    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • DFI
    Excavation Support At The Capitol Visitor Center In Washington DC

    By Harald Ludwig

    In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site

    Jan 1, 2006

  • DFI
    A Decade Of Concrete Embedded Walls In UK - Synopsis

    By Robert Fernie

    Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u

    Jan 1, 2000

  • DFI
    Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges

    By Shawna Munn, Jakub Hudler

    This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines

    Jan 1, 2018

  • DFI
    Construction Of Effluent Outfall Diffusers For The Boston Harbor Project

    By Geoffrey D. Collins

    This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay

    Jan 1, 1994

  • DFI
    Deep Mixing in the United States: Milestones in Evolution

    By Donald A. Bruce

    "Abstract The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments we

    Jan 1, 2014

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON Project

    By Elizabeth M. Smith

    The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss

    Jan 1, 2009

  • DFI
    The Application Of The Caisson In China

    By Chen Xizhe

    The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can't sink, the caisson c

    Jan 1, 1991

  • DFI
    Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:

    By Robert W. Bergwall

    The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T

    Jan 1, 1997

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Analyses On Laterally Loaded Cast-In-Place Concrete Piles ? Synopsis

    By Makoto Kimura

    Failure tests on laterally loaded single and pile group are analyzed with a 3-dimensional elasto-plastic finite element program. In the analysis, the mechanical behavior of the ground is supposed to b

    Jan 1, 1996

  • DFI
    The Bawang Pile ? A New Type Of Pile ? Synopsis

    By B. Broms

    The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b

    Jan 1, 2010

  • DFI
    3 Recent Developments In Pile Design - Developments In Pile Design

    By W. F. Van Impe

    The design of piles and of pile groups has remarkably progressed over the past two decades. The in­creasing complexity of the building concept implements a more rational approach of the deep foundatio

    Jan 1, 1994

  • DFI
    Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? Synopsis

    By Y. G. Li

    The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c

    Jan 1, 2010

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Micropiles And Anchor Piles - The Liberty Bridge

    By Daryl W. Wurster

    The Liberty Bridge in Greenville, South Carolina is a curved, cable-stayed, pedestrian bridge with primary support provided by two towers. The bridge is part of the Falls Park redevelopment. The bridg

    Jan 1, 2006

  • DFI
    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008