As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o

    Jan 1, 1993

  • DFI
    Caltrans Bridge Seismic Design/Retrofit Criteria ? Synopsis

    By Brian Maroney

    In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T

    Jan 1, 1993

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    Uplift Capacity Of Drilled Piers In Clay - Synopsis

    By Braja M. Das

    Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat

    Jan 1, 1987

  • DFI
    Easy Static Load Tests: Expert Results

    By M. England

    Test equipment has been developed to record automatically both the displacement of the pile head and the load applied during a conventional maintained load pile test. Some systems also have, in additi

    Jan 1, 2002

  • DFI
    O Street Anchored Precast Lagging And Soldier Pile Retaining Wall

    By John Wise

    Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu

    Jan 1, 2003

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    Behavior Of Excavation With Sheet Piling In Soft Clay ? Synopsis

    By G. X. Zeng

    A calculation programme of finite element method has been developed in order to study the behavior of excavation with sheet piling in soft clay. Based on a series of isotropically consolidated-undrain

    Jan 1, 2010

  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • DFI
    Recent Advances In Soil Nailed Earth Retention

    By Tom A. Armour

    Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&

    Jan 1, 2003

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • DFI
    CSM Cutter Soil Mixing - A New Technique For The Construction Of Subterranean Walls Initial Experiences Gained On Completed Projects

    By E. Stoetzer

    In all known deep mixing processes the existing soil is mixed with self hardening slurry by mixing tools that rotate about a vertical axis (augers, mixing paddles). Wall panels are constructed using s

    Jan 1, 2006

  • DFI
    Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult Conditions

    By J. C. W. M. de Wit

    An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the

    Jan 1, 2006

  • DFI
    Recent Developments In Continuous Flight Auger Piling

    By P. H. Derbyshire

    The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des

    Jan 1, 1989

  • DFI
    Performance of Footings in Rock Based on Serviceability

    By C. M. Haberfield

    "1 INTRODUCTION Around the world, there is a demand for larger structures, tall buildings and large bridges. While good footing design is important for all structures, it is even more important in the

    Jan 1, 1900

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006