Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator

    By Barun Gorain, Andy Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2002

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • CIM
    The Quintette Project

    By W. R. Leeder

    "The Quintette coal property lies in the Rocky Mountain foothills of northeastern British Columbia (see Figure 1). Quintette and the adjacent Bullmoose property of Teck Corporation are soon to become

    Jan 1, 1983

  • CIM
    Chapter 13. Miscellaneous Royalty Provisions

    By Karl J. C. Harries

    13.1. RIGHT TO RECEIVE ROYALTY CONTRACTUAL ONLY1

    Jan 1, 2003

  • CIM
    Why SA Matters: Cost of Lacking Operator SA

    Scope / Agenda ? What is Situation Awareness (SA)? ? Background on SA theory ? SA is critical in a wide variety of domains ? SA and human performance ? Consequences of poor SA ? Significant chal

    Aug 1, 2013

  • CIM
    Tuluwaka Mine – From Greenfield to Production in 14 Months

    By Ross Nairn

    "Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani

    Jan 1, 2006

  • CIM
    Effects of Solids Loading on Cyanidation Rates

    By Ralph Harris, Qi Xia

    "Gold cyanidation rates are known to be limited by the rate of oxygen dissolution in the cyanidation tanks. The effect of solids loading on the oxygen dissolution rates is not obvious and the results

    Jan 1, 1997

  • CIM
    Lake St. Joseph - Iron Ore Prospect to Superconcentrate Project

    By F. R. Jones, B. W. Taylor, A. R. MacPherson, L. J. Lamb

    "The Lake St. Joseph Iron Deposit is in Northwestern Ontario. Exploration to date by Steep Rock Iron Mines Limited has indicated an ore reserve of 683 million long tons. Metallurgical investigations h

    Jan 1, 1972

  • CIM
    Designing For Paste Thickening

    By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts

    "In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated

    Jan 1, 2005

  • CIM
    New Process of Eluting Gold from Activated Carbon

    By Tony Robles

    "A new process is disclosed for the recovery of gold and/or silver values from activated carbon wherein they are adsorbed as cyanide complexes. A unique chemistry allows the new process to use mill pr

    Jan 1, 2000

  • CIM
    The Weird World of the Nanoscale

    By Michael B. Cortie

    The young field of nanotechnology has as its objective the design and construction of useful devices made of nanoscale materials. Objects or structures which have at least one important dimension in t

    Oct 1, 2003

  • CIM
    High Pressure Washing Technology “Hydro-Clean”

    By Sam Palombo, James José Varela

    "Washing can be defined as the process used to eliminate or reduce the dirt (presence of fines or slimes) of one material. It is also the basic and oldest process applied to ore preparation for furthe

    Jan 1, 2009

  • CIM
    Regulatory Tendencies And Abatement Technologies Used In The Chilean Copper Industry

    By M. Sanchez

    In the last decades, the Chilean copper mining and metallurgical industry have had to modify their technological processes to meet the environmental regulations implemented by the Chilean government,

    Jan 1, 2007

  • CIM
    Indexes of Mine Microseismic and their Application in Safety Assessment by Statistical Evaluation at Luomu Mine

    By J. Hu, F. Lin, R. Chen, F Peng, S. Yang, W. Yu

    "Microseismic monitoring technology has become one of the most effective method of mine ground pressure monitoring after decades of development. But safety assessment of mine ground pressure by using

    Jan 1, 2015

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    Development of a spontaneous heating liability index of coal from kinetic parameters

    By H. B. Sahu, N. M. Mishra, D. C. Panigrahi

    The paper presents the development of a spontaneous heating liability index (SHLI) of coal based on a mathematical approach. The parameters for the calculation of this index have been determined by di

    Jan 1, 2008

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    On-Line Flotation Simulator at Pyhäsalmi Mine

    By K. Zenger, J. Kaartinen, J. Huuskonen, S. Torttila, S. Lähteenmäki, J. Pietilä

    "Pyhäsalmi Mine in Finland has a long history of continuous process development. The concentrator processes Cu-Zn-sulphide ore with high recoveries. An on-line flotation simulator has been developed t

    Jan 1, 2015

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    A Re-Examination of the Sacred Cows in the Sart Process

    By M. Melashvili

    "The SART Process was introduced to the gold mining industry in the late 1990s and several commercial plants were built over the following 10 to 15 years. Most of these plants have operated well and e

    Jan 1, 2016