    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Lateral Load Tests On Drilled Piers In San Diego Area Residual And Formational Soils

    By Kul Bhushan

    This paper presents the results of lateral load tests on 0.61-m to 1.27-m (24 to 50-inch) diameter drilled and cast-in-place piers in San Diego area residual/formational soils. The test piers were ins

    Jan 1, 2002

  • DFI
    Diaphragm Walls And Barrettes For Top-Down Construction: A Project Report

    By Bjöm Böhle

    Top-down construction (or cut and cover construction) is providing important advantages when comparing with conventional construction techniques for commercial developments with deep basements, underg

    Jan 1, 2006

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • DFI
    Mechanical Characterization of a Chemically Stabilized Soft Soil Reinforced with Fibers When Subjected to Tensile Solicitations

    By J. M. N. P. C. Teles, Venda Oliveira P. J., Correia A. A. S.

    "AbstractA laboratory work was performed to study the mechanical behavior of a Portuguese soft soil chemically stabilized with binders and reinforced with metallic fibers when subjected to tensile str

    Jan 1, 2014

  • DFI
    An Improved Method For The Prediction Of Pile Bearing Capacity From Dynamic Testing

    By R. T. Stain

    Dynamic methods of load testing piles using a drop hammer to generate the input force have been in use for many years. These systems are based on the wave equations developed at the Case Institute of

    Jan 1, 1989

  • DFI
    World Financial Center Foundations, New York

    By G. Tamaro

    The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose

    Jan 1, 1989

  • DFI
    The Effectiveness Of The Monotube Pile Taper At The Highway 280 Pile Uplift Test Site ? Introduction

    By Samuel J. Kosa

    The Monotube is a uniformly tapered high-strength steel shell pile manufactured for friction pile applications. The Monotube pile was developed in the early 1920's in Canton, Ohio. Its first comm

    Jan 1, 1993

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • DFI
    Pin Piles For Seismic Rehabilitation Of Bridges

    Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i

    Jan 1, 1993

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Mitigating Settlement with Pile-Supported Approach Slabs

    By Reda M. Bakeer

    "An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t

    Jan 1, 2017

  • DFI
    Re-Use Of Foundations And The Role Of NDE Techniques

    By Huw Williams

    It is becoming increasingly common practice to re-use existing foundations for new projects, especially on urban sites where geotechnical conditions are congested. A knowledge of the foundation dimens

    Jan 1, 2006

  • DFI
    Single Pile Settlement Prediction And Analysis For Driven Piles

    By David R. Beadman

    The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid

    Jan 1, 2006

  • DFI
    Driven Piles For New Pacific Northwest Baseball Park - Introduction

    By Thomas M. Gurtowski

    The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th

    Jan 1, 1998

  • DFI
    Vibration Environmental Effect Of Construction Operations - Synopsis

    By Mark R. Svinkin

    Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel

    Jan 1, 2000

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • DFI
    Dynamically Cast-In-Place Piles

    By John J. Vieaux

    Allowable loads on Dynamically-Cast-In-Place Piles (the Franki type) can be correlated with N values from the Standard Penetration Test. Using a constant developed by Nordlund, a conservative value fo