    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Marketing junior exploration in Quebec and Canada: The 4 Ps

    By Jacque Trottier, Marcel Vallée, Gratien Gélinas

    "Mineral exploration in Canada traditionally has gone from boom to bust in cyclical pat-terns following market and discovery cycles, but other endemic factors related to exploration financing and perf

    Jan 1, 1996

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • CIM
    Flotation Control Based on Froth Textural Characteristics

    By Patrick Pelletier, Pierre-Alexandre Bossé, Julie Fournier, Gianni Bartolacci, Jayson Tessier, Ahmed Bouajila, Carl Duchesne

    "This paper summarizes research into the study of the control of flotation processes based on froth images. The use of numerical image analysis techniques for the extraction of significant patterns (f

    Jan 1, 2005

  • CIM
    Towards Petrophysical Characterization of Comminution Behavior

    By Peter Fullagar, Adel Vatandoost, Steve Walters, Toni Kojovic

    "Traditional comminution tests are a vital component in every mine plant design. Comminution behavior governs both the cost of equipment and its operating efficiency. Most comminution tests are conduc

    Jan 1, 2009

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Comparative Study on Flotation Performance of Stockpiled and Fresh Ore Samples

    By C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar

    "As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B

    Jan 1, 2006

  • CIM
    Transforming the Effectiveness of the HPGR Circuit at Anglo Platinum Mogalakwena

    The Anglo Platinum Mogalakwena North concentrator was one of the first three hard rock mineral processing applications to utilise a HPGR circuit in preference to a SAG milling circuit. This was driven

    Jan 1, 2012

  • CIM
    A Historical Survey of the Methods Used to Reduce the Size of Ore at the Holliger Mine

    By I. M. Gordon, J. Blackshaw

    "Run-of-mine ore is reduced to 4 per cent on 4 mesh (3/ 16 inch), using four stages of dry crushing. The mill feed is then reduced to 2 per cent on 48 mesh and 60 per cent through 200 mesh, using one

    Jan 1, 1965

  • CIM
    Significant Improvements are Possible from Process Optimization

    By Jon R. Maki

    "EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for

    Jan 1, 2014

  • CIM
    Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes

    By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne

    "The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers

    Jan 1, 2003

  • CIM
    Comparison of Artificial Neural Networks and a Geostatistical Method in Grade Estimation

    By Hamid Mahmoudabadi

    In the present paper, the performance of four approaches based on neural networks and geostatistical method for grade estimation are compared and analyzed their performance to find a proper method. Fo

    Oct 1, 2009

  • CIM
    Distributions of Flow Characteristics and Physicochemical Properties of Acid Mine Drainage in a Settling Pond

    By Dong-kil Lee

    Field tests have been conducted to investigate the characteristics of flow and physical chemistry of acid mine drainage(AMD) in the Hwangji-Yuchang settling pond in south Korea. pH and ferrous concent

    May 1, 2011

  • CIM
    Review of Noront’s Eagle’s Nest Project

    By Paul Semple

    "In 2007, Noront Resources Inc. discovered the high grade nickel copper PGE deposit in northwestern Ontario in a region now known as the Ring of Fire. Since the initial discovery, Noront has advanced

    Jan 1, 2013

  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Speciation of Sorbed Gold

    By Stephen L. Chryssoulis, Stamen Dimov

    "Preg-robbing has been known for many years, where increased losses are suffered because dissolved gold is removed from solution by adsorption onto carbonaceous matter. In direct cyanidation circuits

    Jan 1, 2004

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t